Sorry I found no matches, Please try again. 176
vid = 444pws_id = 310228pws_id = 310228
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.188.218.103 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Inner Dowsing Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Inner Dowsing Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, Skegness    
Type of installation: Wind    on/offshore: off
Turbines :30  Capacity : 108 MW
Approx Date of 1st power generation: March 2009

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Part of the Lynn and Inner Dowsing Wind Farm:
Each turbine can power 2,500 homes
Turbines are 100m high and nearly 100m in diameter
Each turbine weighs approximately 260 tonnes
The 54 turbines have a combined generating capacity of 180 MW

 Turbine Make and Specs

Model: Siemens SWT 3.6 107 Start Speed: 4
Capacity: 3.6 Optimal Speed: 13
Rotor Diameter: 107 Stop Speed: 25
Hub Height 80   Avg for all turbines:80 Avg. Elevation:
Web Page: http://www.energy.siemens.com/hq/en/renewable-energy/wind-power/platforms/g4-platform/wind-turbine-swt-3-6-107.htm#content=Technical%20Specification
Comment: The rotor of the SWT-3.6-107 turbine is a three-blade cantilevered construction, mounted upwind of the tower.

 Address

Middlemarsh Substation Middlemarsh Road Skegness PE24 4UD England

 Associated Companies.

Relationship Company (For: Inner Dowsing )
DeveloperAMEC
OwnerCentrica
OperatorCentrica

 DECC Data on this Project: Inner Dowsing :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Inner Dowsing      97.2 MW
Energy Type: Wind Offshore
County: Offshore     Country: England     LPA: DECC (S36)
Site ID and Reference: 2491 / N00562W     District:
Applicant: XceCo     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 27 Turbine Capacity: 3.6000000000000001
Height of Turbines: Calculated capacity: 97.2
Site Address: 5.2km Ingoldmells 
 
County: Offshore Region: Offshore
OS Coordinates: 563561 / 563561
Development Status: Operational
Application Submitted: 9/11/2002 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 3/1/2008    
Generator Live 4/20/2008 This Record Last Updated: 8/24/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Inner Dowsing: Wind :

Site Name: Inner Dowsing Offshore Wind Farm
Generator Type: Off-shore wind (RO code = RP)
Scheme : RO Generator ID: R00011RPEN
Capacity: 90000 Status: Live
Accreditation Date: 9/11/2002    
Commission Date: 4/20/2008    
Applicant: Inner Dowsing Wind Farm Ltd
Applicant Address: C/O Evershed LLP 3 Melville Street Edinburgh EH3 7PE Scotland
Address: Middlemarsh Substation Middlemarsh Road Skegness PE24 4UD England

Site Name: Inner Dowsing Offshore Wind Farm
Generator Type: Off-shore wind (REGO code = FW)
Scheme : REGO Generator ID: G01155FWEN
Capacity: 90000 Status: Live
Accreditation Date: 9/11/2002    
Commission Date: 4/20/2008    
Applicant: Inner Dowsing Wind Farm Ltd
Applicant Address: C/O Evershed LLP 3 Melville Street Edinburgh EH3 7PE Scotland
Address: Middlemarsh Substation Middlemarsh Road Skegness PE24 4UD England
 
