Windy Standard Wind Farm (Wind , Active) Location in the UK : Scotland, Dumfries & Galloway Type of installation: Wind on/offshore: on Turbines :36 Capacity : 21.6 MW Approx Date of 1st power generation: September 1996
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Made up of Gallows Rig and Polwhat Rig
Windy Standard became fully operational in November 1996 and at the time was Scotlands second largest wind farm. It consists of 36 wind turbines each of 600 kilowatts (kW) maximum output, manufactured by Nordtank A/S of Denmark. The wind farm has a combined maximum power of 21.6 megawatts (MW).
Agreed: Phase II shown
Proposed Phase III shown
Model: |
Nordtank NTK600/43
|
Start Speed: |
4
|
Capacity: |
0.6
|
Optimal Speed: |
14
|
Rotor Diameter: |
43
|
Stop Speed: |
25
|
Hub Height |
35 Avg for all turbines:55
|
Avg. Elevation: |
567
|
Web Page: |
|
Comment: |
|
Brockloch Rig (Windy Standard II) Wind FarmOff the A713 Ayr to Castle Douglas Trunk Road Carsphairn DG7 3TJ Scotland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Windy Standard III Wind Farm (Brockloch Rig Phase 2) 80.8 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4615 / B1290
District:
|
Applicant: |
Fred Olsen Renewables
Application :
ECU00000335
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
20 |
Turbine Capacity: |
4 |
Height of Turbines: |
177.5 |
Calculated capacity: |
80 |
Site Address: |
Near New Cummock
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
257695 / 257695
|
Development Status: |
Appeal Granted
|
Application Submitted: |
12/9/2016
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/12/2023
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
3/23/2027 |
|
|
Secretary of State - |
Appeal Lodged: |
5/2/2018 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Brochloch Rig (formerly Windy Standard II) 90 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
4431 / N00068W
District:
|
Applicant: |
Fred Olsen Renewables
Application :
02/n/20002
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
30 |
Turbine Capacity: |
3 |
Height of Turbines: |
120 |
Calculated capacity: |
90 |
Site Address: |
Near New Cummock
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
260200 / 260200
|
Development Status: |
Operational
|
Application Submitted: |
12/14/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
8/7/2014
|
|
|
Generator Live |
6/15/2017
|
This Record Last Updated: |
2/27/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Brochloch Rig 1 (formerly Windy Standard) 21.6 MW
|
Energy Type: |
Wind Onshore |
County: |
Dumfries and Galloway Country: Scotland LPA: Dumfries and Galloway Council
|
Site ID and Reference: |
4527 / S0001W1
District:
|
Applicant: |
Fred Olsen Renewables
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
36 |
Turbine Capacity: |
0.59999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
21.6 |
Site Address: |
Windy Standard
|
|
|
County: |
Dumfries and Galloway Region: Scotland
|
OS Coordinates: |
261500 / 261500
|
Development Status: |
Operational
|
Application Submitted: |
7/24/1995
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
10/1/1996
|
This Record Last Updated: |
9/4/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
MW
|
Energy Type: |
|
County: |
Country: LPA:
|
Site ID and Reference: |
/
District:
|
Applicant: |
Application :
|
(Go to search to find Application) |
Site Address: |
|
|
|
County: |
Region:
|
OS Coordinates: |
/
|
Development Status: |
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Windy Standard II (Brockloch Rig)
|
Generator Type: |
On-shore wind (ROS code = SQ)
|
Scheme : |
RO
|
Generator ID: |
R00299SQSC
|
Capacity: |
61000
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
7/3/2017
|
|
|
Applicant: |
Fred Olsen Renewables Ltd
|
Applicant Address: |
2nd Floor
64-65 Vincent Square
London
SW1P 2NU
England
|
Address: |
Brockloch Rig (Windy Standard II) Wind Farm
Off the A713 Ayr to Castle Douglas Trunk Road
Carsphairn
DG7 3TJ
Scotland
|
Site Name: |
Windy Standard II (Brockloch Rig)
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G02580NWSC
|
Capacity: |
61000
|
Status: |
Live
|
Accreditation Date: |
|
|
|
Commission Date: |
7/3/2017
|
|
|
Applicant: |
Fred Olsen Renewables Ltd
|
Applicant Address: |
2nd Floor
64-65 Vincent Square
London
SW1P 2NU
England
|
Address: |
Brockloch Rig (Windy Standard II) Wind Farm
Off the A713 Ayr to Castle Douglas Trunk Road
Carsphairn
DG7 3TJ
Scotland
|
|
Assumptions: Capacity: 61000kW 61 MW, Thus over the month Capacity * 720 hours per month = 43920 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/03/2018 | | | 18236 | 29.90% | Issued | 01/02/2018 | | | 12533 | 20.55% | Issued | 01/01/2018 | | | 19148 | 31.39% | Issued | 01/12/2017 | | | 13918 | 22.82% | Issued | 01/11/2017 | | | 8780 | 14.39% | Issued | 01/10/2017 | | | 13437 | 22.03% | Issued | 01/09/2017 | | | 8919 | 14.62% | Retired |
|
Capacity: 163.2 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 19 m/s (42.503 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 4/3/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|