Tappaghan Wind Farm (Wind , Active) Location in the UK : N.Ireland, Co Fermanagh Type of installation: Wind on/offshore: on Turbines :19 Capacity : 28.5 MW Approx Date of 1st power generation: March 2005
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Initial installation of 13 turbines in 2005. The wind farm produced 19.5MW of electricity, enough to power the equivalent of approximately 12,000 houses.
As part of the development Airtricity has created the Tappaghan Community Fund. The local community will benefit directly from this new wind farm as Ł13,000 from the Fund will be invested in local community schemes in the area each year, Ł260,000 over the lifetime of the project..
Extension July 2009 Adds 6 more GE1.5 turbines producing 9 MW
All the foundations for the turbines have been constructed and six out of the 13 turbines have been erected. The development involves the erection of 1.5 MW turbines on Fermanagh's border with County Tyrone, made up of the townlands of Glenarn, Stranahone and Stranadamff. The wind farm is to be commissioned in February (2009) next year. The wind farm will produce 19.5MW of electricity, enough to power the equivalent of almost 12,000 houses. This represents 57 per cent of the domestic electricity needs of the population of Fermanagh District Council.
The local community will benefit directly from this new wind farm as ÂŁ1,000 per turbine, ÂŁ13,000 in total, will be invested in local community schemes in the area each year. This will begin one year after commissioning has taken place.
Model: |
GE 1.5 - 77
|
Start Speed: |
4
|
Capacity: |
1.5
|
Optimal Speed: |
15
|
Rotor Diameter: |
77
|
Stop Speed: |
25
|
Hub Height |
70 Avg for all turbines:70
|
Avg. Elevation: |
261
|
Web Page: |
http://tinyurl.com/mj649ee |
Comment: |
GEs Class I 1.5-77 wind turbine. GE advanced its original Class I wind turbine, the 1.5-70.5, with increased rotor length, and controls technology resulting in a greater annual energy production.
|
Tappaghan Windfarm Ltd - A Castlederg Road Lack Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Tappaghan Extension 9 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
4688 / EN00194
District:
|
Applicant: |
Greencoat UK Wind
Application :
L/2006/1553/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
|
Calculated capacity: |
9 |
Site Address: |
Lack, Tappaghan Mountains, Northern Ireland
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
31856 / 31856
|
Development Status: |
Operational
|
Application Submitted: |
6/12/2005
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
7/1/2009
|
This Record Last Updated: |
1/5/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tappaghan 19.5 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Fermanagh Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3130 / N00081W
District:
|
Applicant: |
Greencoat UK Wind
Application :
L/2002/1042/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
13 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
|
Calculated capacity: |
19.5 |
Site Address: |
Lack, Tappaghan Mountains, Northern Ireland
|
|
|
County: |
Co. Fermanagh Region: Northern Ireland
|
OS Coordinates: |
31856 / 31856
|
Development Status: |
Operational
|
Application Submitted: |
8/1/2002
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
2/1/2005
|
This Record Last Updated: |
1/5/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Tappaghan Windfarm Ltd
|
Generator Type: |
On-shore wind (NIRO code = NQ)
|
Scheme : |
RO
|
Generator ID: |
R00004NQNI
|
Capacity: |
28500
|
Status: |
Live
|
Accreditation Date: |
8/1/2002
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Tappaghan Windfarm (NI) Limited
|
Applicant Address: |
2nd Floor
83 - 85 Great Victoria St
Belfast
BT2 7AF
Northern Ireland
|
Address: |
Tappaghan Windfarm Ltd - A
Castlederg Road
Lack
Northern Ireland
|
Site Name: |
Tappaghan Windfarm Ltd
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G00027NWNI
|
Capacity: |
28500
|
Status: |
Live
|
Accreditation Date: |
8/1/2002
|
|
|
Commission Date: |
12/1/2004
|
|
|
Applicant: |
Tappaghan Windfarm (NI) Limited
|
Applicant Address: |
2nd Floor
83 - 85 Great Victoria St
Belfast
BT2 7AF
Northern Ireland
|
Address: |
Tappaghan Windfarm Ltd - A
Castlederg Road
Lack
Northern Ireland
|
|
