Page views this IP this session = 1 of 10 unsubscribed pagesSowerby Solar Farm
Sowerby Solar Farm (Solar , Active) Location in the UK : England, Cumbria LA14 4QY Type of installation: Solar on/offshore: on Solar Panels :0 Capacity : 4.99 MW Approx Date of 1st power generation: Jan 2015
/YES
FAB Energy Solutions Planning Permission Grant Sowerby Lodge Farm, Bank Lane, Barrow-in-Furness
Relationship |
Company (For:
Sowerby
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Sowerby Lodge 4.2 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Cumbria Country: England LPA: Barrow in Furness Borough Council
|
Site ID and Reference: |
5651 /
District:
|
Applicant: |
Sowerby Solar Solar Ltd
Application :
B03/2015/0614
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Sowerby Lodge (Land north of), Bank Lane, Barrow-In-Furness
|
|
LA14 4QY
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
319156 / 319156
|
Development Status: |
Planning Permission Expired
|
Application Submitted: |
3/9/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
12/10/2019
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
2/8/2019 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Sowerby Lodge Farm 5 MW
|
Energy Type: |
Solar Photovoltaics |
County: |
Cumbria Country: England LPA: Barrow in Furness Borough Council
|
Site ID and Reference: |
1506 / C2979
District:
|
Applicant: |
Gamma Solar Limited
Application :
B03/2014/0643
|
(Go to search to find Application) |
|
--- For Solar Farms / Parks --- |
Mounting of panels: |
Ground |
|
|
|
--- ----- ---- --- |
Site Address: |
Sowerby Lodge Farm, Bank Lane, Barrow-in-Furness
|
|
LA14 4QY
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
319090 / 319090
|
Development Status: |
Operational
|
Application Submitted: |
10/7/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
5/30/2018
|
|
|
Generator Live |
6/30/2018
|
This Record Last Updated: |
9/27/2018
|
RO Banding (ROC/MWh) |
1.4
|
FiT Tariff (p/kWh): |
6
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
2/13/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Sowerby
|
Generator Type: |
Photovoltaic
|
Scheme : |
REGO
|
Generator ID: |
G06912PVEN
|
Capacity: |
4000
|
Status: |
Live
|
Accreditation Date: |
10/7/2014
|
|
|
Commission Date: |
12/1/2015
|
|
|
Applicant: |
Sowerby Lodge Ltd
|
Applicant Address: |
117a Hill Cot Road
BOLTON
BL1 8RW
England
|
Address: |
Sowerby Lodge Farm
Bank Lane
Barrow-in-Furness
LA14 4QY
England
|
|
Assumptions: Capacity: 4000kW 4 MW, Thus over the month Capacity * 720 hours per month = 2880 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sorry I found no matches, Please try again.
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|