Tangy Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Tangy Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Argyll & Bute    
Type of installation: Wind    on/offshore: on
Turbines :22  Capacity : 18.7 MW
Approx Date of 1st power generation: December 2002

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The proposal will see Tangy’s 22 existing turbines replaced with 15 modern machines; almost doubling the installed generating capacity of the wind farm. The upgrade allows SSE to reuse the existing site while delivering significantly more renewable energy but with seven fewer turbines than at present, made possible through advances in wind turbine design, technology and efficiency.

 Turbine Make and Specs

Model: Vestas V52-850 Start Speed: 2.5
Capacity: 0.85 Optimal Speed: 6.5
Rotor Diameter: 52 Stop Speed: 12
Hub Height 70   Avg for all turbines:70 Avg. Elevation: 169
Web Page: http://www.nrg-http://www.nrg-systems.hu/dok/V52_UK.pdf
Comment:

 Address

Tangy Wind Farm Kilkenzie By Campbeltown PA28 6QD Scotland

 Associated Companies.

Relationship Company (For: Tangy )
DeveloperScottish and Southern Energy
OperatorScottish and Southern Energy
OwnerScottish and Southern Energy

 DECC Data on this Project: Tangy :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Tangy 4 Wind Farm     80 MW
Energy Type: Wind Onshore
County: Argyll and Bute     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 6734 /     District:
Applicant: Scottish & Southern (SSE)     Application : ECU00000673 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 16 Turbine Capacity: 5
Height of Turbines: 150 Calculated capacity: 80
Site Address: Tangy, Kilkenzie, Campbeltown, Argyll And Bute
  PA28 6QD
County: Argyll and Bute Region: Scotland
OS Coordinates: 168500 / 168500
Development Status: Planning Permission Granted
Application Submitted: 9/6/2018 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 5/28/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 12/20/2024    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Tangy Wind Farm - repowering/Tangy 3     36.8 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 4277 / B0995     District:
Applicant: Scottish and Southern Energy (SSE)     Application : 14/02969/PP (Go to search to find Application)
For Wind Farms  
Number of Turbines: 16 Turbine Capacity: 3.3999999999999999
Height of Turbines: 125 Calculated capacity: 54.4
Site Address: Tangy, Kilkenzie, Campbeltown, Argyll And Bute
  PA28 6QD
County: Strathclyde Region: Scotland
OS Coordinates: 168500 / 168500
Development Status: Planning Permission Expired
Application Submitted: 12/11/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 10/3/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 6/29/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Tangy Farm Wind Turbine     2 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 3916 / C0704     District:
Applicant: Private Developer     Application : 12/02458/PP (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 2
Site Address: Tangy, Kilkenzie, Campbeltown, Argyll And Bute
  PA28 6QD
County: Strathclyde Region: Scotland
OS Coordinates: 168309 / 168309
Development Status: Planning Application Withdrawn
Application Submitted: 11/16/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 12/5/2014
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 3/24/2014    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Tangy Wind Farm Extension/Tangy 2     6 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 4024 / N00250W     District:
Applicant: Scottish and Southern Energy (SSE)     Application : 0401291/DET (Go to search to find Application)
For Wind Farms  
Number of Turbines: 7 Turbine Capacity: 0.84999999999999998
Height of Turbines: Calculated capacity: 5.95
Site Address: Kilkenzie , Campbelltown
 
County: Strathclyde Region: Scotland
OS Coordinates: 177000 / 177000
Development Status: Operational
Application Submitted: 7/1/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/1/2006    
Generator Live 6/17/2011 This Record Last Updated: 1/25/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Tangy Wind Farm/Tangy 1     12.8 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Argyll & Bute Council
Site ID and Reference: 3467 / N00047W     District:
Applicant: Border Wind / Scottish and Southern (SSE)     Application : 94/0739/DET (Go to search to find Application)
For Wind Farms  
Number of Turbines: 15 Turbine Capacity: 0.84999999999999998
Height of Turbines: Calculated capacity: 12.75
Site Address: Kilkenzie , Cambeltown
 
County: Strathclyde Region: Scotland
OS Coordinates: 168500 / 168500
Development Status: Operational
Application Submitted: 6/12/2001 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 12/26/2002 This Record Last Updated: 1/18/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Tangy: Wind :

Site Name: Tangy Wind Farm - A
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00023SQSC
Capacity: 18230 Status: Live
Accreditation Date: 6/12/2001    
Commission Date: 11/1/2002    
Applicant: SSE Generation Ltd
Applicant Address: Scottish Hydro Electric plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Scotland
Address: Tangy Wind Farm Kilkenzie By Campbeltown PA28 6QD Scotland

Site Name: Tangy Wind Farm - A
Generator Type: Wind
Scheme : REGO Generator ID: G00297NWSC
Capacity: 18230 Status: Live
Accreditation Date: 6/12/2001    
Commission Date: 11/1/2002    
Applicant: SSE Generation Ltd
Applicant Address: Scottish Hydro Electric plc Inveralmond House 200 Dunkeld Road Perth PH1 3AQ Scotland
Address: Tangy Wind Farm Kilkenzie By Campbeltown PA28 6QD Scotland
 
