Sorry I found no matches, Please try again. 176
vid = 414pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.16.50.1 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Galloper Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Galloper Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, P16 4TT    
Type of installation: Wind    on/offshore: off
Turbines :56  Capacity : 336 MW
Approx Date of 1st power generation: April 2018

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

SSE (Scottish and Southern Energy plc) and RWE npower renewables have today (Nov 2010) secured rights from The Crown Estate to develop a new wind farm off the coast of Suffolk. The proposed wind farm has a capacity of around 500MW and is close to the companies’ existing Greater Gabbard offshore wind farm, currently the world’s largest wind farm under construction

 Turbine Make and Specs

Model: Siemens SWT 6 - 154 Start Speed: 5
Capacity: 6 Optimal Speed: 15
Rotor Diameter: 154 Stop Speed: 25
Hub Height 103   Avg for all turbines:103 Avg. Elevation: 0
Web Page: http://www.siemens.co.uk/en/news_press/index/news_archive/siemens-6-megawatt-wind-turbine.htm
Comment:

 Address

Galloper Onshore Sub-Station Sizewell LeistonI P16 4TT England

 Associated Companies.

Relationship Company (For: Galloper )
DeveloperRWE Innogy
DeveloperScottish and Southern Energy

 DECC Data on this Project: Galloper :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Galloper Wind Farm     353 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: The Planning Inspectorate - National Infrastructure
Site ID and Reference: 2526 / A0370     District:
Applicant: RWE Npower Renewables     Application : EN010003 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 56 Turbine Capacity: 6.2999999999999998
Height of Turbines: Calculated capacity: 352.8
Site Address: 30 km from Suffolk coastline, South East Of Sizewell And Aldeburgh
 
County: Offshore Region: Offshore
OS Coordinates: 678139 / 678139
Development Status: Operational
Application Submitted: 11/21/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 7/29/2016    
Generator Live 3/30/2018 This Record Last Updated: 10/2/2019
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Galloper: Wind :

Site Name: Galloper Wind Farm
Generator Type: Off-shore wind (RO code = RP)
Scheme : RO Generator ID: R00031RPEN
Capacity: 349272 Status: Live
Accreditation Date: 11/21/2011    
Commission Date: 11/5/2017    
Applicant: Galloper Wind Farm Limited
Applicant Address: Windmill Hill Business Park Whitehill Way Swindon SN5 6PB England
Address: Galloper Wind Farm Limited Onshore Sub-Station Sizewell Gap Road Sizewell IP16 4TS England

Site Name: Galloper Wind Farm
Generator Type: Off-shore wind (REGO code = FW)
Scheme : REGO Generator ID: G01180FWEN
Capacity: 349272 Status: Live
Accreditation Date: 11/21/2011    
Commission Date: 11/5/2017    
Applicant: Galloper Wind Farm Limited
Applicant Address: Windmill Hill Business Park Whitehill Way Swindon SN5 6PB England
Address: Galloper Wind Farm Limited Onshore Sub-Station Sizewell Gap Road Sizewell IP16 4TS England
 
Assumptions: Capacity: 349272kW 349.272 MW,
Thus over the month Capacity * 720 hours per month = 251475.84 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 96479 27.62% Issued
01/02/2018 45701 13.08% Issued
01/02/2018 15233 4.36% Issued
01/01/2018 11520 3.30% Issued
01/01/2018 34562 9.90% Issued
01/12/2017 3771 1.08% Issued
01/12/2017 11315 3.24% Issued
01/11/2017 9032 2.59% Issued
01/11/2017 3010 0.86% Issued

 Calculations


Capacity: 672
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/27/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 672 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
GALLOPER offshore wind farm with 353MW capacity becomes fully operational
Construction of the £1.5bn wind farm began in November 2016. Full power generation was achieved on 29 March, as Siemens Gamesa’s last turbine was switched on.

Blow me! GALLOPER wind farm off East Anglian coast hits full throttle
A £1.5bn wind farm off the coast of East Anglia has hit full throttle, just eighteen months after construction began.

Final turbine installed at GALLOPER offshore wind farm off East Anglian coast
All 56 have now been fitted on the 353MW project, which generated power for the first time on November 5, though the construction will not be completed until May 2018.

Final phase of GALLOPER construction
The final phase of GALLOPER construction work at Sizewell beach is about to get underway. From Monday the 13th March 2017 a construction area will be re-established at Sizewell beach, Suffolk.

SSE & RWE GALLOPER

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School