Taff Ely Wind Farm (Wind , Active) Location in the UK : Wales, Rhondda Cynon Taff Type of installation: Wind on/offshore: on Turbines :20 Capacity : 9 MW Approx Date of 1st power generation: August 1993
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Taff Ely is one of the first generation of wind farms to be constructed in the UK and has stood alongside the M4 motorway at Bridgend as a symbol of Wales’ ongoing commitment to renewable energy.
Built in 1993, and operated in Wales by RWE npower renewables since 1998, the wind farm consists of 20 wind turbines, typically generating an equivalent amount of electricity to meet the needs of over 4,250 homes every year.
Taff Ely Repowering: RWE npower renewables has submitted proposals to upgrade the existing wind turbines at Taff Ely, and so provide a more efficient, higher energy generating capacity wind farm.
Model: |
Nordtank NTK 450/37
|
Start Speed: |
4.5
|
Capacity: |
0.45
|
Optimal Speed: |
13
|
Rotor Diameter: |
37
|
Stop Speed: |
25
|
Hub Height |
35 Avg for all turbines:35
|
Avg. Elevation: |
260
|
Web Page: |
|
Comment: |
|
Taff Ely Wind Farm Gilfach Goch Bridgend Mid Glamorgan Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Headwind Taff Ely Wind Farm (Repowering) 17.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Mid Glamorgan Country: Wales LPA: Rhondda Cynon Taff County Borough Council
|
Site ID and Reference: |
4172 / AA385
District:
|
Applicant: |
RWE Npower Renewables
Application :
11/1468/10
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
17.5 |
Site Address: |
10 kilometres (km) north east of Bridgend
|
|
|
County: |
Mid Glamorgan Region: Wales
|
OS Coordinates: |
298257 / 298257
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
12/23/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
2/27/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
1/8/2020 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Taff Ely Wind Farm 9 MW
|
Energy Type: |
Wind Onshore |
County: |
Mid Glamorgan Country: Wales LPA: Bridgend County Borough Council
|
Site ID and Reference: |
2776 / AA384
District:
|
Applicant: |
Npower Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
20 |
Turbine Capacity: |
0.45000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
9 |
Site Address: |
10 kilometres (km) north east of Bridgend
|
|
|
County: |
Mid Glamorgan Region: Wales
|
OS Coordinates: |
298574 / 298574
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1993
|
This Record Last Updated: |
6/1/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 18 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|