Trysglwyn Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Trysglwyn Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, Gwynedd    
Type of installation: Wind    on/offshore: on
Turbines :14  Capacity : 5.6 MW
Approx Date of 1st power generation: July 1996

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

The Trysglwyn Wind Farm cost approximately £6 million to build of which about a third was spent with regional companies for construction and electrical work

 Turbine Make and Specs

Model: Bonus B37/450 Start Speed: 4
Capacity: 0.45 Optimal Speed: 10
Rotor Diameter: 37 Stop Speed: 23
Hub Height 25   Avg for all turbines:25 Avg. Elevation: 82
Web Page: http://www.thewindpower.net/turbine_en_353_bonus_b37-450.php
Comment: Start / Optimum and stop powers are estimated

 Address

 Associated Companies.

Relationship Company (For: Trysglwyn )
DeveloperRWE Innogy
OperatorRWE Innogy
OwnerRWE Innogy

 DECC Data on this Project: Trysglwyn :-na-

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Trysglwyn Wind Farm     5.6 MW
Energy Type: Wind Onshore
County: Gwynedd     Country: Wales     LPA: Isle of Anglesey County Council
Site ID and Reference: 2567 / 04054W3     District:
Applicant: RWE npower     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 14 Turbine Capacity: 0.40000000000000002
Height of Turbines: Calculated capacity: 5.6
Site Address: Trysglwyn Fawr Rhosybol Isle of Anglesey Gwynedd
 
County: Gwynedd Region: Wales
OS Coordinates: 244000 / 244000
Development Status: Operational
Application Submitted: 8/8/1992 Planning Permission Granted
Application Determined: Permission refused: 12/10/1993
Construction Date:    
Generator Live 5/1/1996 This Record Last Updated: 12/9/2003
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted: 12/10/1993

 OFGEM Data on this Project: Trysglwyn: Wind : -na-

 Calculations


Capacity: 12.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 23 m/s (51.451 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 12.6 start: 5 Optimum: 15/ Stop: 23 / wind: / ratio 354797

Project Info
Turbine Image

National Wind Power

Site Location Map

The wind farms that generate enough power to make a few cups of tea
The Telegraph examined a snapshot of RWE’s own figures on Thursday afternoon last week. One wind farm TRYSGLWYN, which is in Anglesey in Wales, was producing a total of 6 kilowatts (KW) - just enough to boil two kettles each with 3KW of power.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School