Sorry I found no matches, Please try again. 176
vid = 344pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.116.63.107 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Slieve Rushen Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Slieve Rushen Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, Co Fermanagh    
Type of installation: Wind    on/offshore: on
Turbines :18  Capacity : 54 MW
Approx Date of 1st power generation: April 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Superceded by 54MW phase II

The aim of the project Slieve Rushen I was to build and operate a 5 MW windfarm using the newly
developed Vestas 500 kW wind turbines and to gain experience of them. The windfarm is being developed by a large industrial energy consumer i.e. a 450,000 tpa
cement factory.

 Turbine Make and Specs

Model: Vestas V90 Start Speed: 3.5
Capacity: 3 Optimal Speed: 15
Rotor Diameter: 90 Stop Speed: 25
Hub Height 80   Avg for all turbines:76 Avg. Elevation: 372
Web Page: http://www.vestas.com/en/wind-power-plants/procurement/turbine-overview/v90-3.0-mw.aspx#/vestas-univers
Comment: The V90-3.0 MW is designed to be low weight, making it easier to transport and install and reducing foundation costs thanks to its lower load.

 Address

Slieve Rushen Phase II - A (23/10/2007) Derrylin BT92 9AU Northern Ireland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Slieve Rushen )

 DECC Data on this Project: Slieve Rushen :3122

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Slieve Rushen Extension     54 MW
Energy Type: Wind Onshore
County: Co. Fermanagh     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 4504 / EN00198     District:
Applicant:     Application : L/2004/2058/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 18 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 54
Site Address: Slieve Rushen Derrylin Fermanagh
 
County: Co. Fermanagh Region: Northern Ireland
OS Coordinates: 33019 / 33019
Development Status: Operational
Application Submitted: 11/4/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 4/15/2008 This Record Last Updated: 9/25/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Slieve Rushen Phase 1 Wind Farm     5 MW
Energy Type: Wind Onshore
County: Co. Fermanagh     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 3122 / N0006W1     District:
Applicant: Sean Quinn Group     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 0.5
Height of Turbines: Calculated capacity: 5
Site Address: Slieve Rushen Derrylin 20km south of Enniskillen, County Fermanagh
 
County: Co. Fermanagh Region: Northern Ireland
OS Coordinates: 33019 / 33019
Development Status: Operational
Application Submitted: 5/15/1992 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/1/1995 This Record Last Updated: 10/8/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Slieve Rushen: Wind : R00027NQNI

Site Name: Slieve Rushen Phase II - A (23/10/2007)
Generator Type: On-shore wind (NIRO code = NQ)
Scheme : RO Generator ID: R00027NQNI
Capacity: 53312 Status: Live
Accreditation Date: 5/15/1992    
Commission Date: 10/1/2007    
Applicant: Mantlin
Applicant Address: Gortmullan Derrylin Co Fermanagh Northern Ireland BT92 9AU
Address: Slieve Rushen Phase II - A (23/10/2007) Derrylin BT92 9AU Northern Ireland

 Calculations


Capacity: 54.5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 54.5 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School