Sorry I found no matches, Please try again. 176
vid = 3953pws_id = 352905pws_id = 352905
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.118.186.156 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Courtstone Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Courtstone Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, AB41 7HH    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2.3 MW
Approx Date of 1st power generation: April 2009

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Mr E Lee, Mr John Lind & Mr John K Lind Operational

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 56   Avg for all turbines:56 Avg. Elevation: 141
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

Courtstone Methlick Ellon Ellon, Aberdeenshire AB41 7HH Scotland

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Courtstone )

 DECC Data on this Project: Courtstone :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Courtstone Wind Turbine     2.3 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 2782 / AA466     District:
Applicant: Private Developer     Application : APP/2006/3646 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 2.3
Site Address: Methlick Ellon AB41 7HH
 
County: Grampian Region: Scotland
OS Coordinates: 384413 / 384413
Development Status: Operational
Application Submitted: 9/15/2006 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 6/4/2009 This Record Last Updated: 9/14/2011
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Courtstone: Wind :

Site Name: Courtstone Wind Turbine
Generator Type: On-shore wind (ROS code = SQ)
Scheme : RO Generator ID: R00156SQSC
Capacity: 2254 Status: Live
Accreditation Date: 9/15/2006    
Commission Date: 5/4/2011    
Applicant: Keithfield Energy Limited
Applicant Address: Overton Of Keithfield Farm Methlick ELLON AB41 7EU Scotland
Address: Courtstone Methlick Ellon Ellon, Aberdeenshire AB41 7HH Scotland

Site Name: Courtstone Wind Turbine
Generator Type: Wind
Scheme : REGO Generator ID: G01726NWSC
Capacity: 2254 Status: Live
Accreditation Date: 9/15/2006    
Commission Date: 5/4/2011    
Applicant: Keithfield Energy Limited
Applicant Address: Overton Of Keithfield Farm Methlick ELLON AB41 7EU Scotland
Address: Courtstone Methlick Ellon Ellon, Aberdeenshire AB41 7HH Scotland
 
Assumptions: Capacity: 2254kW 2.254 MW,
Thus over the month Capacity * 720 hours per month = 1622.88 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 229 10.16% Issued
01/03/2018 386 17.13% Issued
01/02/2018 337 14.95% Issued
01/01/2018 459 20.36% Issued
01/12/2017 461 20.45% Issued
01/11/2017 484 21.47% Issued
01/10/2017 451 20.01% Issued
01/09/2017 308 13.66% Issued
01/08/2017 185 8.21% Issued
01/07/2017 178 7.90% Issued
01/06/2017 254 11.27% Issued
01/05/2017 206 9.14% Issued
01/04/2017 458 20.32% Issued
01/03/2017 314 13.93% Redeemed
01/02/2017 483 21.43% Redeemed
01/01/2017 504 22.36% Redeemed
Dec-16 0439 439 19.48% Issued
Nov-16 0318 318 14.11% Issued
Oct-16 0212 212 9.41% Issued
Sep-16 0322 322 14.29% Issued
Aug-16 0240 240 10.65% Issued
Jul-16 0125 125 5.55% Issued
Jul-16 0125 125 5.55% Issued
Jun-16 0194 194 8.61% Issued
May-16 0256 256 11.36% Issued
Apr-16 0366 366 16.24% Issued
Mar-16 0293 293 13.00% Redeemed
Feb-16 0455 455 20.19% Redeemed
Jan-16 0613 613 27.20% Redeemed
Dec-15 0670 670 29.72% Redeemed
Nov-15 0440 440 19.52% Redeemed
Oct-15 0222 222 9.85% Redeemed
Sep-15 0318 318 14.11% Redeemed
Aug-15 0264 264 11.71% Redeemed
Jul-15 214214 214 9.49% Redeemed
Jun-15 220220 220 9.76% Redeemed
May-15 373373 373 16.55% Redeemed
Apr-15 262262 262 11.62% Redeemed
Mar-15 525525 525 23.29% Redeemed
Feb-15 459459 459 20.36% Redeemed
Jan-15 732732 732 32.48% Redeemed
Dec-14 533534 534 23.69% Expired
Nov-14 358358 358 15.88% Redeemed
Oct-14 389389 389 17.26% Redeemed
Sep-14 152153 153 6.79% Redeemed
Aug-14 309309 309 13.71% Redeemed
Jul-14 134134 134 5.94% Redeemed
Jun-14 127128 128 5.68% Redeemed
May-14 148148 148 6.57% Redeemed
Apr-14 274274 274 12.16% Redeemed
Mar-14 514514 514 22.80% Redeemed
Feb-14 634634 634 28.13% Redeemed
Jan-14 591591 591 26.22% Redeemed
Dec-13 748748 748 33.19% Redeemed
Nov-13 453454 1 0.04% Redeemed
Oct-13 395395 1 0.04% Redeemed
Sep-13 300300 300 13.31% Redeemed
Aug-13 192192 192 8.52% Redeemed
Jul-13 101102 102 4.53% Redeemed
Jun-13 142141 141 6.26% Redeemed
May-13 420421 421 18.68% Redeemed
Apr-13 422421 421 18.68% Redeemed
Mar-13 334335 335 14.86% Redeemed
Feb-13 378378 378 16.77% Redeemed
Jan-13 473473 473 20.98% Redeemed
Dec-12 545546 546 24.22% Redeemed
Nov-12 347346 346 15.35% Redeemed
Oct-12 211211 211 9.36% Redeemed
Sep-12 359359 359 15.93% Redeemed
Aug-12 196196 196 8.70% Redeemed
Jul-12 155155 155 6.88% Redeemed
Jun-12 195195 195 8.65% Redeemed
May-12 200200 200 8.87% Redeemed
Apr-12 242243 243 10.78% Redeemed
Mar-12 340340 340 15.08% Redeemed
Feb-12 475475 475 21.07% Redeemed
Jan-12 594594 35 1.55% Revoked
Dec-11 629630 630 27.95% Redeemed
Nov-11 470470 470 20.85% Redeemed
Oct-11 496497 497 22.05% Redeemed
Sep-11 368368 368 16.33% Redeemed
Aug-11 280281 281 12.47% Redeemed
Jul-11 228227 227 10.07% Redeemed
Jun-11 139140 140 6.21% Redeemed
May-11 242243 243 10.78% Redeemed

 Calculations


Capacity: 4.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/22/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.6 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 352905

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School