Loading
Page views this IP this session = 1 of 10 unsubscribed pagesHigh Pow Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
High Pow Wind Farm (Wind , Active) Location in the UK : England, Cumbria Type of installation: Wind on/offshore: on Turbines :3 Capacity : 3.9 MW Approx Date of 1st power generation: March 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
Nordex N60/1300
|
Start Speed: |
4.5
|
Capacity: |
1.3
|
Optimal Speed: |
10
|
Rotor Diameter: |
60
|
Stop Speed: |
25
|
Hub Height |
0 Avg for all turbines:0
|
Avg. Elevation: |
140
|
Web Page: |
http://www.nordex-online.com/fileadmin/MEDIA/Produktinfos/EN/Nordex_N60_EN.pdf |
Comment: |
|
High Pow - A (13/03/07 )High Pow Bolton Low Houses Wigton Cumbria CA7 8NH England
Relationship |
Company (For:
High Pow
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
High Pow Extension 16 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Allerdale Borough Council
|
Site ID and Reference: |
3324 / B0067
District:
|
Applicant: |
REG Windpower
Application :
2/2013/0519
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
8 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
16 |
Site Address: |
Percy Hill, Boltongate, Wigton, Cumbria
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
324221 / 324221
|
Development Status: |
Planning Application Withdrawn
|
Application Submitted: |
7/12/2013
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
12/24/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
12/23/2013 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
High Pow Farm 3.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Allerdale Borough Council
|
Site ID and Reference: |
4029 / N00276W
District:
|
Applicant: |
REG Windpower (previously Cornwall Light and Power)
Application :
2/2004/0944
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
3.9 |
Site Address: |
High Pow Farm, Boltons Low Houses, Nr. Wigton,
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
323500 / 323500
|
Development Status: |
Operational
|
Application Submitted: |
7/16/2004
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
10/7/2004
|
Construction Date: |
|
|
|
Generator Live |
3/15/2007
|
This Record Last Updated: |
7/4/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
10/7/2004 |
Site Name: |
High Pow Farm 3.9 MW
|
Energy Type: |
Wind Onshore |
County: |
Cumbria Country: England LPA: Allerdale Borough Council
|
Site ID and Reference: |
3087 / N00002W
District:
|
Applicant: |
Private Developer
Application :
2/03/1023
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
3.9 |
Site Address: |
High Pow Farm, Boltons Low Houses, Nr. Wigton
|
|
|
County: |
Cumbria Region: North West
|
OS Coordinates: |
323550 / 323550
|
Development Status: |
Revised
|
Application Submitted: |
9/4/2003
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
1/6/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
10/6/2004 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
High Pow - A
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00179RQEN
|
Capacity: |
3900
|
Status: |
Live
|
Accreditation Date: |
9/4/2003
|
|
|
Commission Date: |
3/1/2007
|
|
|
Applicant: |
REG Windpower Ltd.
|
Applicant Address: |
R E G Holdings Ltd
Edgeborough House
Upper Edgeborough Road
Guildford
GU1 2BJ
England
|
Address: |
High Pow - A (13/03/07)
High PowBolton Low HousesWigtonCumbria
CA7 8NH
England
|
Site Name: |
High Pow - A
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01128NWEN
|
Capacity: |
3900
|
Status: |
Live
|
Accreditation Date: |
9/4/2003
|
|
|
Commission Date: |
3/1/2007
|
|
|
Applicant: |
REG Windpower Ltd.
|
Applicant Address: |
R E G Holdings Ltd
Edgeborough House
Upper Edgeborough Road
Guildford
GU1 2BJ
England
|
Address: |
High Pow - A (13/03/07)
High PowBolton Low HousesWigtonCumbria
CA7 8NH
England
|
|
