Sorry I found no matches, Please try again. 176
vid = 3931pws_id = 353165pws_id = 353165
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.144.93.14 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Greenside Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Greenside Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Grampian AB42 3HJ    
Type of installation: Wind    on/offshore: on
Turbines :4  Capacity : 9.2 MW
Approx Date of 1st power generation: January 2013

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Greenside Wind Cluster
Wind Energy Ltd Operational

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 65   Avg for all turbines:65 Avg. Elevation: 37
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

Crimond, Fraserburgh, AB42 3HJ

 Associated Companies.

Relationship Company (For: Greenside )
DeveloperGreenCat Renewables
DeveloperGreenside energy
ContractorRaymond Brown Renewables

 DECC Data on this Project: Greenside :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Land at Overside and Greenwellheads Farms     9.2 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3802 / AA339     District:
Applicant: Greenside Wind Energy Ltd     Application : APP/2011/1024 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 9.2
Site Address: Crimond, Fraserburgh, AB42 3HJ
 
County: Grampian Region: Scotland
OS Coordinates: 406123 / 406123
Development Status: Operational
Application Submitted: 3/30/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 11/1/2013 This Record Last Updated: 12/9/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Greenside: Wind :

Site Name: GWEL Operating Company Ltd
Generator Type: Wind
Scheme : REGO Generator ID: G02006NWSC
Capacity: 9140 Status: Live
Accreditation Date: 3/30/2011    
Commission Date: 11/6/2013    
Applicant: GWEL Operating Company Limited
Applicant Address: Ednie House St Fergus Peterhead AB42 3BU Scotland
Address: GWEL Operating Company Limited Overside St Fergus Peterhead AB42 3HL Scotland
 
Assumptions: Capacity: 9140kW 9.14 MW,
Thus over the month Capacity * 720 hours per month = 6580.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 1381 15.11% Issued
01/03/2018 2716 29.72% Issued
01/02/2018 2450 26.81% Issued
01/01/2018 2753 30.12% Issued
01/12/2017 2434 26.63% Issued
01/11/2017 3092 33.83% Issued
01/10/2017 2179 23.84% Issued
01/10/2017 415 4.54% Issued
01/09/2017 2135 23.36% Issued
01/08/2017 1245 13.62% Issued
01/07/2017 1157 12.66% Issued
01/06/2017 1456 15.93% Issued
01/05/2017 1426 15.60% Issued
01/04/2017 2436 26.65% Issued
01/03/2017 1736 18.99% Redeemed
01/02/2017 2828 30.94% Redeemed
01/01/2017 2889 31.61% Redeemed
Dec-16 02204 2449 26.79% Issued
Nov-16 01946 2163 23.67% Issued
Oct-16 01433 1593 17.43% Issued
Sep-16 0787 874 9.56% Issued
Aug-16 01026 1139 12.46% Issued
Jul-16 0757 841 9.20% Issued
Jul-16 0757 841 9.20% Issued
May-16 01404 1560 17.07% Issued
Mar-16 01604 1782 19.50% Redeemed
Feb-16 02203 2448 26.78% Redeemed
Nov-15 02119 2355 25.77% Redeemed
Oct-15 01542 1714 18.75% Redeemed
Sep-15 01664 1848 20.22% Redeemed
Aug-15 01499 1665 18.22% Redeemed
Jul-15 14931344 1494 16.35% Redeemed
Jun-15 13351201 1335 14.61% Redeemed
May-15 20511846 2051 22.44% Redeemed
Apr-15 12991168 1298 14.20% Redeemed
Mar-15 23492115 2350 25.71% Redeemed
Feb-15 25062255 2505 27.41% Redeemed
Jan-15 36693303 3670 40.15% Redeemed
Dec-14 27062435 2705 29.60% Redeemed
Nov-14 24512206 2452 26.83% Redeemed
Oct-14 26832415 2683 29.35% Redeemed
Sep-14 1056950 1055 11.54% Redeemed
Aug-14 18681682 1 0.01% Redeemed
Jul-14 928835 927 10.14% Redeemed
Jun-14 721649 721 7.89% Redeemed
May-14 961865 961 10.51% Redeemed
Apr-14 16261464 1626 17.79% Redeemed
Mar-14 25212268 2520 27.57% Redeemed
Feb-14 30822775 3083 33.73% Redeemed
Jan-14 33413007 3341 36.55% Redeemed
Dec-13 32172895 3217 35.20% Redeemed
Nov-13 16451481 68 0.74% Revoked

 Calculations


Capacity: 18.4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 18.4 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 353165

Project Info
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School