Loading
Page views this IP this session = 1 of 10 unsubscribed pagesTriton Knoll Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Triton Knoll Wind Farm (Wind , Agreed/Planning) Location in the UK : England, Skegness Type of installation: Wind on/offshore: off Turbines :90 Capacity : 860 MW Approx Date of 1st power generation: 2021
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
DEBUG comment: caniedit 1 = public DEBUG comment: caniedit 2 = public DEBUG comment SQL: select * from [energymaplocs].[dbo].vmycomment where main_id=408 and typeofcomment <> 'delete' and ( added_by = 0 or typeofcomment = 'public' ) The company npower renewables wants to build this giant 1,200MW offshore wind farm in the Greater Wash, off the east coast of England. When completed, it would claim the London Array projects title of the biggest offshore wind farm in the world
DEBUG generator SQL: select * from [energymaplocs].[dbo].technology where tech_id=201
Model: |
Vestas V164-9.5MW
|
Start Speed: |
0
|
Capacity: |
9.5
|
Optimal Speed: |
0
|
Rotor Diameter: |
164
|
Stop Speed: |
0
|
Hub Height |
0 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
https://en.wind-turbine-models.com/turbines/1605-mhi-vestas-offshore-v164-9.5-mw |
Comment: |
|
Relationship |
Company (For:
Triton Knoll
) |
DBUG:SQL Command = select top 40 * from energymaplocs.dbo.vco_proj_type where cp_project = 408 order by c_compname asc
Owner | RWE Innogy | Developer | RWE Innogy |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
got here Got here pop 2 projectid = 408 vdeccref = DEBUG decclib sql = select *, [Installed Capacity (Elec)] as installed_capacity, [Contractor (/Applicant)] as contractor from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'DECC' and dop_project = '408' order by [planning application submitted] desc
Site Name: |
Triton Knoll 857 MW
|
Energy Type: |
Wind Offshore |
County: |
Offshore Country: England LPA: The Planning Inspectorate - National Infrastructure
|
Site ID and Reference: |
2532 / N00551W
District:
|
Applicant: |
Innogy
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
90 |
Turbine Capacity: |
9.5 |
Height of Turbines: |
187 |
Calculated capacity: |
855 |
Site Address: |
Greater Wash region, approximately 33km off the Lincolnshire coast
|
|
|
County: |
Offshore Region: Offshore
|
OS Coordinates: |
591183 / 591183
|
Development Status: |
Operational
|
Application Submitted: |
2/24/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
9/10/2018
|
|
|
Generator Live |
1/13/2022
|
This Record Last Updated: |
3/2/2022
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
DEBUG Ofgemlib sql = select * from energymaplocs.dbo.vdeccofgem_project where dop_deccorofgem = 'OFGEM' and dop_project = '408' order by CommissionDate desc
Project Info |
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Triton Knoll%' and type_id=2 or (type_id=6 and project_id = 408 ) order by dated desc' ViewEdit = 1 DocTypeID = 9 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%Triton Knoll%' and type_id=2 or (type_id=6 and project_id = 408 ) order by dated descTriton Knol
Diss firm takes leading role in huge offshore wind farm project The area of seabed which the firm is surveying for innology’s TRITON KNOLL windfarm is 32km – almost 20 miles – off the Lincolnshire coast.
UK awards 3.2GW offshore Innogy and Statkraft have also secured support with the 860MW TRITON KNOLL off Lincolnshire, which will come online in 2021-22 at £74.75/MWh.
grid connect study
Npower
|
|
©2018
Simon Mallett |
Latest News Added |
DBUG:SQL Command = 'select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated desc' ViewEdit = 1 DocTypeID = 2 SubjectTypeID = -1 -- select top 5 * from [energymaplocs].[dbo].hr_doc_indexes where title+summary like '%%' and type_id=2 order by dated descLarport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|