Taff Ely Wind Farm (Wind , Active) Location in the UK : Wales, Rhondda Cynon Taff Type of installation: Wind on/offshore: on Turbines :20 Capacity : 9 MW Approx Date of 1st power generation: August 1993
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Taff Ely is one of the first generation of wind farms to be constructed in the UK and has stood alongside the M4 motorway at Bridgend as a symbol of Wales’ ongoing commitment to renewable energy.
Built in 1993, and operated in Wales by RWE npower renewables since 1998, the wind farm consists of 20 wind turbines, typically generating an equivalent amount of electricity to meet the needs of over 4,250 homes every year.
Taff Ely Repowering: RWE npower renewables has submitted proposals to upgrade the existing wind turbines at Taff Ely, and so provide a more efficient, higher energy generating capacity wind farm.
Model: |
Nordtank NTK 450/37
|
Start Speed: |
4.5
|
Capacity: |
0.45
|
Optimal Speed: |
13
|
Rotor Diameter: |
37
|
Stop Speed: |
25
|
Hub Height |
35 Avg for all turbines:35
|
Avg. Elevation: |
260
|
Web Page: |
|
Comment: |
|
Taff Ely Wind Farm Gilfach Goch Bridgend Mid Glamorgan Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Headwind Taff Ely Wind Farm (Repowering) 17.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Mid Glamorgan Country: Wales LPA: Rhondda Cynon Taff County Borough Council
|
Site ID and Reference: |
4172 / AA385
District:
|
Applicant: |
RWE Npower Renewables
Application :
11/1468/10
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
7 |
Turbine Capacity: |
2.5 |
Height of Turbines: |
|
Calculated capacity: |
17.5 |
Site Address: |
10 kilometres (km) north east of Bridgend
|
|
|
County: |
Mid Glamorgan Region: Wales
|
OS Coordinates: |
298257 / 298257
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
12/23/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
2/27/2020
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
1/8/2020 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Taff Ely Wind Farm 9 MW
|
Energy Type: |
Wind Onshore |
County: |
Mid Glamorgan Country: Wales LPA: Bridgend County Borough Council
|
Site ID and Reference: |
2776 / AA384
District:
|
Applicant: |
Npower Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
20 |
Turbine Capacity: |
0.45000000000000001 |
Height of Turbines: |
|
Calculated capacity: |
9 |
Site Address: |
10 kilometres (km) north east of Bridgend
|
|
|
County: |
Mid Glamorgan Region: Wales
|
OS Coordinates: |
298574 / 298574
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1993
|
This Record Last Updated: |
6/1/2011
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 18 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/10/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|