Lynmouth (Hydro , Active) Location in the UK : England, Lynmouth, Devon Type of installation: Hydro on/offshore: on Turbines :0 Capacity : 0.305 MW Approx Date of 1st power generation:
/YES
The power station was built on the West Lyn, making use of the huge drop of the river in its last mile. A 20 inch pipeline feeds two turbines, each generating about 300 kilowatts of power.
Relationship |
Company (For:
Lynmouth
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
MW
|
Energy Type: |
|
County: |
Country: LPA:
|
Site ID and Reference: |
/
District:
|
Applicant: |
Application :
|
(Go to search to find Application) |
Site Address: |
|
|
|
County: |
Region:
|
OS Coordinates: |
/
|
Development Status: |
|
Application Submitted: |
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Site Name: |
|
Generator Type: |
|
Scheme : |
|
Generator ID: |
|
Capacity: |
|
Status: |
|
Accreditation Date: |
|
|
|
Commission Date: |
|
|
|
Applicant: |
|
Applicant Address: |
|
Address: |
|
Project Info |
Seaflow Project LYNMOUTH, N Devon This project involved the development of an "underwater windmill" which can generate a maximum of 300kW in a 2.7m/s current (5.5 knots) using an 11m diameter rotor,
Worlds First Open Sea Tidal Turbine The first tidal turbine generator in open-sea in the world was installed 1 mile off the coast of LYNMOUTH, Devon, in spring 2003 by Bristol-based Marine Current Turbines (MCT)
The LYNMOUTH Marine Turbine The turbine started generating electricity on 30th May 2002. At a depth of 65-ft (20 m), it presents no danger to shipping. The 52-ft (16 m) blades revolve at between 12 and 15 rpm ensuring there is no interference with marine life.
Exmoor National Park
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|