Loading
Page views this IP this session = 1 of 10 unsubscribed pagesPingry Farm Solar Farm
Pingry Farm Solar Farm (Solar , Active) Location in the UK : England, coleford Type of installation: Solar on/offshore: on Solar Panels :30000 Capacity : 3.4 MW Approx Date of 1st power generation: March 2014
/YES
Councillors will be presented with proposals to convert an entire field in Milkwall into a green energy site on Tuesday.
It has been tabled by newly set-up company Coleford Energy Ltd, who estimate it will generate 6,400MWh electricty every year – enough to power more than 1,000 households.
The site is on Pingry Farm, adjacent to the GlaxoSmithKline factory. Hedgerows will largely obscure it from public view Land At Pingry Farm Pingry Lane Milkwall Coleford Gloucestershire GL16 8QD
Relationship |
Company (For:
Pingry Farm
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Pingry Farm - Phase 1 3.4 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Gloucestershire Country: England LPA: Forest of Dean District Council
|
Site ID and Reference: |
2012 / IF1029
District:
|
Applicant: |
Coleford Energy
Application :
P1418/12/FUL
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land At Pingry Farm, Pingry Lane, Milkwall, Coleford
|
|
GL16 8QD
|
County: |
Gloucestershire Region: South West
|
OS Coordinates: |
357121 / 357121
|
Development Status: |
Operational
|
Application Submitted: |
3/6/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2014
|
|
|
Generator Live |
3/24/2014
|
This Record Last Updated: |
5/28/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Pingry Farm - Phase 2 3.4 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Gloucestershire Country: England LPA: Forest of Dean District Council
|
Site ID and Reference: |
5230 /
District:
|
Applicant: |
Coleford Energy
Application :
P1418/12/FUL
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land At Pingry Farm, Pingry Lane, Milkwall, Coleford
|
|
GL16 8QD
|
County: |
Gloucestershire Region: South West
|
OS Coordinates: |
357121 / 357121
|
Development Status: |
Operational
|
Application Submitted: |
3/6/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/2015
|
|
|
Generator Live |
3/25/2015
|
This Record Last Updated: |
5/28/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Milkwall Solar Farm
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
R00473RUEN
|
Capacity: |
2700
|
Status: |
Live
|
Accreditation Date: |
3/6/2013
|
|
|
Commission Date: |
3/25/2015
|
|
|
Applicant: |
Pingry Solar Ltd
|
Applicant Address: |
Green Nation, The Long Barn
Manor Farm
Stratton-on-the-Fosse
Radstock
BA3 4QF
England
|
Address: |
Milkwall Solar Farm
Pingry Lane
Coleford
GL16 8QD
England
|
Site Name: |
Milkwall Solar Farm
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G06078PVEN
|
Capacity: |
2700
|
Status: |
Live
|
Accreditation Date: |
3/6/2013
|
|
|
Commission Date: |
3/25/2015
|
|
|
Applicant: |
Pingry Solar Ltd
|
Applicant Address: |
Green Nation, The Long Barn
Manor Farm
Stratton-on-the-Fosse
Radstock
BA3 4QF
England
|
Address: |
Milkwall Solar Farm
Pingry Lane
Coleford
GL16 8QD
England
|
|
Assumptions: Capacity: 2700kW 2.7 MW, Thus over the month Capacity * 720 hours per month = 1944 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 232 | 8.59% | Issued | 01/02/2018 | | | 215 | 7.96% | Issued | 01/01/2018 | | | 91 | 3.37% | Issued | 01/12/2017 | | | 64 | 2.37% | Issued | 01/11/2017 | | | 124 | 4.59% | Issued | 01/10/2017 | | | 193 | 7.15% | Issued | 01/09/2017 | | | 293 | 10.85% | Issued | 01/08/2017 | | | 400 | 14.81% | Issued | 01/07/2017 | | | 446 | 16.52% | Issued | 01/06/2017 | | | 438 | 16.22% | Issued | 01/05/2017 | | | 445 | 16.48% | Issued | 01/04/2017 | | | 428 | 15.85% | Issued | 01/03/2017 | | | 266 | 9.85% | Redeemed | 01/02/2017 | | | 112 | 4.15% | Redeemed | 01/01/2017 | | | 88 | 3.26% | Redeemed | Dec-16 | 0 | 94 | 70 | 2.59% | Issued | Nov-16 | 0 | 165 | 120 | 4.44% | Issued | Oct-16 | 0 | 339 | 244 | 9.04% | Issued | Sep-16 | 0 | 403 | 289 | 10.70% | Issued | Aug-16 | 0 | 616 | 440 | 16.30% | Issued | Jul-16 | 0 | 629 | 17 | 0.63% | Issued | Jun-16 | 0 | 572 | 408 | 15.11% | Issued | May-16 | 0 | 676 | 483 | 17.89% | Issued | Apr-16 | 0 | 570 | 406 | 15.04% | Issued | Mar-16 | 0 | 400 | 288 | 10.67% | Redeemed | Feb-16 | 0 | 267 | 193 | 7.15% | Redeemed | Jan-16 | 0 | 119 | 87 | 3.22% | Redeemed | Nov-15 | 0 | 98 | 72 | 2.67% | Redeemed | Oct-15 | 0 | 279 | 201 | 7.44% | Redeemed | Sep-15 | 0 | 529 | 378 | 14.00% | Redeemed | Aug-15 | 0 | 483 | 345 | 12.78% | Redeemed | Jul-15 | 440 | 617 | 440 | 16.30% | Redeemed | Jun-15 | 513 | 718 | 513 | 19.00% | Redeemed | May-15 | 440 | 617 | 440 | 16.30% | Redeemed | Apr-15 | 376 | 527 | 18 | 0.67% | Redeemed | Mar-15 | 58 | 82 | 58 | 2.15% | Redeemed |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|