Sorry I found no matches, Please try again. 176
vid = 3905pws_id = 310023pws_id = 310023 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 8 Seen ) ID:1 Ind:0 IP: 3.21.43.104 {832) YESU WSHW: 8/10
Loading
Page views this IP this session = 8 of 10 unsubscribed pages

Sowerby Solar Farm

Sowerby Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, Cumbria LA14 4QY    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 4.99 MW
Approx Date of 1st power generation: Jan 2015

/YES

 Comment

FAB Energy Solutions Planning Permission Grant

 Address

Sowerby Lodge Farm, Bank Lane, Barrow-in-Furness

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Sowerby )

 DECC Data on this Project: Sowerby :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Sowerby Lodge     4.2 MW
Energy Type: Solar Photovoltaics
County: Cumbria     Country: England     LPA: Barrow in Furness Borough Council
Site ID and Reference: 5651 /     District:
Applicant: Sowerby Solar Solar Ltd     Application : B03/2015/0614 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Sowerby Lodge (Land north of), Bank Lane, Barrow-In-Furness
  LA14 4QY
County: Cumbria Region: North West
OS Coordinates: 319156 / 319156
Development Status: Planning Permission Expired
Application Submitted: 3/9/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 12/10/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 2/8/2019    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Sowerby Lodge Farm     5 MW
Energy Type: Solar Photovoltaics
County: Cumbria     Country: England     LPA: Barrow in Furness Borough Council
Site ID and Reference: 1506 / C2979     District:
Applicant: Gamma Solar Limited     Application : B03/2014/0643 (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Sowerby Lodge Farm, Bank Lane, Barrow-in-Furness
  LA14 4QY
County: Cumbria Region: North West
OS Coordinates: 319090 / 319090
Development Status: Operational
Application Submitted: 10/7/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/30/2018    
Generator Live 6/30/2018 This Record Last Updated: 9/27/2018
RO Banding (ROC/MWh) 1.4 FiT Tariff (p/kWh): 6
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 2/13/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Sowerby: Solar :

Site Name: Sowerby
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G06912PVEN
Capacity: 4000 Status: Live
Accreditation Date: 10/7/2014    
Commission Date: 12/1/2015    
Applicant: Sowerby Lodge Ltd
Applicant Address: 117a Hill Cot Road BOLTON BL1 8RW England
Address: Sowerby Lodge Farm Bank Lane Barrow-in-Furness LA14 4QY England
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 4000kW 4 MW,
Thus over the month Capacity * 720 hours per month = 2880 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School