Sorry I found no matches, Please try again. 176
vid = 3934pws_id = 352266pws_id = 352266
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.117.145.41 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Lochhead Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Lochhead Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, Strathclyde ML9 3PP    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 6 MW
Approx Date of 1st power generation: January 2009

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

A7 Energy / Green Energy Operational

 Turbine Make and Specs

Model: Senvion MM82 Start Speed: 2.5
Capacity: 2 Optimal Speed: 6
Rotor Diameter: 82 Stop Speed: 12
Hub Height 59   Avg for all turbines:59 Avg. Elevation: 169
Web Page: http://www.repower.de/fileadmin/download/produkte/PP_MM82_uk.pdf
Comment: 0

 Address

Lochhead Farm Carlisile Rd Stonehouse Larkhall ML9 3PP Scotland

 Associated Companies.

Relationship Company (For: Lochhead )
DeveloperGreen Energy (UK) Plc
DeveloperWind Prospect

 DECC Data on this Project: Lochhead :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Lochhead Farm     6 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: South Lanarkshire Council
Site ID and Reference: 3453 / N00389W     District:
Applicant: A7 Energy / Green Energy     Application : HM/05/0147 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2
Height of Turbines: Calculated capacity: 6
Site Address: Land at Lochhead Farm , Stonehouse
 
County: Strathclyde Region: Scotland
OS Coordinates: 275500 / 275500
Development Status: Operational
Application Submitted: 4/1/2005 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 7/1/2009 This Record Last Updated: 2/4/2009
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Lochhead: Wind :

Site Name: Lochhead Wind Farm
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00110SQSC
Capacity: 6000 Status: Live
Accreditation Date: 4/1/2005    
Commission Date: 5/29/2009    
Applicant: Greendykeside Wind Farm
Applicant Address: a7 Greendykeside Ltd 31A The Avenue Poole BH13 6LT England
Address: Lochhead Farm Carlisile Rd Stonehouse Larkhall ML9 3PP Scotland

Site Name: Lochhead Wind Farm
Generator Type: Wind
Scheme : REGO Generator ID: G01508NWSC
Capacity: 6000 Status: Live
Accreditation Date: 4/1/2005    
Commission Date: 5/29/2009    
Applicant: Greendykeside Wind Farm
Applicant Address: a7 Greendykeside Ltd 31A The Avenue Poole BH13 6LT England
Address: Lochhead Farm Carlisile Rd Stonehouse Larkhall ML9 3PP Scotland
 
