Loading
Page views this IP this session = 1 of 10 unsubscribed pagesSouth Kyle Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
South Kyle Wind Farm (Wind , Agreed/Planning) Location in the UK : Scotland, Dalmellington Type of installation: Wind on/offshore: on Turbines :50 Capacity : 240 MW Approx Date of 1st power generation: 2023
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
n August 2013, Vattenfall submitted a planning application to the Scottish Government for the 50 turbine South Kyle wind farm. The consenting process is ongoing. In line with UK government guidance to ensure the safety of employees in light of the COVID-19 pandemic, construction for the wind farm will begin once it is appropriate to do so. Vattenfall will construct the wind farm and will manage the asset on behalf of Greencoat for a minimum of 10 years. It will also purchase the power for a period of 15 years.
Model: |
Nordex N133
|
Start Speed: |
3
|
Capacity: |
4.8
|
Optimal Speed: |
0
|
Rotor Diameter: |
133
|
Stop Speed: |
28
|
Hub Height |
80 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
https://www.nordex-online.com/en/product/n133-4-8/ |
Comment: |
|
south of the B741, mainly within Kyle Forest and to the east of Dalmellington
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
South Kyle Wind Farm 240 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4586 / B0393
District:
|
Applicant: |
Vattenfall
Application :
EC00003109
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
50 |
Turbine Capacity: |
4.7999999999999998 |
Height of Turbines: |
150 |
Calculated capacity: |
240 |
Site Address: |
south of the B741, mainly within Kyle Forest and to the east of Dalmellington
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
254576 / 254576
|
Development Status: |
Under Construction
|
Application Submitted: |
8/29/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/1/2020
|
|
|
Generator Live |
|
This Record Last Updated: |
10/29/2021
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
6/30/2022 |
|
|
Secretary of State - |
Appeal Lodged: |
2/5/2015 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Kyle Windfarm 255 MW
|
Energy Type: |
Wind Onshore |
County: |
Strathclyde Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3235 / N00299W
District:
|
Applicant: |
AMEC
Application :
IEC3/73
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
85 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
255 |
Site Address: |
Kyle forest, B714 road between New Cumnock and Dalmellington
|
|
|
County: |
Strathclyde Region: Scotland
|
OS Coordinates: |
249500 / 249500
|
Development Status: |
Planning Permission Refused
|
Application Submitted: |
10/29/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
10/24/2008
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
6/9/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
10/24/2008 |
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|