Page views this IP this session = 8 of 10 unsubscribed pagesRiver Pattack
River Pattack (Hydro , Active) Location in the UK : Scotland, Loch Laggan Type of installation: Hydro on/offshore: on Turbines :0 Capacity : 2 MW Approx Date of 1st power generation: August 2017
/YES
RWE Innogy UK Abandoned
To construct and operate a new hydroelectric scheme (up to 9MW) involving a dam and storage reservoir, up to four minor intakes, buried pipelines, powerhouse building, access track works and temporary site establishment areas for River Pattack Hydro Scheme River Pattack Hydro Scheme Ardverikie Estate Kinlochlaggan Newtonmore PH20 1BX Scotland
Relationship |
Company (For:
River Pattack
) |
Developer | RWE Innogy |
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
River Pattack 2 MW
|
Energy Type: |
Small Hydro |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
5965 /
District:
|
Applicant: |
Gilkes Energy
Application :
15/03858/FUL
|
(Go to search to find Application) |
Site Address: |
Powerhouse Building On The, Shore Of Loch Laggan, Kinloch Laggan, Newtonmore
|
|
PH20 1B
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
254876 / 254876
|
Development Status: |
Operational
|
Application Submitted: |
10/13/2015
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
1/15/2016
|
|
|
Generator Live |
12/7/2017
|
This Record Last Updated: |
12/19/2017
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
River Pattack Hydro Scheme 9 MW
|
Energy Type: |
Large Hydro |
County: |
Highland Country: Scotland LPA: Highland Council
|
Site ID and Reference: |
411 / C3207
District:
|
Applicant: |
RWE Innogy UK
Application :
14/02344/FUL
|
(Go to search to find Application) |
Site Address: |
Powerhouse Building On The Shore Of Loch Laggan, Kinloch Laggan, Newtonmore
|
|
|
County: |
Highland Region: Scotland
|
OS Coordinates: |
252740 / 252740
|
Development Status: |
Revised
|
Application Submitted: |
6/20/2014
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
4/4/2016
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
7/28/2018 |
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
River Pattack Hydro Scheme
|
Generator Type: |
Hydro
|
Scheme : |
REGO
|
Generator ID: |
G01910HYSC
|
Capacity: |
1995
|
Status: |
Live
|
Accreditation Date: |
6/20/2014
|
|
|
Commission Date: |
8/17/2017
|
|
|
Applicant: |
Blencathra Hydro
|
Applicant Address: |
Gilbert Gilkes & Gordon Ltd
Canal Iron Works
Canal Head North
KENDAL
LA9 7BZ
England
|
Address: |
River Pattack Hydro Scheme
Ardverikie Estate
Kinlochlaggan
Newtonmore
PH20 1BX
Scotland
|
|
Assumptions: Capacity: 1995kW 1.995 MW, Thus over the month Capacity * 720 hours per month = 1436.4 MWh
|
Output Period |
LECs Issued |
ROCs Issued |
REGO Certs |
Capacity Factor |
Status |
| | | 1443 | 72.33% | Issued | | | | 984 | 49.32% | Issued | | | | 714 | 35.79% | Issued | | | | 982 | 49.22% | Issued | | | | 1245 | 62.41% | Issued | | | | 705 | 35.34% | Issued | | | | 835 | 41.85% | Issued | | | | 816 | 40.90% | Issued |
|
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|