Sorry I found no matches, Please try again. 176
vid = 3626pws_id = 352957pws_id = 352957 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.128.198.90 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Bedborough Solar Farm

Bedborough Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, BH21 7BQ    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 5 MW
Approx Date of 1st power generation: February 2016

/YES

 Comment


 Address

Bedborough Solar Farm Uddens Drive Wimborne Poole BH21 7BQ England

 Associated Companies.

Relationship Company (For: Bedborough )
DeveloperPrimrose Solar
DeveloperSolstice Renewables

 DECC Data on this Project: Bedborough :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Bedborough Farm     7 MW
Energy Type: Solar Photovoltaics
County: Dorset     Country: England     LPA: East Dorset District Council
Site ID and Reference: 2114 / B1430     District:
Applicant: Solstice Renewables Ltd     Application : 3/14/0790/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Bedborough Farm, Land At Uddens Drive Wimborne Dorset
  BH21 7BQ
County: Dorset Region: South West
OS Coordinates: 405429 / 405429
Development Status: Operational
Application Submitted: 8/14/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/15/2015    
Generator Live 2/26/2016 This Record Last Updated: 3/4/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 11/3/2017    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Bedborough: Solar :

Site Name: Bedborough Solar Farm
Generator Type: Photovoltaic (RO code = RU)
Scheme : RO Generator ID: R00622RUEN
Capacity: 4069.5 Status: Live
Accreditation Date: 8/14/2014    
Commission Date: 10/16/2015    
Applicant: Primrose Solar (12) Limited
Applicant Address: 3rd floor Connaught House 1-3 Mount Street London W1K 3NB England
Address: Bedborough Solar Farm Uddens Drive Wimborne Poole BH21 7BQ England

Site Name: Bedborough Solar Farm
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06718PVEN
Capacity: 4069.5 Status: Live
Accreditation Date: 8/14/2014    
Commission Date: 10/16/2015    
Applicant: Primrose Solar (12) Limited
Applicant Address: 3rd floor Connaught House 1-3 Mount Street London W1K 3NB England
Address: Bedborough Solar Farm Uddens Drive Wimborne Poole BH21 7BQ England
 
Assumptions: Capacity: 4069.5kW 4.0695 MW,
Thus over the month Capacity * 720 hours per month = 2930.04 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 459 11.28% Issued
01/03/2018 309 7.59% Issued
01/02/2018 330 8.11% Issued
01/01/2018 142 3.49% Issued
01/12/2017 112 2.75% Issued
01/11/2017 206 5.06% Issued
01/10/2017 282 6.93% Issued
01/09/2017 406 9.98% Issued
01/08/2017 578 14.20% Issued
01/07/2017 648 15.92% Issued
01/06/2017 673 16.54% Issued
01/05/2017 457 11.23% Issued
01/04/2017 640 15.73% Issued
01/03/2017 400 9.83% Redeemed
01/02/2017 196 4.82% Redeemed
01/01/2017 149 3.66% Redeemed
Dec-16 0138 111 2.73% Issued
Nov-16 0260 205 5.04% Issued
Oct-16 0470 365 8.97% Issued
Sep-16 0506 392 9.63% Issued
Aug-16 0827 636 15.63% Issued
Jul-16 0855 658 16.17% Issued
Jul-16 0855 658 16.17% Issued
Jun-16 0711 547 13.44% Issued
Jun-16 0711 547 13.44% Issued
May-16 0909 700 17.20% Issued
Apr-16 0754 583 14.33% Pending Tr
Mar-16 0449 349 8.58% Redeemed
Feb-16 0338 265 6.51% Redeemed
Jan-16 0180 144 3.54% Redeemed
Dec-15 098 80 1.97% Redeemed
Nov-15 0135 107 2.63% Redeemed
Oct-15 0108 85 2.09% Redeemed

Project Info
Primrose adds 5MW BEDBOROUGH Solar Farm to portfolio
UK solar farm operator Primrose Solar has added the 5MWp BEDBOROUGH Solar Farm to its portfolio after acquiring it from developer Solstice Renewables.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School