Loading
Page views this IP this session = 1 of 5 unsubscribed pagesAdvanced Manufacturing Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Advanced Manufacturing Wind Farm (Wind , Active) Location in the UK : England, S605TZ Type of installation: Wind on/offshore: on Turbines :42 Capacity : 2.6 MW Approx Date of 1st power generation: January 2009
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Two wind turbines on South Yorkshire’s Advanced Manufacturing Park are to be demolished after being mothballed for around two years, because the blades fell off one of them.
The new turbine will be capable of generating around 850kW, compared with the 220kW rating of each of the twin turbines.
Model: |
Powerwind 56
|
Start Speed: |
0
|
Capacity: |
1.3
|
Optimal Speed: |
0
|
Rotor Diameter: |
0
|
Stop Speed: |
0
|
Hub Height |
71 Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
|
Comment: |
|
AMRC Advanced Manufacturing Park Catcliffe Rotherham S605TZ England
Relationship |
Company (For:
Advanced Manufacturing
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Advanced Manufacturing Research Centre 2.6 MW
|
Energy Type: |
Wind Onshore |
County: |
South Yorkshire Country: England LPA: Rotherham Metropolitan Borough Council
|
Site ID and Reference: |
3028 / EN00424
District:
|
Applicant: |
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
2 |
Turbine Capacity: |
1.3 |
Height of Turbines: |
|
Calculated capacity: |
2.6 |
Site Address: |
Advanced Manufacturing Park
Wallis Way
Catcliffe
Rotherham
S60 5TZ
|
|
|
County: |
South Yorkshire Region: Yorkshire and Humber
|
OS Coordinates: |
441475 / 441475
|
Development Status: |
Operational
|
Application Submitted: |
1/1/2007
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
1/20/2009
|
This Record Last Updated: |
7/28/2009
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
AMRC
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00220RQEN
|
Capacity: |
500
|
Status: |
Live
|
Accreditation Date: |
1/1/2007
|
|
|
Commission Date: |
1/20/2009
|
|
|
Applicant: |
University of Sheffield
|
Applicant Address: |
Wallis Way
Catcliffe
Rotherham
S60 5TZ
England
|
Address: |
AMRC
Advanced Manufacturing Park
Catcliffe
Rotherham
S605TZ
England
|
Capacity: 1 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 12/26/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|