Assumptions: Capacity: 3900kW 3.9 MW, Thus over the month Capacity * 720 hours per month = 2808 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/02/2018 | | | 564 | 14.46% | Issued | 01/01/2018 | | | 1182 | 30.31% | Issued | 01/12/2017 | | | 853 | 21.87% | Retired | 01/11/2017 | | | 710 | 18.21% | Retired | 01/10/2017 | | | 1214 | 31.13% | Retired | 01/09/2017 | | | 507 | 13.00% | Retired | 01/08/2017 | | | 605 | 15.51% | Retired | 01/07/2017 | | | 565 | 14.49% | Issued | 01/06/2017 | | | 792 | 20.31% | Retired | 01/05/2017 | | | 620 | 15.90% | Issued | 01/04/2017 | | | 559 | 14.33% | Issued | 01/03/2017 | | | 897 | 23.00% | Issued | 01/02/2017 | | | 991 | 25.41% | Issued | 01/01/2017 | | | 686 | 17.59% | Issued | Dec-16 | 0 | 1019 | 1019 | 26.13% | Pending Tr | Nov-16 | 0 | 458 | 463 | 11.87% | Pending Tr | Oct-16 | 0 | 318 | 323 | 8.28% | Pending Tr | Sep-16 | 0 | 568 | 571 | 14.64% | Pending Tr | Aug-16 | 0 | 685 | 688 | 17.64% | Pending Tr | Jul-16 | 0 | 531 | 534 | 13.69% | Pending Tr | Jul-16 | 0 | 531 | 534 | 13.69% | Pending Tr | Jun-16 | 0 | 255 | 261 | 6.69% | Pending Tr | May-16 | 0 | 606 | 609 | 15.62% | Pending Tr | Apr-16 | 0 | 517 | 522 | 13.38% | Pending Tr | Feb-16 | 0 | 935 | 935 | 23.97% | Redeemed | Nov-15 | 0 | 1014 | 1021 | 26.18% | Redeemed | Oct-15 | 0 | 404 | 406 | 10.41% | Redeemed | Sep-15 | 0 | 248 | 254 | 6.51% | Redeemed | Aug-15 | 0 | 542 | 545 | 13.97% | Redeemed | Jul-15 | 535 | 531 | 29 | 0.74% | Redeemed | Jun-15 | 585 | 581 | 585 | 15.00% | Redeemed | May-15 | 1046 | 1046 | 1046 | 26.82% | Redeemed | Apr-15 | 603 | 603 | 603 | 15.46% | Redeemed | Mar-15 | 1180 | 1180 | 1180 | 30.26% | Redeemed | Feb-15 | 792 | 792 | 792 | 20.31% | Redeemed | Jan-15 | 1388 | 1389 | 1389 | 35.62% | Expired | Dec-14 | 1243 | 1243 | 44 | 1.13% | Redeemed | Nov-14 | 564 | 564 | 564 | 14.46% | Redeemed | Oct-14 | 1061 | 1061 | 1061 | 27.21% | Redeemed | Sep-14 | 201 | 196 | 201 | 5.15% | Redeemed | Aug-14 | 692 | 692 | 84 | 2.15% | Redeemed | Jul-14 | 357 | 352 | 357 | 9.15% | Redeemed | Jun-14 | 159 | 151 | 158 | 4.05% | Redeemed | May-14 | 552 | 548 | 553 | 14.18% | Redeemed | Apr-14 | 697 | 697 | 697 | 17.87% | Redeemed | Mar-14 | 1153 | 1153 | 296 | 7.59% | Revoked | Feb-14 | 1450 | 1449 | 1449 | 37.15% | Redeemed | Jan-14 | 1148 | 1149 | 1148 | 29.44% | Redeemed | Dec-13 | 1381 | 1381 | 1 | 0.03% | Redeemed | Nov-13 | 680 | 680 | 1 | 0.03% | Expired | Oct-13 | 956 | 956 | 955 | 24.49% | Expired | Sep-13 | 554 | 552 | 555 | 14.23% | Redeemed | Aug-13 | 561 | 560 | 560 | 14.36% | Redeemed | Jul-13 | 286 | 286 | 292 | 7.49% | Redeemed | Jun-13 | 335 | 335 | 339 | 8.69% | Redeemed | May-13 | 742 | 745 | 745 | 19.10% | Redeemed | Apr-13 | 1003 | 1004 | 1004 | 25.74% | Redeemed | Mar-13 | 732 | 734 | 335 | 8.59% | Expired | Feb-13 | 529 | 530 | 533 | 13.67% | Expired | Jan-13 | 1024 | 1026 | 1026 | 26.31% | Redeemed | Dec-12 | 929 | 932 | 932 | 23.90% | Redeemed | Nov-12 | 842 | 843 | 843 | 21.62% | Redeemed | Oct-12 | 453 | 453 | 456 | 11.69% | Redeemed | Sep-12 | 873 | 874 | 874 | 22.41% | Redeemed | Aug-12 | 454 | 454 | 457 | 11.72% | Redeemed | Jul-12 | 489 | 489 | 492 | 12.62% | Redeemed | Jun-12 | 516 | 517 | 520 | 13.33% | Redeemed | May-12 | 478 | 478 | 481 | 12.33% | Redeemed | Apr-12 | 559 | 562 | 562 | 14.41% | Expired | Mar-12 | 608 | 611 | 611 | 15.67% | Redeemed | Feb-12 | 859 | 861 | 861 | 22.08% | Redeemed | Jan-12 | 1153 | 1155 | 883 | 22.64% | Redeemed | Dec-11 | 1465 | 1467 | 1467 | 37.62% | Redeemed | Nov-11 | 1096 | 1098 | 1098 | 28.15% | Redeemed | Oct-11 | 1116 | 1119 | 1119 | 28.69% | Redeemed | Sep-11 | 813 | 816 | 816 | 20.92% | Redeemed | Aug-11 | 403 | 403 | 406 | 10.41% | Redeemed | Jul-11 | 204 | 204 | 206 | 5.28% | Redeemed | Jun-11 | 453 | 456 | 18 | 0.46% | Revoked | May-11 | 1147 | 1150 | 45 | 1.15% | Revoked | Apr-11 | 760 | 762 | 30 | 0.77% | Revoked | Mar-11 | 552 | 554 | 554 | 14.21% | Redeemed | Feb-11 | 826 | 829 | 829 | 21.26% | Redeemed | Jan-11 | 745 | 745 | 754 | 19.33% | Redeemed | Dec-10 | 247 | 248 | 248 | 6.36% | Redeemed | Nov-10 | 772 | 773 | 773 | 19.82% | Redeemed |
|
Capacity: 7.8 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/3/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|