Sorry I found no matches, Please try again. 176
vid = 3990pws_id = 351375pws_id = 351375
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.218.73.233 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Hill of Skilmafilly Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Hill of Skilmafilly Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, AB41 8YD    
Type of installation: Wind    on/offshore: on
Turbines :3  Capacity : 6.9 MW
Approx Date of 1st power generation: February 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

SAC Environment And Design Operational

 Turbine Make and Specs

Model: Enercon E70 Start Speed: 4
Capacity: 2.3 Optimal Speed: 13.5
Rotor Diameter: 71 Stop Speed: 31
Hub Height 60   Avg for all turbines:60 Avg. Elevation: 155
Web Page: http://www.enercon.de/en-en/61.htm
Comment: Gearless, variable speed, single blade adjustment. Start and Stop: Guesstimate

 Address

Auchnagatt, Ellon, AB41 8YD

 Associated Companies.

Relationship Company (For: Hill of Skilmafilly )
ContractorRaymond Brown Renewables

 DECC Data on this Project: Hill of Skilmafilly :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Hill of Skilmafilly Cloffrickford (Denmore) Wind Farm     6.9 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Aberdeenshire Council
Site ID and Reference: 4170 / AA319     District:
Applicant: SAC Environment And Design     Application : APP/2011/0692 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 3 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 6.9
Site Address: Auchnagatt, Ellon, AB41 8YD
 
County: Grampian Region: Scotland
OS Coordinates: 390213 / 390213
Development Status: Operational
Application Submitted: 3/4/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/9/2013    
Generator Live 2/16/2015 This Record Last Updated: 5/7/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Hill of Skilmafilly: Wind :

Site Name: Hill of Skilmafilly Full Accreditation
Generator Type: Wind
Scheme : REGO Generator ID: G02119NWSC
Capacity: 6815 Status: Live
Accreditation Date: 3/4/2011    
Commission Date: 12/16/2014    
Applicant: Cloffrickford Renewable Energy Company Ltd
Applicant Address: Cloffrickford Auchnagatt ELLON AB41 8YD Scotland
Address: Hill of Skilmafilly near Methlick Ellon AB418TN Scotland
 
Assumptions: Capacity: 6815kW 6.815 MW,
Thus over the month Capacity * 720 hours per month = 4906.8 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 920 13.50% Issued
01/03/2018 1935 28.39% Issued
01/02/2018 1768 25.94% Issued
01/01/2018 1944 28.53% Issued
01/12/2017 1685 24.72% Issued
01/11/2017 2087 30.62% Issued
01/09/2017 1581 23.20% Issued
01/08/2017 874 12.82% Issued
01/07/2017 864 12.68% Issued
01/06/2017 1096 16.08% Issued
01/05/2017 1007 14.78% Issued
01/04/2017 1678 24.62% Issued
01/03/2017 1162 17.05% Redeemed
01/02/2017 1491 21.88% Issued
01/01/2017 1749 25.66% Issued
Dec-16 01508 1715 25.17% Issued
Nov-16 01267 1443 21.17% Issued
Oct-16 01045 1192 17.49% Issued
Oct-16 00 1192 17.49% Pending Tr
Sep-16 01299 1477 21.67% Issued
Aug-16 0916 1042 15.29% Issued
Jul-16 0561 638 9.36% Issued
Jul-16 0561 638 9.36% Issued
Nov-15 01391 1587 23.29% Issued
Oct-15 01088 1240 18.20% Issued
Sep-15 01328 1513 22.20% Issued
Aug-15 01135 595 8.73% Issued
Jul-15 770693 82 1.20% Redeemed
Jun-15 929835 745 10.93% Redeemed
May-15 14191277 1459 21.41% Expired
Apr-15 928834 1 0.01% Retired
Mar-15 18061625 1757 25.78% Redeemed
Feb-15 15561400 1513 22.20% Redeemed
Jan-15 959862 931 13.66% Redeemed
Dec-14 267241 267 3.92% Redeemed

 Calculations


Capacity: 13.8
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 31 m/s (69.347 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 13.8 start: 5 Optimum: 15/ Stop: 31 / wind: / ratio 351375

Project Info
Making a difference to the future
This is the advice from David Smith, an arable and beef farmer, who is in the process of adding three more turbines to his wind project, based at HILL OF SKILMAFILLY, Mintlaw,

HILL OF SKILMAFILLY

NFU: HILL OF SKILMAFILLY Wind Project

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School