Sorry I found no matches, Please try again. 176
vid = 3561pws_id = 350185pws_id = 350185 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.147.205.114 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Tom nan Clach Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Tom nan Clach Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, inverness    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 30 MW
Approx Date of 1st power generation: March 2019

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

16 turbines shown on map,

13 turbines planned for repowering.

 Turbine Make and Specs

Model: Enercon E92 Start Speed: 4
Capacity: 2.35 Optimal Speed: 13.5
Rotor Diameter: 92 Stop Speed: 31
Hub Height 85   Avg for all turbines:85 Avg. Elevation: 499
Web Page: http://www.enercon.de/en-en/1865.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

 Associated Companies.

Relationship Company (For: Tom nan Clach )
DeveloperInfinergy

 DECC Data on this Project: Tom nan Clach :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Tom Nan Clach     39 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 4420 / B1493     District:
Applicant: Infinergy     Application : 15/03286/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 13 Turbine Capacity: 3
Height of Turbines: 125 Calculated capacity: 39
Site Address: Approximately 8km North East Of Tomatin, Drynachan Nairnshire
 
County: Highland Region: Scotland
OS Coordinates: 286401 / 286401
Development Status: Operational
Application Submitted: 8/27/2015 Planning Permission Granted
Application Determined: Permission refused: 1/26/2016
Construction Date: 6/15/2016    
Generator Live 3/1/2019 This Record Last Updated: 9/17/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 3/15/2016
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 1/26/2016

Site Name: Tom Nan Clach Wind Farm     39.1 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 4267 / N00418W     District:
Applicant: Infinergy     Application : 09/00439/FULIN (Go to search to find Application)
For Wind Farms  
Number of Turbines: 13 Turbine Capacity: 3
Height of Turbines: 125 Calculated capacity: 39
Site Address: Approximately 8km North East Of Tomatin, Drynachan Nairnshire
 
County: Highland Region: Scotland
OS Coordinates: 286470 / 286470
Development Status: Revised
Application Submitted: 6/1/2009 Planning Permission Granted
Application Determined: Permission refused: 8/23/2010
Construction Date:    
Generator Live This Record Last Updated: 11/18/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 8/23/2010

 OFGEM Data on this Project: Tom nan Clach: Wind :

 Calculations


Capacity: 61.1
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/2/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 61.1 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 350185

Project Info
Welcome to TOM NAN CLACH Wind Farm
As part of this plan Infinergy investigated the hill of TOM NAN CLACH on Cawdor Estate, Nairnshire, as a possible wind energy site. The site is approximately 8km east of Tomatin and to the east of the A9 Inverness to Perth road

Infinergy renews TOM NAN CLACH
The company is planning to reduce turbine numbers at the Nairnshire site from 17 to 13, but boost energy output by around 25%.

Infinergy: TOM NAN CLACH Wind Farm

Infinergy TOM NAN CLACH, Final Layout for repowering

Government approves 'Wolf's castle' wind farm
The Scottish government has granted planning consent to the 17-turbine TOM NAN CLACH wind farm on Cawdor Estates land near Tomatin.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School