Page views this IP this session = 1 of 10 unsubscribed pagesLong Lane Solar Farm
Long Lane Solar Farm (Solar , Active) Location in the UK : England, Nottinghamshire NG16 1HY Type of installation: Solar on/offshore: on Solar Panels :68000 Capacity : 17 MW Approx Date of 1st power generation: January 2017
/YES
Earthworm Planning Permission Grant Land Off, Long Lane, Watnall, Nottingham
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Long Lane Solar Farm / Nottingham Brick Works 17 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Nottinghamshire Country: England LPA: Broxtowe Borough Council
|
Site ID and Reference: |
5603 /
District:
|
Applicant: |
Earthworm/ EW Capital
Application :
15/00525/FUL
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land Off, Long Lane, Watnall, Nottingham
|
|
NG16 1HY
|
County: |
Nottinghamshire Region: East Midlands
|
OS Coordinates: |
451522 / 451522
|
Development Status: |
Under Construction
|
Application Submitted: |
7/22/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
7/15/2016
|
|
|
Generator Live |
|
This Record Last Updated: |
12/2/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Long Lane Solar Farm 17 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Nottinghamshire Country: England LPA: Broxtowe Borough Council
|
Site ID and Reference: |
5144 /
District:
|
Applicant: |
Earthworm
Application :
15/00174/FUL
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Land Off, Long Lane, Watnall, Nottingham,
|
|
NG16 1HY
|
County: |
Nottinghamshire Region: East Midlands
|
OS Coordinates: |
451522 / 451522
|
Development Status: |
Revised
|
Application Submitted: |
3/14/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
6/17/2015
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/2/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
6/17/2015 |
Site Name: |
Scotch Argus PV
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
P00698RUEN
|
Capacity: |
4000
|
Status: |
Preliminary
|
Accreditation Date: |
3/14/2015
|
|
|
Commission Date: |
1/31/2017
|
|
|
Applicant: |
Scotch Argus Ltd
|
Applicant Address: |
Burnham Landscapes Ltd
Browns Road
DAVENTRY
NN11 4NS
England
|
Address: |
Long Lane
Watnall
NG16 1HY
England
|
Site Name: |
Black Rustic
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
P00697RUEN
|
Capacity: |
4000
|
Status: |
Preliminary
|
Accreditation Date: |
3/14/2015
|
|
|
Commission Date: |
1/31/2017
|
|
|
Applicant: |
Black Rustic Ltd
|
Applicant Address: |
Black Rustic Ltd
Browns Road
DAVENTRY
NN11 4NS
England
|
Address: |
Long Lane
Hucknall
NG16 1HU
England
|
Site Name: |
Ribband Wave
|
Generator Type: |
Photovoltaic (RO code = RU)
|
Scheme : |
RO
|
Generator ID: |
P00699RUEN
|
Capacity: |
2000
|
Status: |
Preliminary
|
Accreditation Date: |
3/14/2015
|
|
|
Commission Date: |
1/31/2017
|
|
|
Applicant: |
Ribband Wave Ltd
|
Applicant Address: |
Burnham Landscapes Ltd
Browns Road
DAVENTRY
NN11 4NS
England
|
Address: |
Long Lane
Watnall
NG15 6RT
England
|
Project Info |
Broxtowe's solar farm plan gets turned down Developers Earthworm Energy Limited wanted to put 68,000 solar panels on the site of the former Watnall Brickworks off LONG LANE, with the site running adjacent to the M1.
Plans for rejected Watnall solar farm go in for second try Earthworm Energy Limited had its scheme to build a 17MW solar farm at the former Watnall Brickworks in LONG LANE turned down by Broxtowe Borough Council in June.
Plug gets pulled on Watnall solar farm Broxtowe Borough Councillors has blocked proposals for building a solar energy farm in the borough.
At a meeting of the planning committee on June 17 , members refused to open the 24 hectare site off LONG LANE, Watnall, to development.
Sheep and sun at ‘solar park’ The green energy site at Rotherdale Farm, LONG LANE, Tilesford, near Pinvin, has been given the go-ahead by Wychavon District Council
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|