Assumptions: Capacity: 18230kW 18.23 MW,
Thus over the month Capacity * 720 hours per month = 13125.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 3869 21.22% Issued
01/02/2018 4054 22.24% Issued
01/01/2018 5674 31.12% Issued
01/12/2017 3491 19.15% Issued
01/11/2017 4087 22.42% Issued
01/10/2017 4734 25.97% Issued
01/09/2017 3396 18.63% Issued
01/08/2017 1826 10.02% Issued
01/07/2017 2031 11.14% Issued
01/06/2017 2182 11.97% Issued
01/05/2017 2515 13.80% Issued
01/04/2017 3624 19.88% Issued
01/03/2017 4038 22.15% Redeemed
01/02/2017 4877 26.75% Redeemed
01/01/2017 4225 23.18% Redeemed
Dec-16 03304 3324 18.23% Retired
Nov-16 02267 2288 12.55% Retired
Oct-16 03624 3624 19.88% Retired
Sep-16 03579 3579 19.63% Retired
Aug-16 02772 2789 15.30% Retired
Jul-16 01717 1730 9.49% Retired
Jun-16 01110 1133 6.22% Retired
Jun-16 01110 1133 6.22% Issued
May-16 02439 2457 13.48% Issued
Apr-16 03477 3477 19.07% Issued
Mar-16 02547 2564 14.06% Redeemed
Feb-16 04604 4603 25.25% Redeemed
Jan-16 05637 5637 30.92% Redeemed
Dec-15 06926 6926 37.99% Retired
Nov-15 05736 5736 31.46% Retired
Oct-15 03017 3017 16.55% Retired
Sep-15 03009 3009 16.51% Retired
Aug-15 02108 2126 11.66% Retired
Jul-15 23992385 2398 13.15% Redeemed
Jun-15 17681747 1769 9.70% Redeemed
May-15 41124112 4112 22.56% Redeemed
Apr-15 25432528 2543 13.95% Redeemed
Mar-15 49794979 4979 27.31% Redeemed
Feb-15 37983799 3798 20.83% Redeemed
Jan-15 54435443 5443 29.86% Redeemed
Dec-14 55325532 5532 30.35% Redeemed
Nov-14 38733872 3872 21.24% Redeemed
Oct-14 46804680 4680 25.67% Redeemed
Sep-14 11771156 1177 6.46% Redeemed
Aug-14 36013602 3602 19.76% Redeemed
Jul-14 13991380 1399 7.67% Redeemed
Jun-14 12921272 1292 7.09% Redeemed
May-14 19241910 1925 10.56% Redeemed
Apr-14 37933793 3793 20.81% Redeemed
Mar-14 53395339 5339 29.29% Redeemed
Feb-14 64186418 6418 35.21% Redeemed
Jan-14 52165216 1 0.01% Redeemed
Dec-13 75287528 7529 41.30% Redeemed
Nov-13 52555255 5255 28.83% Redeemed
Oct-13 51915191 1 0.01% Redeemed
Sep-13 34043404 3404 18.67% Redeemed
Aug-13 20272011 2027 11.12% Redeemed
Jul-13 957931 957 5.25% Redeemed
Jun-13 17511730 1751 9.61% Redeemed
May-13 37493749 3749 20.57% Redeemed
Apr-13 43584358 4358 23.91% Redeemed
Mar-13 36033602 3603 19.76% Redeemed
Feb-13 40354035 4035 22.13% Redeemed
Jan-13 60486049 6048 33.18% Redeemed
Dec-12 59385938 5938 32.57% Redeemed
Nov-12 42824281 4281 23.48% Redeemed
Oct-12 28362836 2836 15.56% Redeemed
Sep-12 44044404 4404 24.16% Redeemed
Aug-12 29582958 2959 16.23% Redeemed
Jul-12 18741856 1874 10.28% Redeemed
Jun-12 26352620 2635 14.45% Redeemed
May-12 27072691 2707 14.85% Redeemed
Apr-12 25062505 2506 13.75% Redeemed
Mar-12 34493450 3449 18.92% Redeemed
Feb-12 47424743 4742 26.01% Redeemed
Jan-12 61316131 6131 33.63% Redeemed
Dec-11 66246624 6624 36.34% Redeemed
Nov-11 58245823 5823 31.94% Redeemed
Oct-11 49964996 4996 27.41% Redeemed
Sep-11 47324733 4733 25.96% Redeemed
Aug-11 19671953 1967 10.79% Retired
Jul-11 20302014 2030 11.14% Retired
Jun-11 15811563 1581 8.67% Retired
May-11 47774778 4777 26.20% Retired
Apr-11 25512551 2551 13.99% Retired
Mar-11 22312214 2232 12.24% Redeemed
Feb-11 37823782 3782 20.75% Redeemed
Jan-11 23912391 2391 13.12% Redeemed
Dec-10 23632362 2362 12.96% Expired
Nov-10 40294030 4029 22.10% Expired
Oct-10 42494249 4250 23.31% Expired
Sep-10 36913690 3691 20.25% Expired

 Calculations


Capacity: 37.4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 37.4 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 310184

Project Info
TANGY Repower
In August 2018, SSE submitted a Section 36 Application to Scottish Ministers seeking consent to replace the existing 22 operational turbines for 16 modern, more efficient machines.

Wind Prospect

SSE: TANGY wind farm

TANGY III includes map of new layout

Cumulative Impact of Wind Farms In The Outer Clyde Estuary
It concludes, that if all the wind farms in or approaching the planning system at present are approved, the level of cumulative impact will degrade the environment of this unique area to a totally unacceptable extent. TANGY, Beinn an Tuirc, Deucheran

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School