Tir Mostyn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Tir Mostyn Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Denbighshire    
Type of installation: Wind    on/offshore: on
Turbines :25  Capacity : 21.25 MW
Approx Date of 1st power generation: September 2005

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The wind farm
is located 8km South-West of the town of Denbigh in North Wales. On average, during
the wind farm’s anticipated 25-year lifespan, the twenty five 850kW wind turbines will together generate as much electricity as is used by approximately 15,500 homes. Tir Mostyn will make a significant contribution to Welsh targets for renewable energy production, whilst also helping achieve the national need for diverse and clean energy supplies.

the site managed and operated by Gamesa Eolica, based in Newport, South Wales.

 Turbine Make and Specs

Model: Gamesa G52 Start Speed: 4
Capacity: 0.85 Optimal Speed: 13
Rotor Diameter: 52 Stop Speed: 24
Hub Height 49   Avg for all turbines:49 Avg. Elevation: 463
Web Page: http://www.gamesacorp.com/en/products-and-services/wind-turbines/gamesa-g52-850-kw-en.html
Comment:

 Address

 Associated Companies.

Relationship Company (For: Tir Mostyn )
OwnerMunich Re
DeveloperWind Direct
DeveloperWind Prospect

 DECC Data on this Project: Tir Mostyn :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Tir Mostyn And Foel Goch Wind Farm     21.3 MW
Energy Type: Wind Onshore
County: Clwyd     Country: Wales     LPA: Denbighshire County Council
Site ID and Reference: 4689 / 04069W4     District:
Applicant: Munich Re (previously Windjen Power Ltd)     Application : 25/710/99/PF (Go to search to find Application)
For Wind Farms  
Number of Turbines: 25 Turbine Capacity: 0.84999999999999998
Height of Turbines: Calculated capacity: 21.25
Site Address: Nantglyn, Denbighshire
 
County: Clwyd Region: Wales
OS Coordinates: 300300 / 300300
Development Status: Operational
Application Submitted: 9/22/1999 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 6/1/2005 This Record Last Updated: 8/16/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Tir Mostyn: Wind :

Site Name: TIR MOSTYN AND FOEL GOCH
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00153RQWA
Capacity: 21250 Status: Live
Accreditation Date: 9/22/1999    
Commission Date: 6/1/2005    
Applicant: Tir Mostyn & Foel Goch Limited
Applicant Address: Plantation Place 30 Fenchurch Street LONDON EC3M 3AJ England
Address: Tir Mostyn & Foel Goch Tir Mostyn & Foel Goch Wind Farm Nantglyn Denbigh LL16 5RN Wales

Site Name: TIR MOSTYN AND FOEL GOCH
Generator Type: Wind
Scheme : REGO Generator ID: G00560NWWA
Capacity: 21250 Status: Live
Accreditation Date: 9/22/1999    
Commission Date: 6/1/2005    
Applicant: Tir Mostyn & Foel Goch Limited
Applicant Address: Plantation Place 30 Fenchurch Street LONDON EC3M 3AJ England
Address: Tir Mostyn & Foel Goch Tir Mostyn & Foel Goch Wind Farm Nantglyn Denbigh LL16 5RN Wales
 
