Taff Ely Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Taff Ely Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Rhondda Cynon Taff    
Type of installation: Wind    on/offshore: on
Turbines :20  Capacity : 9 MW
Approx Date of 1st power generation: August 1993

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Taff Ely is one of the first generation of wind farms to be constructed in the UK and has stood alongside the M4 motorway at Bridgend as a symbol of Wales’ ongoing commitment to renewable energy.

Built in 1993, and operated in Wales by RWE npower renewables since 1998, the wind farm consists of 20 wind turbines, typically generating an equivalent amount of electricity to meet the needs of over 4,250 homes every year.
Taff Ely Repowering: RWE npower renewables has submitted proposals to upgrade the existing wind turbines at Taff Ely, and so provide a more efficient, higher energy generating capacity wind farm.

 Turbine Make and Specs

Model: Nordtank NTK 450/37 Start Speed: 4.5
Capacity: 0.45 Optimal Speed: 13
Rotor Diameter: 37 Stop Speed: 25
Hub Height 35   Avg for all turbines:35 Avg. Elevation: 260
Web Page:
Comment:

 Address

Taff Ely Wind Farm Gilfach Goch Bridgend Mid Glamorgan Wales

 Associated Companies.

Relationship Company (For: Taff Ely )
OwnerRWE Innogy
OperatorRWE Innogy

 DECC Data on this Project: Taff Ely :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Headwind Taff Ely Wind Farm (Repowering)     17.5 MW
Energy Type: Wind Onshore
County: Mid Glamorgan     Country: Wales     LPA: Rhondda Cynon Taff County Borough Council
Site ID and Reference: 4172 / AA385     District:
Applicant: RWE Npower Renewables     Application : 11/1468/10 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 17.5
Site Address: 10 kilometres (km) north east of Bridgend
 
County: Mid Glamorgan Region: Wales
OS Coordinates: 298257 / 298257
Development Status: Planning Permission Expired
Application Submitted: 12/23/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 2/27/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 1/8/2020    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Taff Ely Wind Farm     9 MW
Energy Type: Wind Onshore
County: Mid Glamorgan     Country: Wales     LPA: Bridgend County Borough Council
Site ID and Reference: 2776 / AA384     District:
Applicant: Npower Renewables     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 20 Turbine Capacity: 0.45000000000000001
Height of Turbines: Calculated capacity: 9
Site Address: 10 kilometres (km) north east of Bridgend
 
County: Mid Glamorgan Region: Wales
OS Coordinates: 298574 / 298574
Development Status: Operational
Application Submitted: Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 10/1/1993 This Record Last Updated: 6/1/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Taff Ely: Wind : -na-

 Calculations


Capacity: 18
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 4/10/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 18 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 350592

Project Info
TAFF ELY Wind Farm - A Repowering Project

Npower

Taf Ely Wind Farm

TAFF ELY WIND FARM - Photos
the TAFF ELY wind farm has twenty massive turbines and covers a large area over two local farms Tynewydd and Maendy.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School