Sorry I found no matches, Please try again. 176
vid = 3598pws_id = 350246pws_id = 350246 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.37.211 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Royston Solar Farm

Royston Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, royston    
Type of installation: Solar    on/offshore: on
Solar Panels :56000  Capacity : 14 MW
Approx Date of 1st power generation: January 2016

/YES

 Comment

April 2015 - being installed

 Address

Royston Road, Melbourn, Cambridgeshire

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Royston )

 DECC Data on this Project: Royston :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Royston Solar Farm (Phase 1) (a)     5 MW
Energy Type: Solar Photovoltaics
County: Cambridgeshire     Country: England     LPA: South Cambridgeshire District Council
Site ID and Reference: 2202 / C3288     District:
Applicant: Canadian Solar     Application : S/1427/14/FL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land between Railway and Sewage Disposal Works, Royston Road, Melbourn, Cambridgeshire
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 535667 / 535667
Development Status: Operational
Application Submitted: 7/1/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/1/2015    
Generator Live 1/29/2016 This Record Last Updated: 3/4/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 10/29/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Royston Solar Farm (Phase 1)     5 MW
Energy Type: Solar Photovoltaics
County: Cambridgeshire     Country: England     LPA: South Cambridgeshire District Council
Site ID and Reference: 5988 /     District:
Applicant: Canadian Solar     Application : S/1427/14/FL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land between Railway and Sewage Disposal Works, Royston Road, Melbourn, Cambridgeshire
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 535667 / 535667
Development Status: Planning Permission Expired
Application Submitted: 7/1/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 11/23/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 10/29/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Royston Solar Farm (Phase 2)     4 MW
Energy Type: Solar Photovoltaics
County: Cambridgeshire     Country: England     LPA: South Cambridgeshire District Council
Site ID and Reference: 5989 /     District:
Applicant: Canadian Solar     Application : S/1427/14/FL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Land between Railway and Sewage Disposal Works, Royston Road, Melbourn, Cambridgeshire
 
County: Cambridgeshire Region: Eastern
OS Coordinates: 535667 / 535667
Development Status: Planning Permission Expired
Application Submitted: 7/1/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 11/23/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 10/29/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Royston: Solar :

Site Name: Royston Community Solar Project C.I.C.
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G07591PVEN
Capacity: 3750 Status: Live
Accreditation Date: 7/1/2014    
Commission Date: 6/28/2016    
Applicant: Royston Community Solar Project C.I.C.
Applicant Address: Pantymoch Farm Renewables Ltd 1 Lumley Street London W1K 6TT England
Address: Land between Railway and Sewage Disposal Works Royston Road Melbourn SG8 5UT England
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 3750kW 3.75 MW,
Thus over the month Capacity * 720 hours per month = 2700 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

Project Info
Amaized By Solar Panel Cleaning On ROYSTON Grain Store
Clean Solar Solutions have cleaned the solar panels on one of the biggest grain stores in the UK at ROYSTON, Hertfordshire. Hatchpen Farm is run by the Rand Brothers and they have invested in over 2,500 solar panels across their buildings.

Solar farm in Croydon would not be seen by villagers, says councillor
Renewable energy firm Push Energy is planning to build the farm, which could produce up to 12.8MWp of renewable electricity to provide enough energy to power more than 2,982 homes, at Church Farm in Croydon, near ROYSTON.

ROYSTON Solar Farm

Solar farm plan for Bassingbourn supported by ROYSTON Town Council
ROYSTON town council’s planning committee gave its blessing plans for a 71-acre solar farm near Highfield Farm, Bassingbourn, at its meeting last week.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School