Assumptions: Capacity: 21250kW 21.25 MW,
Thus over the month Capacity * 720 hours per month = 15300 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 3003 14.13% Issued
01/03/2018 3669 17.27% Issued
01/02/2018 4651 21.89% Issued
01/01/2018 7228 34.01% Issued
01/12/2017 6506 30.62% Retired
01/11/2017 5239 24.65% Retired
01/10/2017 6407 30.15% Retired
01/09/2017 3933 18.51% Retired
01/08/2017 3671 17.28% Issued
01/07/2017 3141 14.78% Issued
01/06/2017 4510 21.22% Retired
01/05/2017 3126 14.71% Issued
01/04/2017 3383 15.92% Issued
01/03/2017 5404 25.43% Issued
01/02/2017 5302 24.95% Issued
01/01/2017 4206 19.79% Issued
Dec-16 04340 4340 20.42% Pending Tr
Nov-16 03133 3133 14.74% Pending Tr
Oct-16 02290 2307 10.86% Pending Tr
Sep-16 03684 3684 17.34% Pending Tr
Aug-16 03381 3381 15.91% Pending Tr
Jul-16 03097 3097 14.57% Pending Tr
Jul-16 03097 3097 14.57% Pending Tr
Jun-16 01375 1398 6.58% Pending Tr
May-16 02223 2235 10.52% Pending Tr
Apr-16 02297 2316 10.90% Pending Tr
Mar-16 02300 2324 10.94% Redeemed
Feb-16 03599 3599 16.94% Redeemed
Jan-16 03558 3558 16.74% Redeemed
Dec-15 04690 4690 22.07% Redeemed
Nov-15 04972 4972 23.40% Redeemed
Oct-15 02531 2556 12.03% Redeemed
Sep-15 02409 2409 11.34% Redeemed
Aug-15 03529 3529 16.61% Redeemed
Jul-15 40724073 4073 19.17% Redeemed
Jun-15 31023102 3102 14.60% Redeemed
May-15 50705069 5069 23.85% Redeemed
Apr-15 34403440 3440 16.19% Redeemed
Mar-15 50345033 4974 23.41% Redeemed
Feb-15 30663066 3066 14.43% Redeemed
Jan-15 45824583 4583 21.57% Redeemed
Dec-14 71987198 7198 33.87% Redeemed
Nov-14 35713571 3326 15.65% Redeemed
Oct-14 61816181 6181 29.09% Redeemed
Sep-14 11271104 1127 5.30% Redeemed
Aug-14 45424542 4542 21.37% Redeemed
Jul-14 22712254 2271 10.69% Redeemed
Jun-14 11841160 1184 5.57% Redeemed
May-14 29522937 2953 13.90% Redeemed
Apr-14 29282928 2928 13.78% Redeemed
Mar-14 54825481 5481 25.79% Expired
Feb-14 70947094 7094 33.38% Redeemed
Jan-14 63496349 6349 29.88% Redeemed
Dec-13 73027302 7302 34.36% Expired
Nov-13 34523452 3452 16.24% Redeemed
Oct-13 51175117 5117 24.08% Redeemed
Sep-13 34383438 3438 16.18% Redeemed
Aug-13 31163115 3115 14.66% Redeemed
Jul-13 14971468 1497 7.04% Redeemed
Jun-13 31113111 3111 14.64% Redeemed
May-13 52525252 5252 24.72% Redeemed
Apr-13 47824782 4782 22.50% Redeemed
Mar-13 30803080 3080 14.49% Expired
Feb-13 36933693 3693 17.38% Expired
Jan-13 56525652 5652 26.60% Redeemed
Dec-12 58445845 5845 27.51% Redeemed
Nov-12 44754475 4475 21.06% Redeemed
Oct-12 34893490 3490 16.42% Redeemed
Sep-12 49984998 4998 23.52% Redeemed
Aug-12 32573257 3257 15.33% Redeemed
Jul-12 26852666 2685 12.64% Redeemed
Jun-12 38273826 3826 18.00% Redeemed
May-12 26892671 2689 12.65% Redeemed
Apr-12 30233023 3023 14.23% Redeemed
Mar-12 37743774 3774 17.76% Redeemed
Feb-12 51165116 5116 24.08% Redeemed
Jan-12 73787378 7378 34.72% Redeemed
Dec-11 94289427 9427 44.36% Redeemed
Nov-11 54615461 5461 25.70% Redeemed
Oct-11 74127412 7412 34.88% Redeemed
Sep-11 58015802 5802 27.30% Redeemed
Aug-11 30563056 3056 14.38% Redeemed
Jul-11 20001986 2001 9.42% Redeemed
Jun-11 31583158 3158 14.86% Redeemed
May-11 66926692 6692 31.49% Redeemed
Apr-11 31063115 3115 14.66% Redeemed
Mar-11 27372714 2737 12.88% Expired
Feb-11 41904190 4190 19.72% Expired
Jan-11 39743974 3974 18.70% Redeemed
Dec-10 21062092 2106 9.91% Redeemed
Nov-10 26202620 2620 12.33% Redeemed
Oct-10 39683968 3968 18.67% Redeemed

 Calculations


Capacity: 42.5
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 24 m/s (53.688 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/22/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 42.5 start: 5 Optimum: 15/ Stop: 24 / wind: / ratio 350703

Project Info
Wind Direct: TIR MOSTYN & Foel Goch

Wind prospect

CASE STUDY TIR MOSTYN Wind Farm

HgCapital sells operating UK Wind portfolio to Munich Re
The portfolio includes the 21.25MW TIR MOSTYN wind farm in North Wales, the 16MW Bagmoor wind farm in Lincolnshire and the 65MW Scout Moor wind farm near Manchester.

Windfarm owner claims rival operation would ‘steal our wind’
And it has now emerged one of the more bizarre objections to the Brenig proposal came from the managers of the 25-turbine windfarm TIR MOSTYN, immediately to the north and east of the proposal.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School