Kennoxhead Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Kennoxhead Wind Farm (Wind , Agreed/Planning)

 General Information.

Location in the UK : Scotland, glespin south lanarkshire    
Type of installation: Wind    on/offshore: on
Turbines :13  Capacity : 62 MW
Approx Date of 1st power generation: 2022

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

PNE Wind Planning Permission Grant
Currently in development, Kennoxhead phase 2 is expected to enter commercial operation in 2024, and will bring the total installed capacity at Kennoxhead to an anticipated 174 MW.

 Turbine Make and Specs

Model: Nordex N133 Start Speed: 3
Capacity: 4.8 Optimal Speed: 0
Rotor Diameter: 133 Stop Speed: 28
Hub Height 93   Avg for all turbines: Avg. Elevation:
Web Page: https://www.nordex-online.com/en/product/n133-4-8/
Comment:

 Address

Kennoxhead, south of Hagshaw Hill

 Associated Companies.

Relationship Company (For: Kennoxhead )
DeveloperOrsted
OwnerOrsted
OperatorOrsted

 DECC Data on this Project: Kennoxhead :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Kennoxhead Wind Farm Extension (Phase 2)     38.4 MW
Energy Type: Wind Onshore
County: South Lanarkshire     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 7204 /     District:
Applicant: Orsted Onshore Limited     Application : ECU00002038 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 8 Turbine Capacity: 4.7999999999999998
Height of Turbines: 180 Calculated capacity: 38.4
Site Address: Land north of Southern Upland hills, South Lanarkshire
 
County: South Lanarkshire Region: Scotland
OS Coordinates: 276456 / 276456
Development Status: Planning Permission Granted
Application Submitted: 3/31/2020 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 8/19/2022
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 9/22/2025    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Kennoxhead Wind Farm     62 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4385 / B0424     District:
Applicant: Orsted Onshore Limited     Application :  EC00002101 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 13 Turbine Capacity: 4.7999999999999998
Height of Turbines: 180 Calculated capacity: 62.4
Site Address: Kennoxhead, south of Hagshaw Hill
 
County: Strathclyde Region: Scotland
OS Coordinates: 277147 / 277147
Development Status: Under Construction
Application Submitted: 1/31/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 3/1/2021    
Generator Live This Record Last Updated: 8/19/2022
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 7/23/2020    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Kennoxhead: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371362

Project Info
KENNOXHEAD Wind Farm Extension II (Penbreck)
Scoping .. Wind Farm (Generating station increase of >10 < 100 MW Capacity)

KENNOXHEAD Wind Farm Extension II (Penbreck) – Pre application
(August 2020) Additional Extension to KENNOXHEAD Wind Farm comprising up to 9 turbines, with a maximum blade tip height of 220m.

KENNOXHEAD Phase 2
14 onshore wind turbines, adding an anticipated 112 MW installed capacity

Jones Bros picked for 13-turbine wind farm
It has been appointed by Brookfield Renewable UK Limited (BRUK) to deliver KENNOXHEAD Phase 1, a 60MW development near the village of Glespin.

KENNOXHEAD: Non Technical Summary

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School