Loading
Page views this IP this session = 1 of 10 unsubscribed pagesDinorwig
Dinorwig (Hydro , Active) Location in the UK : Wales, North Wales, Snowdonia, llanberis Type of installation: Hydro on/offshore: on Turbines :4 Capacity : 1726 MW Approx Date of 1st power generation: 1984
/YES
"Dinorwic" POWER STATION: pumped Storage Scheme When it was fully commissioned in 1984, Dinorwig Power Station was regarded as one of the world's most imaginative engineering and environmental project. The original purpose of the scheme, it is claimed, was to deal with the difficulty that National Grid would have had if the large numbers of nuclear power stations then planned had been built. These are technically and economically inflexible, ideally needing to run at full output all of the time and, effectively, storage capacity was needed for some of the night-time power when the demand for power dropped off. Electric night storage heaters and the Economy 7 tariff fulfill a similar purpose.[1]
Relationship |
Company (For:
Dinorwig
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Dinorwig 1728 MW
|
Energy Type: |
Pumped Storage Hydroelectricity |
County: |
Conwy Country: Wales LPA: Snowdonia National Park Authority
|
Site ID and Reference: |
6839 /
District:
|
Applicant: |
First Hydro Company
Application :
|
(Go to search to find Application) |
Site Address: |
Snowdonia
|
|
LL55 4TY
|
County: |
Conwy Region: Wales
|
OS Coordinates: |
258627 / 258627
|
Development Status: |
Operational
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/1/1978
|
|
|
Generator Live |
1/1/1983
|
This Record Last Updated: |
10/23/2018
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|