Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMornflake Oats Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Mornflake Oats Wind Farm (Wind , Active) Location in the UK : Scotland, AB45 2LR Type of installation: Wind on/offshore: on Turbines :1 Capacity : 2.3 MW Approx Date of 1st power generation: January 2012
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Mornflake Oats/ Hamlyns Oats Operational
Model: |
Enercon E70
|
Start Speed: |
4
|
Capacity: |
2.3
|
Optimal Speed: |
13.5
|
Rotor Diameter: |
71
|
Stop Speed: |
31
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
0
|
Web Page: |
http://www.enercon.de/en-en/61.htm |
Comment: |
Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate
|
Cairnton Road Boyndie Banff AB45 2LR
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Mornflake Oats Wind Turbine 2.3 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Aberdeenshire Council
|
Site ID and Reference: |
2822 / B0301
District:
|
Applicant: |
Mornflake Oats/ Hamlyns Oats
Application :
APP/2008/2874
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
1 |
Turbine Capacity: |
2.2999999999999998 |
Height of Turbines: |
|
Calculated capacity: |
2.3 |
Site Address: |
Cairnton Road
Boyndie
Banff
AB45 2LR
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
361543 / 361543
|
Development Status: |
Operational
|
Application Submitted: |
8/5/2008
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/18/2012
|
This Record Last Updated: |
1/31/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Mornflake - Boyndie
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01752NWSC
|
Capacity: |
2300
|
Status: |
Live
|
Accreditation Date: |
8/5/2008
|
|
|
Commission Date: |
12/15/2011
|
|
|
Applicant: |
Mornflake Energy Ltd
|
Applicant Address: |
North Western Mills
Gresty Road
Crewe
CW2 6HP
England
|
Address: |
Cairnton Road
Boyndie
Near Banff
AB45 2LR
Scotland
|
|
Assumptions: Capacity: 2300kW 2.3 MW, Thus over the month Capacity * 720 hours per month = 1656 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
Sorry I found no matches, Please try again.
|
Capacity: 4.6 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 31 m/s (69.347 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|