Pingry Farm Solar Farm

Pingry Farm Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, coleford    
Type of installation: Solar    on/offshore: on
Solar Panels :30000  Capacity : 3.4 MW
Approx Date of 1st power generation: March 2014

/YES

 Comment

Councillors will be presented with proposals to convert an entire field in Milkwall into a green energy site on Tuesday.

It has been tabled by newly set-up company Coleford Energy Ltd, who estimate it will generate 6,400MWh electricty every year – enough to power more than 1,000 households.

The site is on Pingry Farm, adjacent to the GlaxoSmithKline factory. Hedgerows will largely obscure it from public view

 Address

Land At Pingry Farm Pingry Lane Milkwall Coleford Gloucestershire GL16 8QD

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Pingry Farm )

 DECC Data on this Project: Pingry Farm :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Pingry Farm - Phase 1     3.4 MW
Energy Type: Solar Photovoltaics
County: Gloucestershire     Country: England     LPA: Forest of Dean District Council
Site ID and Reference: 2012 / IF1029     District:
Applicant: Coleford Energy     Application : P1418/12/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land At Pingry Farm, Pingry Lane, Milkwall, Coleford
  GL16 8QD
County: Gloucestershire Region: South West
OS Coordinates: 357121 / 357121
Development Status: Operational
Application Submitted: 3/6/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/1/2014    
Generator Live 3/24/2014 This Record Last Updated: 5/28/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Pingry Farm - Phase 2     3.4 MW
Energy Type: Solar Photovoltaics
County: Gloucestershire     Country: England     LPA: Forest of Dean District Council
Site ID and Reference: 5230 /     District:
Applicant: Coleford Energy     Application : P1418/12/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land At Pingry Farm, Pingry Lane, Milkwall, Coleford
  GL16 8QD
County: Gloucestershire Region: South West
OS Coordinates: 357121 / 357121
Development Status: Operational
Application Submitted: 3/6/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/1/2015    
Generator Live 3/25/2015 This Record Last Updated: 5/28/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Pingry Farm: Solar :

Site Name: Milkwall Solar Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00473RUEN
Capacity: 2700 Status: Live
Accreditation Date: 3/6/2013    
Commission Date: 3/25/2015    
Applicant: Pingry Solar Ltd
Applicant Address: Green Nation, The Long Barn Manor Farm Stratton-on-the-Fosse Radstock BA3 4QF England
Address: Milkwall Solar Farm Pingry Lane Coleford GL16 8QD England

Site Name: Milkwall Solar Farm
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06078PVEN
Capacity: 2700 Status: Live
Accreditation Date: 3/6/2013    
Commission Date: 3/25/2015    
Applicant: Pingry Solar Ltd
Applicant Address: Green Nation, The Long Barn Manor Farm Stratton-on-the-Fosse Radstock BA3 4QF England
Address: Milkwall Solar Farm Pingry Lane Coleford GL16 8QD England
 
Assumptions: Capacity: 2700kW 2.7 MW,
Thus over the month Capacity * 720 hours per month = 1944 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 232 8.59% Issued
01/02/2018 215 7.96% Issued
01/01/2018 91 3.37% Issued
01/12/2017 64 2.37% Issued
01/11/2017 124 4.59% Issued
01/10/2017 193 7.15% Issued
01/09/2017 293 10.85% Issued
01/08/2017 400 14.81% Issued
01/07/2017 446 16.52% Issued
01/06/2017 438 16.22% Issued
01/05/2017 445 16.48% Issued
01/04/2017 428 15.85% Issued
01/03/2017 266 9.85% Redeemed
01/02/2017 112 4.15% Redeemed
01/01/2017 88 3.26% Redeemed
Dec-16 094 70 2.59% Issued
Nov-16 0165 120 4.44% Issued
Oct-16 0339 244 9.04% Issued
Sep-16 0403 289 10.70% Issued
Aug-16 0616 440 16.30% Issued
Jul-16 0629 17 0.63% Issued
Jun-16 0572 408 15.11% Issued
May-16 0676 483 17.89% Issued
Apr-16 0570 406 15.04% Issued
Mar-16 0400 288 10.67% Redeemed
Feb-16 0267 193 7.15% Redeemed
Jan-16 0119 87 3.22% Redeemed
Nov-15 098 72 2.67% Redeemed
Oct-15 0279 201 7.44% Redeemed
Sep-15 0529 378 14.00% Redeemed
Aug-15 0483 345 12.78% Redeemed
Jul-15 440617 440 16.30% Redeemed
Jun-15 513718 513 19.00% Redeemed
May-15 440617 440 16.30% Redeemed
Apr-15 376527 18 0.67% Redeemed
Mar-15 5882 58 2.15% Redeemed

Project Info
30,000-panel solar farm planned for Coleford
The site is on PINGRY FARM, adjacent to the GlaxoSmithKline factory. Hedgerows will largely obscure it from public view.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School