Sorry I found no matches, Please try again. 176
vid = 3584pws_id = 322234pws_id = 322234
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.147.47.177 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Loftsome Bridge Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Loftsome Bridge Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Loftsome Bridge Water treatment Works    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 2.6 MW
Approx Date of 1st power generation: February 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

We were given permission to install two 90m wind turbines to provide an average of a third of our energy needs for the site.

 Turbine Make and Specs

Model: Nordex N60/1300 Start Speed: 4.5
Capacity: 1.3 Optimal Speed: 10
Rotor Diameter: 60 Stop Speed: 25
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 4
Web Page: http://www.nordex-online.com/fileadmin/MEDIA/Produktinfos/EN/Nordex_N60_EN.pdf
Comment:

 Address

Loftsome Bridge Water treatment Works - A, D (24/0 Hull road Loftsome Bridge Newsholme Selby YO8 6EN

 Associated Companies.

Relationship Company (For: Loftsome Bridge )
DeveloperYorkshire Water Services
OperatorYorkshire Water Services
OwnerYorkshire Water Services

 DECC Data on this Project: Loftsome Bridge :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Loftsome Bridge     1.3 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: Selby District Council
Site ID and Reference: 2943 / EN00166     District:
Applicant: Yorkshire Water     Application : 06/05245/STPLF (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 1
Height of Turbines: Calculated capacity: 2
Site Address: Loftsome Bridge Water Treatment Works, Water Treatment Works Acc Rd, Barmby On The Marsh, East Riding Of Yorkshire, DN14 6ET
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 470140 / 470140
Development Status: Operational
Application Submitted: 6/28/2006 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 2/1/2008 This Record Last Updated: 8/23/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Loftsome Bridge: Wind : -na-

 Calculations


Capacity: 5.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 5.2 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 322234

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School