Loading
Page views this IP this session = 1 of 10 unsubscribed pagesMynydd Brombil Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Mynydd Brombil Wind Farm (Wind , Active) Location in the UK : Wales, Port Talbot Type of installation: Wind on/offshore: on Turbines :4 Capacity : 8 MW Approx Date of 1st power generation: January 2017
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
REG Windpower Under Construction
Model: |
Gamesa G80
|
Start Speed: |
6
|
Capacity: |
2
|
Optimal Speed: |
13
|
Rotor Diameter: |
80
|
Stop Speed: |
21
|
Hub Height |
60 Avg for all turbines:60
|
Avg. Elevation: |
225
|
Web Page: |
http://www.gamesacorp.com/recursos/doc/productos-servicios/aerogeneradores/catalogo-g9x-20-mw-eng.pdf |
Comment: |
|
Mynydd Brombil Brombil Farm Margam SA13 2SR Wales
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Mynydd Brombil Wind Farm 8 MW
|
Energy Type: |
Wind Onshore |
County: |
Neath Port Talbot Country: Wales LPA: Neath Port Talbot Council
|
Site ID and Reference: |
4193 / B0328
District:
|
Applicant: |
REG Windpower
Application :
P2012/0638
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
4 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
8 |
Site Address: |
Brombil, Port Talbot
|
|
|
County: |
Neath Port Talbot Region: Wales
|
OS Coordinates: |
279141 / 279141
|
Development Status: |
Operational
|
Application Submitted: |
8/29/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
2/1/2016
|
|
|
Generator Live |
1/15/2017
|
This Record Last Updated: |
4/18/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
7/8/2020 |
|
|
Secretary of State - |
Appeal Lodged: |
1/7/2015 |
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
Mynydd Brombil Wind Farm
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00211RQWA
|
Capacity: |
8000
|
Status: |
Live
|
Accreditation Date: |
8/29/2012
|
|
|
Commission Date: |
1/16/2017
|
|
|
Applicant: |
REG Windpower Ltd.
|
Applicant Address: |
R E G Holdings Ltd
Edgeborough House
Upper Edgeborough Road
Guildford
GU1 2BJ
England
|
Address: |
Mynydd Brombil Wind Farm
Land at Mynydd Brombil
Brombil Farm
Margam
SA13 2SR
Wales
|
Site Name: |
Mynydd Brombil Wind Farm
|
Generator Type: |
Wind
|
Scheme : |
REGO
|
Generator ID: |
G01634NWWA
|
Capacity: |
8000
|
Status: |
Live
|
Accreditation Date: |
8/29/2012
|
|
|
Commission Date: |
1/16/2017
|
|
|
Applicant: |
REG Windpower Ltd.
|
Applicant Address: |
R E G Holdings Ltd
Edgeborough House
Upper Edgeborough Road
Guildford
GU1 2BJ
England
|
Address: |
Mynydd Brombil Wind Farm
Land at Mynydd Brombil
Brombil Farm
Margam
SA13 2SR
Wales
|
|
Assumptions: Capacity: 8000kW 8 MW, Thus over the month Capacity * 720 hours per month = 5760 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
01/04/2018 | | | 1904 | 23.80% | Issued | 01/03/2018 | | | 2146 | 26.83% | Issued | 01/02/2018 | | | 2054 | 25.68% | Issued | 01/01/2018 | | | 3139 | 39.24% | Issued | 01/12/2017 | | | 2419 | 30.24% | Issued | 01/11/2017 | | | 1855 | 23.19% | Issued | 01/10/2017 | | | 2453 | 30.66% | Issued | 01/09/2017 | | | 1785 | 22.31% | Issued | 01/08/2017 | | | 1491 | 18.64% | Issued | 01/07/2017 | | | 1342 | 16.78% | Issued | 01/06/2017 | | | 1662 | 20.78% | Issued | 01/05/2017 | | | 1562 | 19.53% | Issued | 01/04/2017 | | | 992 | 12.40% | Issued | 01/03/2017 | | | 2537 | 31.71% | Issued | 01/02/2017 | | | 2400 | 30.00% | Issued | 01/01/2017 | | | 630 | 7.88% | Issued |
|
Capacity: 16 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 21 m/s (46.977 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 1/15/2025 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|