Fields Farm Solar Farm

Fields Farm Solar Farm (Solar , Active)

 General Information.

Location in the UK : England, SY13 4RB    
Type of installation: Solar    on/offshore: on
Solar Panels :0  Capacity : 5 MW
Approx Date of 1st power generation: February 2017

/YES

 Comment

Lightsource Renewable Energy Planning Permission Grant

 Address

Fields Farm, Agden Near Whitchurch

 Associated Companies.

Relationship Company (For: Fields Farm )
DeveloperLightsource Renewable Energy Limited

 DECC Data on this Project: Fields Farm :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Fields Farm (Agden)     5 MW
Energy Type: Solar Photovoltaics
County: Cheshire     Country: England     LPA: Cheshire West and Chester Council
Site ID and Reference: 5529 /     District:
Applicant: Lightsource Renewable Energy     Application : 15/03109/FUL (Go to search to find Application)
--- For Solar Farms / Parks ---
Mounting of panels: Ground
--- ----- ---- ---
Site Address: Fields Farm, Agden Near Whitchurch
  SY13 4RB
County: Cheshire Region: North West
OS Coordinates: 351447 / 351447
Development Status: Operational
Application Submitted: 7/23/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/9/2016    
Generator Live 2/9/2017 This Record Last Updated: 5/26/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 2/10/2019    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Fields Farm: Solar :

Site Name: Fields Farm PV
Generator Type: Photovoltaic
Scheme : REGO Generator ID: G07828PVEN
Capacity: 3500 Status: Live
Accreditation Date: 7/23/2015    
Commission Date: 2/9/2017    
Applicant: Lightsource SPV34 Limited
Applicant Address: 7th Floor 33 Holborn London EC1N 2HU England
Address: Fields Farm Agden Whitchurch SY13 4RB England
 
Assumptions: Capacity: 3500kW 3.5 MW,
Thus over the month Capacity * 720 hours per month = 2520 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 456 13.03% Issued
01/12/2017 84 2.40% Issued
01/11/2017 158 4.51% Issued
01/10/2017 259 7.40% Issued
01/09/2017 413 11.80% Issued
01/08/2017 532 15.20% Issued
01/07/2017 657 18.77% Issued
01/06/2017 551 15.74% Issued
01/05/2017 660 18.86% Issued
01/04/2017 558 15.94% Issued
01/03/2017 417 11.91% Redeemed
01/02/2017 90 2.57% Issued

Project Info
The Gawcott Fields community solar project
A new community solar farm has been built at Gawcott FIELDS FARM, between Buckingham and Gawcott. The 4.17 megawatt solar array is made up of over 16,000 solar panels and is expected to generate over 4 million kWh of renewable electricity

Two companies submit plans for new solar farms
A 9MW plant has been proposed for Gawcott FIELDS FARM by Harper Solar while Quainton-based Haymaker Energy has resubmitted plans for a 12MW farm Mount Mill in Wicken.

Solar farm plans in pipeline for Southam
TGC Renewables Ltd wants permission to build on land at FIELDS FARM on Station Road in Southam.

Lightsource proposed solar farm at FIELDS FARM (Agden)

GAWCOTT FIELDS FARM SOLAR PARK – ARCHAEOLOGY
A 9.18-MW solar park comprising photovoltaic panels, centralised inverter and transformer housings, switch gear buildings and associated cabling was proposed on a 25-ha former agricultural site, Gawcott FIELDS FARM, near Buckingham.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School