Sorry I found no matches, Please try again. 176
vid = 3512pws_id = 353071pws_id = 353071
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.116.118.214 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Newstead and Annesley Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Newstead and Annesley Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, NG15 0BT    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 1.5 MW
Approx Date of 1st power generation: January 2017

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

14/02261/NPA | Wind turbine with a maximum tip height of 100m, associated infrastructure to include control building and crane hardstanding.

 Turbine Make and Specs

Model: Vensys VE82 Start Speed: 3
Capacity: 1.5 Optimal Speed: 15
Rotor Diameter: 82 Stop Speed: 22
Hub Height 58   Avg for all turbines:58 Avg. Elevation: 0
Web Page: http://www.vensys.de/energy-wAssets/docs/pdf-dateien-fuer-download/VENSYS-1-5MW-english.pdf
Comment:

 Address

Newstead and Annesley Country Park, Tilford Road, Newstead NG15 0BT

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Newstead and Annesley )

 DECC Data on this Project: Newstead and Annesley :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Newstead and Annesley Wind Turbine     1.5 MW
Energy Type: Wind Onshore
County: Nottinghamshire     Country: England     LPA: Gedling Borough Council
Site ID and Reference: 4917 /     District:
Applicant: Redpath Energy     Application : 2014/1168 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.5
Height of Turbines: 126 Calculated capacity: 1.5
Site Address: Newstead and Annesley Country Park, Tilford Road, Newstead
  NG15 0BT
County: Nottinghamshire Region: East Midlands
OS Coordinates: 452500 / 452500
Development Status: Operational
Application Submitted: 10/4/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/1/2016    
Generator Live 12/1/2016 This Record Last Updated: 4/18/2017
RO Banding (ROC/MWh) 0.9 FiT Tariff (p/kWh): 7
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 10/20/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Newstead and Annesley: Wind :

 Calculations


Capacity: 3
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 22 m/s (49.214 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/15/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 3 start: 5 Optimum: 15/ Stop: 22 / wind: / ratio 353071

Project Info
Wind turbine plans at NEWSTEAD AND ANNESLEY Country Park given green light
A 100m tall wind turbine is to be erected in a Newstead country park - supplying electricity to its long-awaited visitor centre and enough power for 700 homes.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School