Milton of Fisherie Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Milton of Fisherie Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, AB45 3PX    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 4.6 MW
Approx Date of 1st power generation: January 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

LocoGen Operational

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 64   Avg for all turbines:64 Avg. Elevation: 115
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

King Edward, Banff AB45 3PX

 Associated Companies.

Relationship Company (For: Milton of Fisherie )
DeveloperGreenCat Renewables

 DECC Data on this Project: Milton of Fisherie :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Milton of Fisherie Wind Cluster     4.6 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 3809 / AA391     District:
Applicant: LocoGen     Application : APP/2011/1659 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 4.6
Site Address: King Edward, Banff AB45 3PX
 
County: Grampian Region: Scotland
OS Coordinates: 375067 / 375067
Development Status: Operational
Application Submitted: 5/25/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/1/2015    
Generator Live 2/1/2016 This Record Last Updated: 4/28/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Milton of Fisherie: Wind :

Site Name: Milton of Fisherie Wind Turbines
Generator Type: Wind
Scheme : REGO Generator ID: G02412NWSC
Capacity: 4567 Status: Live
Accreditation Date: 5/25/2011    
Commission Date: 2/29/2016    
Applicant: Milwind Ltd
Applicant Address: Easter Cushnie Gamrie Banff AB45 3HT Scotland
Address: Milton of Fisherie King Edward Banff AB45 3PX Scotland
 
Assumptions: Capacity: 4567kW 4.567 MW,
Thus over the month Capacity * 720 hours per month = 3288.24 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 668 14.63% Issued
01/03/2018 956 20.93% Issued
01/02/2018 1040 22.77% Issued
01/01/2018 1179 25.82% Issued
01/11/2017 1483 32.47% Retired
01/10/2017 1190 26.06% Retired
01/09/2017 1044 22.86% Retired
01/08/2017 584 12.79% Issued
01/07/2017 518 11.34% Issued
01/06/2017 680 14.89% Retired
01/05/2017 619 13.55% Issued
01/04/2017 1134 24.83% Issued
01/03/2017 783 17.14% Issued
01/02/2017 1213 26.56% Issued
01/01/2017 1264 27.68% Issued
Dec-16 0976 1085 23.76% Pending Tr
Nov-16 0871 968 21.20% Pending Tr
Oct-16 0626 696 15.24% Pending Tr
Sep-16 0773 859 18.81% Pending Tr
Aug-16 0638 709 15.52% Pending Tr
Jul-16 0329 366 8.01% Pending Tr
Jul-16 0329 366 8.01% Pending Tr
Jun-16 0548 609 13.33% Pending Tr
May-16 0618 687 15.04% Pending Tr
Apr-16 0877 974 21.33% Pending Tr
Mar-16 0672 747 16.36% Pending Tr
Feb-16 010 11 0.24% Pending Tr

 Calculations


Capacity: 9.2
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 9.2 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 353997

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School