Sorry I found no matches, Please try again. 176
vid = 4pws_id = 371357pws_id = 371357 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 216.73.216.231 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Afton Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Afton Wind Farm (Wind , Active)

 General Information.

Location in the UK : Scotland, new cumnock    
Type of installation: Wind    on/offshore: on
Turbines :25  Capacity : 74 MW
Approx Date of 1st power generation: February 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Proposals involve developing a site on land which forms part of the Afton Reservoir catchment area, approximately 8km south of New Cumnock, East Ayrshire.

 Turbine Make and Specs

Model: Gamesa G80 Start Speed: 6
Capacity: 2 Optimal Speed: 13
Rotor Diameter: 80 Stop Speed: 21
Hub Height 70   Avg for all turbines:70 Avg. Elevation: 526
Web Page: http://www.gamesacorp.com/recursos/doc/productos-servicios/aerogeneradores/catalogo-g9x-20-mw-eng.pdf
Comment:

 Address

New Cumnock adjacent to Afton reservoir

 Associated Companies.

Relationship Company (For: Afton )
DeveloperE.on UK
OwnerE.on UK

 DECC Data on this Project: Afton :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Afton Wind Farm     50 MW
Energy Type: Wind Onshore
County: Strathclyde     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 4262 / N00302W     District:
Applicant: InfraRed Capital Partners/ E.on     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 25 Turbine Capacity: 2
Height of Turbines: 120 Calculated capacity: 50
Site Address: To the south west of New Cumnock adjacent to Afton reservoir
 
County: Strathclyde Region: Scotland
OS Coordinates: 262100 / 262100
Development Status: Operational
Application Submitted: 11/3/2004 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 8/16/2016    
Generator Live 2/15/2018 This Record Last Updated: 10/2/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Afton: Wind :

 Calculations


Capacity: 100
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 21 m/s (46.977 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 6/1/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 100 start: 5 Optimum: 15/ Stop: 21 / wind: / ratio 371357

Project Info
Red Rock Power AFTON
AFTON Wind Farm is an operational 50 MW onshore wind development in East Ayrshire, Scotland. The wind farm will power up to 35,000 homes each year and is expected to generate 3.5 million MWh of electricity in its lifetime.

Red Rock on the money at AFTON
Red Rock Power has secured £80m (€91m) from NatWest bank for the 50MW AFTON wind farm in East Ayrshire, Scotland.

InfraRed buys AFTON Wind Farm from E.ON
AFTON Wind Farm, which was developed by E.ON Climate & Renewables, will be a 25 turbine, 50MW onshore wind farm located on land adjacent to AFTON Reservoir near New Cumnock.

Wind farm worker dies after being stranded by heavy snow
The 74-year-old security guard and a 42-year-old colleague were working on Sunday at AFTON Wind Farm, which is under construction near New Cumnock in East Ayrshire

ShAFTON
The ShAFTON turbine is located on the former ShAFTON Two-Gates Coking site which lies between the villages of Grimethorpe and Cudworth.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School