Sorry I found no matches, Please try again. 176
vid = 3988pws_id = 353095pws_id = 353095
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.137.181.69 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Mornflake Oats Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Mornflake Oats Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, AB45 2LR    
Type of installation: Wind    on/offshore: on
Turbines :1  Capacity : 2.3 MW
Approx Date of 1st power generation: January 2012

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Mornflake Oats/ Hamlyns Oats Operational

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 0
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

Cairnton Road Boyndie Banff AB45 2LR

 Associated Companies.

Relationship Company (For: Mornflake Oats )
ContractorRaymond Brown Renewables

 DECC Data on this Project: Mornflake Oats :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Mornflake Oats Wind Turbine     2.3 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 2822 / B0301     District:
Applicant: Mornflake Oats/ Hamlyns Oats     Application : APP/2008/2874 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 1 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 2.3
Site Address: Cairnton Road Boyndie Banff AB45 2LR
 
County: Grampian Region: Scotland
OS Coordinates: 361543 / 361543
Development Status: Operational
Application Submitted: 8/5/2008 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 1/18/2012 This Record Last Updated: 1/31/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Mornflake Oats: Wind :

Site Name: Mornflake - Boyndie
Generator Type: Wind
Scheme : REGO Generator ID: G01752NWSC
Capacity: 2300 Status: Live
Accreditation Date: 8/5/2008    
Commission Date: 12/15/2011    
Applicant: Mornflake Energy Ltd
Applicant Address: North Western Mills Gresty Road Crewe CW2 6HP England
Address: Cairnton Road Boyndie Near Banff AB45 2LR Scotland
 
Sorry I found no matches, Please try again.
Assumptions: Capacity: 2300kW 2.3 MW,
Thus over the month Capacity * 720 hours per month = 1656 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status

 Calculations


Capacity: 4.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 4.6 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 353095

Project Info
MORNFLAKE OATS : Sustainability

MORNFLAKE OATS : Youtube Turbine Installation

Modern Banff cereal mill becomes directly wind powered
The owners of the MORNFLAKE OATS cereal mill in Banff say they have gone back to their roots by investing £3.5m in the project.

©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School