Haven Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Haven Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Oxhill Farm Blackmor Park Malvern    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 1.2 MW
Approx Date of 1st power generation: May 2003

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Mr. Bowles Operational

 Turbine Make and Specs

Model: Wind Turbine- Generic Start Speed: 5
Capacity: 2 Optimal Speed: 15
Rotor Diameter: 100 Stop Speed: 25
Hub Height 0   Avg for all turbines:0 Avg. Elevation: 189
Web Page:
Comment:

 Address

The Haven Oxhill Farm Blackmor Park Malvern Worcestershire

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Haven )

 DECC Data on this Project: Haven :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: The Haven     1.2 MW
Energy Type: Wind Onshore
County: Hereford and Worcester     Country: England     LPA: Malvern Hills District Council
Site ID and Reference: 3179 / N00163W     District:
Applicant: Private Developer     Application : 02\01784\FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 1.2
Height of Turbines: Calculated capacity: 1.2
Site Address: The Haven Oxhill Farm Blackmor Park Malvern Worcestershire
 
County: Hereford and Worcester Region: West Midlands
OS Coordinates: 378300 / 378300
Development Status: Operational
Application Submitted: 12/18/2002 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 11/5/2003 This Record Last Updated: 9/26/2005
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Haven: Wind :

 Calculations


Capacity: 2.4
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/15/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 2.4 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 354035

Project Info
Wind farm aims to deliver £100m boost to South Lanarkshire economy
With construction of the 88MW Kype Muir Wind Farm, south of StratHAVEN, well underway, it is now estimated that the project will be worth more than £100m to the local economy.

£110K boost for dialysis unit in StoneHAVEN
Renewable energy company Eneco, owner of the nearby Tullo Wind Farm, officially launched Twinsheils Wind Farm earlier this month.

Milford HAVEN wind turbines, Total
As a part of its programme of developing alternatives to fossil fuels, Total has sought to increase its involvement in wind-energy projects.

Solstice Renewables is working with Cirencester Royal Agricultural University;
Merston: The whole area will move from conventional farming to being managed as a mixeduse Sustainable Agri-Energy Park that generates 11.4MW of renewable electricity, crops and a biodiversity HAVEN for the duration of the solar park

quarter scale prototype of WaveSub
Wave power device that promises to cut cost of marine energy to be tested in Milford HAVEN later this year

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School