Sorry I found no matches, Please try again. 176
vid = 4346pws_id = 351838pws_id = 351838
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.133.128.171 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Limes Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Limes Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, HU12 8TH    
Type of installation: Wind    on/offshore: on
Turbines :2  Capacity : 1.7 MW
Approx Date of 1st power generation: January 2015

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Countryside Solutions Operational
Single turbine 67 metres to tip

 Turbine Make and Specs

Model: Gamesa G58 Start Speed: 6
Capacity: 0.85 Optimal Speed: 13
Rotor Diameter: 58 Stop Speed: 24
Hub Height 55   Avg for all turbines:0 Avg. Elevation: 3
Web Page: http://www.gamesacorp.com/en/products-and-services/gamesa-g58-850-kw-en.html
Comment:

 Address

The Limes Staithes Road Preston HU12 8TH England

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Limes )

 DECC Data on this Project: Limes :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: The Limes Wind Turbines     1.7 MW
Energy Type: Wind Onshore
County: Humberside     Country: England     LPA: East Riding of Yorkshire Council
Site ID and Reference: 3807 / AA389     District:
Applicant: Broadview Energy     Application : 11/01980/STPLFE (Go to search to find Application)
For Wind Farms  
Number of Turbines: 2 Turbine Capacity: 0.84999999999999998
Height of Turbines: Calculated capacity: 1.7
Site Address: to the west of Staithes Road at Salt End, Hull.
 
County: Humberside Region: Yorkshire and Humber
OS Coordinates: 516489 / 516489
Development Status: Operational
Application Submitted: 5/9/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/12/2014    
Generator Live 1/15/2015 This Record Last Updated: 7/3/2018
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Limes: Wind :

Site Name: Limes
Generator Type: Wind
Scheme : REGO Generator ID: G02631NWEN
Capacity: 1499 Status: Live
Accreditation Date: 5/9/2011    
Commission Date: 11/28/2014    
Applicant: Maryland Renewables Ltd
Applicant Address: First Floor 14 City Road London EC1Y 2AA England
Address: The Limes Staithes Road Preston HU12 8TH England
 
Assumptions: Capacity: 1499kW 1.499 MW,
Thus over the month Capacity * 720 hours per month = 1079.28 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
28 1.87% Issued
240 16.01% Issued
Mar-16 00 268 17.88% Redeemed
Feb-16 00 399 26.62% Redeemed
Jan-16 00 424 28.29% Redeemed
Dec-15 00 230 15.34% Redeemed
Nov-15 00 482 32.15% Redeemed
Oct-15 00 199 13.28% Redeemed
Sep-15 00 147 9.81% Redeemed
Aug-15 00 227 15.14% Redeemed
Jul-15 1830 182 12.14% Redeemed
Jun-15 2160 1 0.07% Redeemed
May-15 3480 347 23.15% Redeemed
Apr-15 2170 217 14.48% Redeemed
Mar-15 4030 403 26.88% Redeemed
Feb-15 2970 297 19.81% Redeemed
Jan-15 4460 447 29.82% Redeemed
Dec-14 3480 348 23.22% Redeemed
232 15.48% Issued
380 25.35% Issued
207 13.81% Issued
443 29.55% Issued
353 23.55% Issued
235 15.68% Issued
400 26.68% Issued
434 28.95% Issued
286 19.08% Issued
327 21.81% Issued

 Calculations


Capacity: 1.7
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 0 m/s (0 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/23/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 1.7 start: 5 Optimum: 15/ Stop: 0 / wind: / ratio 351838

Project Info
Proposed Wind Turbines on Staithes Road, Saltend

Bourne solar farm is connected to National Grid
A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid. LIMES Farm in Spalding Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Bourne solar farm is connected to National Grid
LIMES Farm in Spalding Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

Bourne solar farm is connected to National Grid
A solar farm capable of powering hundreds of homes has been completed and connected to the National Grid.LIMES Farm in Spalding Road, Bourne, is now one of the largest solar farms in the country, with 20,000 5.6MWp solar panels across 30 acres.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School