Sorry I found no matches, Please try again. 176
vid = 3972pws_id = 3044pws_id = 3044 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.137.176.125 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Creag Riabhach Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Creag Riabhach Wind Farm (Wind , Agreed/Planning)

 General Information.

Location in the UK : Scotland, Altnaharra    
Type of installation: Wind    on/offshore: on
Turbines :22  Capacity : 72.6 MW
Approx Date of 1st power generation:

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Creag Riabhach Wind Farm Ltd Planning Application Subm

 Turbine Make and Specs

Model: Vestas V112 Start Speed: 3
Capacity: 3.3 Optimal Speed: 13
Rotor Diameter: 112 Stop Speed: 25
Hub Height 75   Avg for all turbines: Avg. Elevation:
Web Page: http://www.vestas.com/en/products_and_services/turbines/v112-3_3_mw
Comment: The V112-3.3 MW™ IEC IB is a high-wind turbine and has a very high capacity factor. Similar to the other 3 MW turbines, the V112-3.3 MW™ IEC IB turbine makes efficient use of its grid compatibility and is an optimal choice for sites with MW constraints.

 Address

Creag Riabhach Lairg Highland Region: Scotland

 Associated Companies.

Relationship Company (For: Creag Riabhach )
ConsultantPegasus Planning Group

 DECC Data on this Project: Creag Riabhach :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Creag Riabhach Wind Farm     90 MW
Energy Type: Wind Onshore
County: Highland     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4300 / C0814     District:
Applicant: ERG     Application : EC00002078 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 22 Turbine Capacity: 4.2000000000000002
Height of Turbines: 125 Calculated capacity: 92.4
Site Address: Creag Riabhach Lairg
 
County: Highland Region: Scotland
OS Coordinates: 252589 / 252589
Development Status: Operational
Application Submitted: 1/3/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/24/2021    
Generator Live 1/12/2023 This Record Last Updated: 1/16/2023
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Creag Riabhach: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 3044

Project Info
The CREAG RIABHACH Wind Farm proposal
The CREAG RIABHACH Wind Farm proposal comprises twenty-two wind turbines with a 125 metre blade tip height near Altnaharra in the Scottish Highlands.

CREAG RIABHACH wind farm connection
To enable the connection of the CREAG RIABHACH wind farm, we are proposing to construct a new 132kV overhead line, approximately 20km in length

New 22-turbine Highlands wind farm to generate £9m a year in community benefits
The Scot-Govt. has given the planning go-ahead to construction of the 22 turbine CREAG RIABHACH farm on the Altnaharra Estate, near Lairg, in the North Highlands.

Scotland approves construction of CREAG RIABHACH windfarm in North Highlands
Scotland has approved construction of the CREAG RIABHACH windfarm on the Altnaharra Estate, near Lairg in the North Highlands.

Plans for 22-turbine wind farm near Altnaharra approved
Consent for the construction of a 22-turbine wind farm in the Highlands has been given by the Scottish government. More than 200 objections were lodged against CREAG RIABHACH wind farm near Altnaharra.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School