Sorry I found no matches, Please try again. 176
vid = 3514pws_id = 371537pws_id = 371537 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.15.10.104 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Dorenell Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Dorenell Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Dufftown    
Type of installation: Wind    on/offshore: on
Turbines :59  Capacity : 177 MW
Approx Date of 1st power generation: September 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Success in: Contracts for Difference (CFD) Allocation Round One Outcome (Feb/2015)

Map of turbines shows scheme with 64.

 Turbine Make and Specs

Model: Nordex N100 3MW Start Speed: 4
Capacity: 3 Optimal Speed: 15
Rotor Diameter: 101 Stop Speed: 25
Hub Height 100   Avg for all turbines:126 Avg. Elevation: 530
Web Page:
Comment:

 Address

Glenlivet Estate, Dufftown, Speyside, Moray

 Associated Companies.

Relationship Company (For: Dorenell )
DeveloperEDF Energy Renewables
OwnerEDF Energy Renewables
OperatorEDF Energy Renewables
DeveloperInfinergy

 DECC Data on this Project: Dorenell :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Dorenell Wind Farm (extension)     174.9 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 5051 /     District:
Applicant: EDF Energy Renewables     Application : EC00003111 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 53 Turbine Capacity: 3.2999999999999998
Height of Turbines: 150 Calculated capacity: 174.9
Site Address: Glenlivet Estate, Dufftown, Speyside, Moray
 
County: Grampian Region: Scotland
OS Coordinates: 332000 / 332000
Development Status: Abandoned
Application Submitted: 12/12/2014 Planning Permission Granted
Application Determined: Permission refused: 6/2/2016
Construction Date:    
Generator Live This Record Last Updated: 4/27/2018
RO Banding (ROC/MWh) 0.9 FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 9/22/2016
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 6/2/2016

Site Name: Dorenell Wind Farm (Previously Site A and B Scaut Hill)     177 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4244 / EN00299     District:
Applicant: EDF Energy Renewables/ Infinergy     Application : EC00003173 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 59 Turbine Capacity: 3
Height of Turbines: 126 Calculated capacity: 177
Site Address: Glenlivet Estate, Dufftown, Speyside, Moray
 
County: Grampian Region: Scotland
OS Coordinates: 332000 / 332000
Development Status: Operational
Application Submitted: 5/7/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/15/2016    
Generator Live 9/15/2018 This Record Last Updated: 7/23/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name:     MW
Energy Type:
County:     Country:     LPA:
Site ID and Reference: /     District:
Applicant:     Application : (Go to search to find Application)
Site Address:
 
County: Region:
OS Coordinates: /
Development Status:
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated:
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Dorenell: Wind :

 Calculations


Capacity: 360
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 360 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371537

Project Info
Glenfiddich owner loses DORENELL wind farm objection
William Grant and Sons objected to the DORENELL wind farm on the grounds it would spoil the local countryside and reduce visitor numbers.

Air crane helicopter for DORENELL wind farm in Moray
Scottish and Southern Electricity Networks (SSEN) and Balfour Beatty are using the helicopter to connect the DORENELL wind farm, near Dufftown, to a substation near Keith.

DORENELL Wind Farm Layout (Final Layout)

Infinergy: DORENELL Wind Farm

Renewables developers celebrate landmark contract awards
15 onshore wind farms, including the giant DORENELL Wind Farm, will provide nearly 750MW of capacity;

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School