Page views this IP this session = 1 of 10 unsubscribed pagesNewton Farm Solar Farm
Newton Farm Solar Farm (Solar , Active) Location in the UK : England, Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 8.1 MW Approx Date of 1st power generation: March 2014
/YES
North of Newton Farm Newton Farm Lytchett Minster BH16 6HR England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
North of Newton Farm 3 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Dorset Country: England LPA: Purbeck District Council
|
Site ID and Reference: |
2047 / IF1443
District:
|
Applicant: |
Primrose Solar
Application :
6/2013/0133
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Lytchett Minster, Poole, Dorset
|
|
|
County: |
Dorset Region: South West
|
OS Coordinates: |
393388 / 393388
|
Development Status: |
Operational
|
Application Submitted: |
3/6/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
3/19/2014
|
This Record Last Updated: |
3/6/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Newton Farm
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00177RUEN
|
Capacity: |
9272
|
Status: |
Live
|
Accreditation Date: |
3/6/2013
|
|
|
Commission Date: |
3/19/2014
|
|
|
Applicant: |
Equitix Solar (2) Limited
|
Applicant Address: |
3rd floor
Connaught House
1-3 Mount Street
London
W1K 3NB
England
|
Address: |
Newton Farm
Lytchett Minster
BH16 6HR
England
|
Project Info |
Residents’ fury at solar farm plans The farm, proposed by power company Camborne Energy, is comprised of three sites, ranging from 13.7 to 16.7 hectares. But it is the smallest of the three sites – the NEWTON FARM North site – that has caused the most consternation among villagers.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|