Assumptions: Capacity: 90000kW 90 MW,
Thus over the month Capacity * 720 hours per month = 64800 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2018 25145 27.94% Issued
01/03/2018 27325 30.36% Issued
01/02/2018 30531 33.92% Issued
01/01/2018 36711 40.79% Issued
01/12/2017 36105 40.12% Issued
01/11/2017 33922 37.69% Issued
01/10/2017 37439 41.60% Issued
01/09/2017 22667 25.19% Issued
01/08/2017 17872 19.86% Issued
01/07/2017 18796 20.88% Issued
01/06/2017 24068 26.74% Issued
01/05/2017 22957 25.51% Issued
01/04/2017 20807 23.12% Issued
01/03/2017 28423 31.58% Redeemed
01/02/2017 31603 35.11% Redeemed
01/01/2017 24217 26.91% Redeemed
Dec-16 038365 25576 28.42% Pending Tr
Nov-16 037608 25072 27.86% Issued
Oct-16 035512 23675 26.31% Issued
Sep-16 033452 22301 24.78% Issued
Aug-16 032767 21845 24.27% Issued
Jul-16 027405 18270 20.30% Issued
Jul-16 027405 18270 20.30% Pending Tr
Jun-16 020233 13653 15.17% Pending Tr
May-16 034591 23060 25.62% Pending Tr
Apr-16 033021 22014 24.46% Issued
Mar-16 035403 23602 26.22% Redeemed
Feb-16 023279 15520 17.24% Redeemed
Jan-16 037253 24835 27.59% Redeemed
Dec-15 079974 53316 59.24% Redeemed
Nov-15 064285 42857 47.62% Redeemed
Oct-15 030440 20293 22.55% Redeemed
Sep-15 025958 17305 19.23% Redeemed
Aug-15 029404 19603 21.78% Redeemed
Jul-15 1900328504 19003 21.11% Expired
Jun-15 1933028995 19330 21.48% Redeemed
May-15 2714840723 1 0.00% Redeemed
Apr-15 1741926128 17419 19.35% Redeemed
Mar-15 3121746826 31217 34.69% Redeemed
Feb-15 2645339679 26453 29.39% Redeemed
Jan-15 58595 39064 43.40% Redeemed
Dec-14 57861 38574 42.86% Redeemed
Nov-14 2430036450 24300 27.00% Redeemed
Oct-14 54895 36596 40.66% Redeemed
Sep-14 773811489 7738 8.60% Redeemed
Aug-14 2616639249 26166 29.07% Redeemed
Jul-14 1145117049 11451 12.72% Redeemed
May-14 1597823843 15978 17.75% Redeemed
Apr-14 2030230453 20302 22.56% Redeemed
Mar-14 2766641499 27666 30.74% Redeemed
Feb-14 4203663054 42036 46.71% Redeemed
Jan-14 4033060496 40331 44.81% Redeemed
Dec-13 4114161711 41141 45.71% Redeemed
Nov-13 2621539322 26214 29.13% Redeemed
Oct-13 3742256134 37423 41.58% Redeemed
Sep-13 2062330934 20622 22.91% Redeemed
Aug-13 1441721626 14417 16.02% Redeemed
Jul-13 49427358 4942 5.49% Redeemed
Jun-13 1936529048 19365 21.52% Redeemed
May-13 2812042179 28120 31.24% Redeemed
Apr-13 1590923863 15909 17.68% Redeemed
Mar-13 3111746676 31117 34.57% Redeemed
Feb-13 1948429226 19484 21.65% Redeemed
Jan-13 2979744696 29797 33.11% Redeemed
Dec-12 3873858107 38738 43.04% Redeemed
Nov-12 3063045944 30630 34.03% Redeemed
Oct-12 2626539397 26265 29.18% Redeemed
Sep-12 2671840078 26718 29.69% Redeemed
Aug-12 1822527337 18225 20.25% Redeemed
Jul-12 1564523468 15645 17.38% Redeemed
Jun-12 1821127316 18211 20.23% Redeemed
May-12 2548738230 25487 28.32% Redeemed
Apr-12 2552338285 25523 28.36% Redeemed
Mar-12 1758326375 17584 19.54% Redeemed
Feb-12 30904611 3090 3.43% Redeemed
Jan-12 55658348 5565 6.18% Redeemed
Dec-11 4241163616 42411 47.12% Redeemed
Nov-11 2960144402 29601 32.89% Redeemed
Oct-11 3050345754 30502 33.89% Redeemed
Sep-11 2842142631 28421 31.58% Redeemed
Aug-11 1554323314 15543 17.27% Redeemed
Jul-11 2057830867 20578 22.86% Redeemed
Jun-11 1831527474 18316 20.35% Redeemed
May-11 3062245933 30622 34.02% Redeemed
Apr-11 2397335958 23972 26.64% Redeemed
Mar-11 1791826878 17919 19.91% Redeemed
Feb-11 3252748790 32526 36.14% Redeemed
Jan-11 3050545759 30506 33.90% Redeemed
Dec-10 2393635903 23936 26.60% Redeemed
Nov-10 3325849887 33258 36.95% Redeemed

 Calculations


Capacity: 216
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 12/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 216 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 310228

Project Info
Skegness offshore wind farm

Centrica

Lynn and INNER DOWSING

RES Offshore at Seawork
Working for Centrica at Lynn and INNER DOWSING and Lincs Offshore Wind farms for SMartWind, maintaining the Round3 Hornsea Zone Met Mast, for Forewind maintaining both the East and West Round 3 Dogger Bank Zone Met Masts

One of world's largest wind farms is proposed off the coast of Mablethorpe
Renewable energy giant RWE npower is hoping to develop turbines that could provide up to 1,200 megawatts of electricity – more than six times the power provided by the Lynn and INNER DOWSING scheme off the Skegness coast. Turbines for the Triton Kno

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School