Loading
Page views this IP this session = 1 of 10 unsubscribed pagesSlieve Rushen Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Slieve Rushen Wind Farm (Wind , Active) Location in the UK : N.Ireland, Co Fermanagh Type of installation: Wind on/offshore: on Turbines :18 Capacity : 54 MW Approx Date of 1st power generation: April 2008
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Superceded by 54MW phase II
The aim of the project Slieve Rushen I was to build and operate a 5 MW windfarm using the newly
developed Vestas 500 kW wind turbines and to gain experience of them. The windfarm is being developed by a large industrial energy consumer i.e. a 450,000 tpa
cement factory.
Model: |
Vestas V90
|
Start Speed: |
3.5
|
Capacity: |
3
|
Optimal Speed: |
15
|
Rotor Diameter: |
90
|
Stop Speed: |
25
|
Hub Height |
80 Avg for all turbines:76
|
Avg. Elevation: |
372
|
Web Page: |
http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v90-3.0-mw.aspx#/vestas-univers |
Comment: |
The V90-3.0 MW is designed to be low weight, making it easier to transport and install and reducing foundation costs thanks to its lower load.
|
Slieve Rushen Phase II - A (23/10/2007) Derrylin BT92 9AU Northern Ireland
Relationship |
Company (For:
Slieve Rushen
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Slieve Rushen Extension 54 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4504 / EN00198
District:
|
Applicant: |
Application :
L/2004/2058/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
18 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
54 |
Site Address: |
Slieve Rushen
Derrylin
Fermanagh
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
33019 / 33019
|
Development Status: |
Operational
|
Application Submitted: |
11/4/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
4/15/2008
|
This Record Last Updated: |
9/25/2014
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Slieve Rushen Phase 1 Wind Farm 5 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3122 / N0006W1
District:
|
Applicant: |
Sean Quinn Group
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
10 |
Turbine Capacity: |
0.5 |
Height of Turbines: |
|
Calculated capacity: |
5 |
Site Address: |
Slieve Rushen
Derrylin
20km south of Enniskillen, County Fermanagh
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
33019 / 33019
|
Development Status: |
Operational
|
Application Submitted: |
5/15/1992
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
12/1/1995
|
This Record Last Updated: |
10/8/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Slieve Rushen Phase II - A (23/10/2007)
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R00027NQNI
|
Capacity: |
53312
|
Status: |
Live
|
Accreditation Date: |
5/15/1992
|
|
|
Commission Date: |
10/1/2007
|
|
|
Applicant: |
Mantlin
|
Applicant Address: |
Gortmullan
Derrylin
Co Fermanagh Northern Ireland
BT92 9AU
|
Address: |
Slieve Rushen Phase II - A (23/10/2007)
Derrylin
BT92 9AU
Northern Ireland
|
Capacity: 54.5 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|