Assumptions: Capacity: 6000kW 6 MW,
Thus over the month Capacity * 720 hours per month = 4320 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/05/2018 759 12.65% Issued
01/04/2018 1093 18.22% Issued
01/03/2018 1447 24.12% Issued
01/02/2018 1001 16.68% Issued
01/01/2018 1582 26.37% Issued
01/12/2017 1269 21.15% Issued
01/11/2017 882 14.70% Issued
01/10/2017 1580 26.33% Issued
01/09/2017 739 12.32% Issued
01/08/2017 887 14.78% Issued
01/07/2017 822 13.70% Issued
01/06/2017 1167 19.45% Issued
01/05/2017 790 13.17% Issued
01/04/2017 1234 20.57% Issued
01/03/2017 1222 20.37% Redeemed
01/03/2017 2 0.03% Issued
01/02/2017 1412 23.53% Redeemed
01/01/2017 1050 17.50% Redeemed
Dec-16 01733 1733 28.88% Issued
Nov-16 0702 707 11.78% Issued
Oct-16 0573 577 9.62% Issued
Oct-16 00 577 9.62% Pending Tr
Sep-16 01184 1184 19.73% Issued
Aug-16 0943 943 15.72% Issued
Jul-16 0874 874 14.57% Issued
Jul-16 0874 874 14.57% Pending Tr
Jun-16 0379 384 6.40% Pending Tr
May-16 0896 896 14.93% Issued
Apr-16 0802 802 13.37% Issued
Mar-16 0846 850 14.17% Redeemed
Feb-16 01333 1333 22.22% Redeemed
Jan-16 01473 1473 24.55% Redeemed
Dec-15 02242 2242 37.37% Redeemed
Nov-15 01804 1804 30.07% Redeemed
Oct-15 0605 610 10.17% Redeemed
Sep-15 0415 420 7.00% Redeemed
Aug-15 0932 932 15.53% Redeemed
Jul-15 706706 706 11.77% Redeemed
Jun-15 10161016 1016 16.93% Redeemed
May-15 16571657 1657 27.62% Redeemed
Apr-15 10351035 1035 17.25% Redeemed
Mar-15 17351735 1735 28.92% Redeemed
Feb-15 13631364 1364 22.73% Redeemed
Jan-15 20562055 2055 34.25% Redeemed
Dec-14 12621263 1263 21.05% Redeemed
Nov-14 769768 768 12.80% Redeemed
Oct-14 16591660 1660 27.67% Redeemed
Sep-14 386381 386 6.43% Redeemed
Aug-14 10861086 1086 18.10% Redeemed
Jul-14 601597 601 10.02% Redeemed
Jun-14 285280 285 4.75% Redeemed
May-14 718718 718 11.97% Redeemed
Apr-14 10971097 1097 18.28% Redeemed
Mar-14 17611761 1761 29.35% Redeemed
Feb-14 20162016 2016 33.60% Redeemed
Jan-14 15621562 1562 26.03% Redeemed
Dec-13 25132513 2513 41.88% Redeemed
Nov-13 13351335 1335 22.25% Redeemed
Oct-13 12621262 1261 21.02% Redeemed
Sep-13 899900 900 15.00% Redeemed
Aug-13 936936 936 15.60% Redeemed
Jul-13 463459 462 7.70% Redeemed
Jun-13 637633 637 10.62% Redeemed
May-13 13571357 1357 22.62% Redeemed
Apr-13 13981398 1398 23.30% Redeemed
Mar-13 12591259 1259 20.98% Redeemed
Feb-13 799794 798 13.30% Redeemed
Jan-13 15741574 1574 26.23% Redeemed
Dec-12 13531353 1353 22.55% Redeemed
Nov-12 11881188 1188 19.80% Redeemed
Oct-12 623619 623 10.38% Redeemed
Sep-12 16591658 1658 27.63% Redeemed
Aug-12 649649 649 10.82% Redeemed
Jul-12 650646 650 10.83% Redeemed
Jun-12 776776 776 12.93% Redeemed
May-12 706702 706 11.77% Redeemed
Apr-12 812811 811 13.52% Redeemed
Mar-12 10791079 1079 17.98% Redeemed
Feb-12 15501550 1550 25.83% Redeemed
Jan-12 18921892 1892 31.53% Redeemed
Dec-11 21302131 2131 35.52% Redeemed
Nov-11 15071507 1507 25.12% Redeemed
Oct-11 18071806 1806 30.10% Redeemed
Sep-11 15501550 963 16.05% Redeemed
Aug-11 523522 522 8.70% Redeemed
Jul-11 322317 322 5.37% Redeemed
Jun-11 540537 541 9.02% Redeemed
May-11 18251825 1825 30.42% Redeemed
Apr-11 996996 996 16.60% Redeemed
Mar-11 873868 873 14.55% Redeemed
Feb-11 11391139 1139 18.98% Redeemed
Jan-11 11301131 1131 18.85% Redeemed
Dec-10 526517 525 8.75% Redeemed
Nov-10 12911292 1292 21.53% Redeemed
Oct-10 13621362 1362 22.70% Redeemed

 Calculations


Capacity: 12
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 12 m/s (26.844 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 12 start: 5 Optimum: 15/ Stop: 12 / wind: / ratio 352266

Project Info
Sainsbury's agrees wind power deal
The £8m deal is with a small wind farm at the A7 LOCHHEAD development, near Stonehouse in South Lanarkshire, which will provide the retailer with enough wind-generated energy to power four stores.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School