Assumptions: Capacity: 28500kW 28.5 MW, Thus over the month Capacity * 720 hours per month = 20520 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 6735 | 23.63% | Issued | 01/02/2018 | | | 6480 | 22.74% | Issued | 01/01/2018 | | | 8888 | 31.19% | Issued | 01/12/2017 | | | 5861 | 20.56% | Retired | 01/11/2017 | | | 4836 | 16.97% | Retired | 01/10/2017 | | | 7036 | 24.69% | Retired | 01/09/2017 | | | 5599 | 19.65% | Retired | 01/08/2017 | | | 4057 | 14.24% | Retired | 01/07/2017 | | | 3805 | 13.35% | Retired | 01/06/2017 | | | 5275 | 18.51% | Retired | 01/05/2017 | | | 4321 | 15.16% | Issued | 01/04/2017 | | | 4905 | 17.21% | Issued | 01/03/2017 | | | 6696 | 23.49% | Issued | 01/02/2017 | | | 8024 | 28.15% | Issued | 01/01/2017 | | | 7181 | 25.20% | Issued | Dec-16 | | 8303 | 8302 | 29.13% | Retired | Nov-16 | | 4576 | 4576 | 16.06% | Retired | Oct-16 | | 5512 | 5512 | 19.34% | Retired | Sep-16 | | 5336 | 5336 | 18.72% | Retired | Aug-16 | | 5267 | 5267 | 18.48% | Retired | Jul-16 | | 3588 | 3588 | 12.59% | Retired | Jun-16 | | 3205 | 3205 | 11.25% | Retired | Jun-16 | | 3205 | 3205 | 11.25% | Issued | May-16 | | 5308 | 5308 | 18.62% | Issued | Apr-16 | | 5922 | 5922 | 20.78% | Issued | Mar-16 | | 5599 | 5600 | 19.65% | Issued | Feb-16 | | 7321 | 7321 | 25.69% | Issued | Jan-16 | | 8512 | 8512 | 29.87% | Issued | Dec-15 | | 11052 | 11052 | 38.78% | Retired | Nov-15 | | 8133 | 281 | 0.99% | Retired | Oct-15 | | 4624 | 4624 | 16.22% | Retired | Sep-15 | | 4072 | 4072 | 14.29% | Retired | Aug-15 | | 4199 | 4199 | 14.73% | Retired | Jul-15 | 4597 | 4598 | 4598 | 16.13% | Retired | Jun-15 | 5314 | 5314 | 5314 | 18.65% | Retired | May-15 | 7220 | 7220 | 7220 | 25.33% | Retired | Apr-15 | 3888 | 3888 | 3888 | 13.64% | Retired | Mar-15 | 7940 | 7939 | 7940 | 27.86% | Retired | Feb-15 | 6021 | 6020 | 6021 | 21.13% | Retired | Jan-15 | 10090 | 10090 | 10090 | 35.40% | Retired | Dec-14 | 7531 | 7531 | 7531 | 26.42% | Retired | Nov-14 | 4835 | 4835 | 4835 | 16.96% | Retired | Oct-14 | 7605 | 7605 | 7605 | 26.68% | Retired | Sep-14 | 2155 | 2140 | 2154 | 7.56% | Retired | Aug-14 | 5539 | 5539 | 5540 | 19.44% | Retired | Jul-14 | 3249 | 3249 | 3248 | 11.40% | Retired | Jun-14 | 2547 | 2547 | 2547 | 8.94% | Retired | May-14 | 4497 | 4497 | 4497 | 15.78% | Retired | Apr-14 | 5559 | 5558 | 5559 | 19.51% | Retired | Mar-14 | 7532 | 7532 | 7532 | 26.43% | Retired | Feb-14 | 8582 | 8582 | 8582 | 30.11% | Retired | Jan-14 | 7488 | 7488 | 7488 | 26.27% | Retired | Dec-13 | 11677 | 11678 | 11677 | 40.97% | Retired | Nov-13 | 4218 | 4218 | 4218 | 14.80% | Retired | Oct-13 | 6662 | 6662 | 1 | 0.00% | Retired | Sep-13 | 5506 | 5506 | 1 | 0.00% | Retired | Aug-13 | 4353 | 4353 | 4353 | 15.27% | Retired | Jul-13 | 2308 | 2287 | 2308 | 8.10% | Retired | Jun-13 | 3634 | 3633 | 3634 | 12.75% | Retired | May-13 | 6264 | 6264 | 6264 | 21.98% | Retired | Apr-13 | 7360 | 7360 | 7361 | 25.83% | Retired | Mar-13 | 8461 | 8461 | 8460 | 29.68% | Retired | Feb-13 | 6439 | 6439 | 6439 | 22.59% | Retired | Jan-13 | 7652 | 7651 | 7651 | 26.85% | Retired | Dec-12 | 7661 | 7662 | 7662 | 26.88% | Retired | Nov-12 | 6598 | 6598 | 6598 | 23.15% | Retired | Oct-12 | 4161 | 4161 | 4160 | 14.60% | Retired | Sep-12 | 6328 | 6328 | 6328 | 22.20% | Retired | Aug-12 | 4698 | 4699 | 4698 | 16.48% | Retired | Jul-12 | 3645 | 3645 | 3645 | 12.79% | Retired | Jun-12 | 4124 | 4123 | 4124 | 14.47% | Retired | May-12 | 4453 | 4453 | 4453 | 15.62% | Retired | Apr-12 | 5229 | 5229 | 5229 | 18.35% | Retired | Mar-12 | 1517 | 5880 | 5880 | 20.63% | Retired | Feb-12 | 6661 | 6660 | 6660 | 23.37% | Retired | Jan-12 | 9444 | 9444 | 9444 | 33.14% | Retired | Dec-11 | 8785 | 8784 | 8784 | 30.82% | Retired | Nov-11 | 9261 | 9262 | 9261 | 32.49% | Retired | Oct-11 | 7884 | 7884 | 7884 | 27.66% | Retired | Sep-11 | 8665 | 8665 | 8665 | 30.40% | Retired | Aug-11 | 2619 | 2566 | 2586 | 9.07% | Retired | Jul-11 | 2812 | 2793 | 2812 | 9.87% | Retired | Jun-11 | 3023 | 2974 | 2994 | 10.51% | Retired | May-11 | 10334 | 10202 | 10334 | 36.26% | Retired | Apr-11 | 5010 | 5205 | 5010 | 17.58% | Retired | Mar-11 | 4142 | 4119 | 4069 | 14.28% | Retired | Feb-11 | 6810 | 6811 | 6690 | 23.47% | Retired | Jan-11 | 5179 | 5179 | 92 | 0.32% | Revoked | Dec-10 | 4362 | 4363 | 4285 | 15.04% | Expired | Nov-10 | 6680 | 6475 | 6361 | 22.32% | Expired | Oct-10 | 6680 | 6681 | 6680 | 23.44% | Expired |
|
Capacity: 57 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|