Page views this IP this session = 1 of 10 unsubscribed pagesSlieve Rushen Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Slieve Rushen Wind Farm (Wind , Active) Location in the UK : N.Ireland, Co Fermanagh Type of installation: Wind on/offshore: on Turbines :18 Capacity : 54 MW Approx Date of 1st power generation: April 2008
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Superceded by 54MW phase II
The aim of the project Slieve Rushen I was to build and operate a 5 MW windfarm using the newly
developed Vestas 500 kW wind turbines and to gain experience of them. The windfarm is being developed by a large industrial energy consumer i.e. a 450,000 tpa
cement factory.
Model: |
Vestas V90
|
Start Speed: |
3.5
|
Capacity: |
3
|
Optimal Speed: |
15
|
Rotor Diameter: |
90
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:76
|
Avg. Elevation: |
372
|
Web Page: |
http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v90-3.0-mw.aspx#/vestas-univers |
Comment: |
The V90-3.0 MW is designed to be low weight, making it easier to transport and install and reducing foundation costs thanks to its lower load.
|
Slieve Rushen Phase II - A (23/10/2007) Derrylin BT92 9AU Northern Ireland
Relationship |
Company (For:
Slieve Rushen
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Slieve Rushen Extension 54 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4504 / EN00198
District:
|
Applicant: |
Application :
L/2004/2058/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
54 |
Site Address: |
Slieve Rushen
Derrylin
Fermanagh
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
33019 / 33019
|
Development Status: |
Operational
|
Application Submitted: |
11/4/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
4/15/2008
|
This Record Last Updated: |
9/25/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Slieve Rushen Phase 1 Wind Farm 5 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3122 / N0006W1
District:
|
Applicant: |
Sean Quinn Group
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
0.5 |
Height of Turbines: |
|
Calculated capacity: |
5 |
Site Address: |
Slieve Rushen
Derrylin
20km south of Enniskillen, County Fermanagh
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
33019 / 33019
|
Development Status: |
Operational
|
Application Submitted: |
5/15/1992
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/1995
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Slieve Rushen Phase II - A (23/10/2007)
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R00027NQNI
|
Capacity: |
53312
|
Status: |
Live
|
Accreditation Date: |
5/15/1992
|
|
|
Commission Date: |
10/1/2007
|
|
|
Applicant: |
Mantlin
|
Applicant Address: |
Gortmullan
Derrylin
Co Fermanagh Northern Ireland
BT92 9AU
|
Address: |
Slieve Rushen Phase II - A (23/10/2007)
Derrylin
BT92 9AU
Northern Ireland
|
Capacity: 54.5 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/18/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|