Sorry I found no matches, Please try again. 176
vid = 44pws_id = 352833pws_id = 352833
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.145.58.141 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Bessy Bell Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Bessy Bell Wind Farm (Wind , Active)

 General Information.

Location in the UK : N.Ireland, Co Tyrone    
Type of installation: Wind    on/offshore: on
Turbines :16  Capacity : 14 MW
Approx Date of 1st power generation: April 2008

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

(Barons Court) Constructed by RES Ltd. for PowerGen Ltd., Bessy Bell began generating power in June 1995 - making it one of the first commercial wind farms in Northern Ireland.

Bessy Bell wind farm is located on Bessy Bell mountain, part of the Baronscourt Estate. The development is situated at 320 m. above sea-level on a hillside adjacent to forestry land. It consists of ten 500kW turbines capable of an output of five megawatts, enough electricity to supply the needs of approximately 5-6,000 homes.

 Turbine Make and Specs

Model: GE 1.5 - 77 Start Speed: 4
Capacity: 1.5 Optimal Speed: 15
Rotor Diameter: 77 Stop Speed: 25
Hub Height 60   Avg for all turbines:47 Avg. Elevation: 315
Web Page: http://tinyurl.com/mj649ee
Comment: GEs Class I 1.5-77 wind turbine. GE advanced its original Class I wind turbine, the 1.5-70.5, with increased rotor length, and controls technology resulting in a greater annual energy production.

 Address

Bessy Bell Mountain Baronscourt Estate Newtownstewart, County Tyrone

 Associated Companies.

Relationship Company (For: Bessy Bell )
DeveloperRES Renewable Energy Systems Ltd
OperatorScottish and Southern Energy
OwnerScottish and Southern Energy
DeveloperScottish and Southern Energy

 DECC Data on this Project: Bessy Bell :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Bessy Bell 2 Extension     9 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 4725 /     District:
Applicant: Scottish and Southern Energy (SSE)     Application : K/2013/0145/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 4 Turbine Capacity: 2.2999999999999998
Height of Turbines: 115 Calculated capacity: 9.2
Site Address: Drumlegagh Roadd crossing, South of Baronscourt Road junction, Omagh
  BT78 5R
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 52695 / 52695
Development Status: Planning Permission Expired
Application Submitted: 4/15/2013 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 6/4/2020
RO Banding (ROC/MWh) 0.9 FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 10/6/2014
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Bessy Bell 3 Wind Farm     25 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 3326 / B1043     District:
Applicant: Scottish and Southern Energy (SSE)     Application : J/2013/0080/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 23
Site Address: Bessy Bell Mountain Baronscourt Estate Newtownstewart, County Tyrone
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 49687 / 49687
Development Status: Appeal Refused
Application Submitted: 3/28/2013 Planning Permission Granted
Application Determined: Permission refused: 5/16/2016
Construction Date:    
Generator Live This Record Last Updated: 5/27/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 2/1/2014
Called In: Appeal Withdrawn:
Refusal: Appeal Refused: 5/16/2016
Granted: Appeal Granted: 5/16/2016

Site Name: Bessy Bell Extension     9 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 3168 / N00144W     District:
Applicant: Bessy Bell Windfarm     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 6 Turbine Capacity: 1.3
Height of Turbines: Calculated capacity: 7.8
Site Address: Bessy Bell Moutain , 5km south of Newtownstewart, 17km south of Strabane and 9km northwest of Omagh
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 50592 / 50592
Development Status: Operational
Application Submitted: 6/3/2003 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 4/24/2008 This Record Last Updated: 8/2/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Bessy Bell Wind Farm     5 MW
Energy Type: Wind Onshore
County: Co. Tyrone     Country: Northern Ireland     LPA: Northern Ireland Planning Service
Site ID and Reference: 3097 / N0001W1     District:
Applicant: Colham Energy Ltd, plus Airtricty extrension     Application : K/2006/1678/F (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 0.5
Height of Turbines: Calculated capacity: 5
Site Address: Bessy Bell Mountain Baronscourt Estate Newtownstewart, County Tyrone
 
County: Co. Tyrone Region: Northern Ireland
OS Coordinates: 49687 / 49687
Development Status: Operational
Application Submitted: 6/21/1994 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live 10/1/1995 This Record Last Updated: 2/23/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Bessy Bell: Wind :

 Calculations


Capacity: 25.6
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/26/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 25.6 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 352833

Project Info
150 wind turbines approved 10:46Thursday 05 August 2010
eight approved farms at separate sites at BESSY BELL, Owenreagh, Bin Mt., Lough Hill, Crighshane, Churchill, Carrickatane and Tievenameenta potentially generating 150.6MW. Only in Omagh have more farms been approved.

RES: BESSY BELL

E.ON UK Renewables

BESSY BELL Wind Farm: Geograph image

Airtricity presents £25,000 to local community projects
This year, Airtricity has made grant awards to a total 30 community based projects within 10km of their wind farms at Tappaghan near Lack in Co. Fermanagh, at Bin Mountain near Castlederg and at BESSY BELL near Mountjoy, Omagh, in Co. Tyrone.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School