River Pattack

River Pattack (Hydro , Active)

 General Information.

Location in the UK : Scotland, Loch Laggan    
Type of installation: Hydro    on/offshore: on
Turbines :0  Capacity : 2 MW
Approx Date of 1st power generation: August 2017

/YES

 Comment

RWE Innogy UK Abandoned

To construct and operate a new hydroelectric scheme (up to 9MW) involving a dam and storage reservoir, up to four minor intakes, buried pipelines, powerhouse building, access track works and temporary site establishment areas for River Pattack Hydro Scheme

 Address

River Pattack Hydro Scheme Ardverikie Estate Kinlochlaggan Newtonmore PH20 1BX Scotland

 Associated Companies.

Relationship Company (For: River Pattack )
DeveloperRWE Innogy

 DECC Data on this Project: River Pattack :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: River Pattack     2 MW
Energy Type: Small Hydro
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 5965 /     District:
Applicant: Gilkes Energy     Application : 15/03858/FUL (Go to search to find Application)
Site Address: Powerhouse Building On The, Shore Of Loch Laggan, Kinloch Laggan, Newtonmore
  PH20 1B
County: Highland Region: Scotland
OS Coordinates: 254876 / 254876
Development Status: Operational
Application Submitted: 10/13/2015 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 1/15/2016    
Generator Live 12/7/2017 This Record Last Updated: 12/19/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: River Pattack Hydro Scheme     9 MW
Energy Type: Large Hydro
County: Highland     Country: Scotland     LPA: Highland Council
Site ID and Reference: 411 / C3207     District:
Applicant: RWE Innogy UK     Application : 14/02344/FUL (Go to search to find Application)
Site Address: Powerhouse Building On The Shore Of Loch Laggan, Kinloch Laggan, Newtonmore
 
County: Highland Region: Scotland
OS Coordinates: 252740 / 252740
Development Status: Revised
Application Submitted: 6/20/2014 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 4/4/2016
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date: 7/28/2018    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: River Pattack: Hydro :

Site Name: River Pattack Hydro Scheme
Generator Type: Hydro
Scheme : REGO Generator ID: G01910HYSC
Capacity: 1995 Status: Live
Accreditation Date: 6/20/2014    
Commission Date: 8/17/2017    
Applicant: Blencathra Hydro
Applicant Address: Gilbert Gilkes & Gordon Ltd Canal Iron Works Canal Head North KENDAL LA9 7BZ England
Address: River Pattack Hydro Scheme Ardverikie Estate Kinlochlaggan Newtonmore PH20 1BX Scotland
 
Assumptions: Capacity: 1995kW 1.995 MW,
Thus over the month Capacity * 720 hours per month = 1436.4 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
1443 72.33% Issued
984 49.32% Issued
714 35.79% Issued
982 49.22% Issued
1245 62.41% Issued
705 35.34% Issued
835 41.85% Issued
816 40.90% Issued

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School