Sorry I found no matches, Please try again. 176
vid = 4635pws_id = 353881pws_id = 353881
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.217.228.195 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Red Gap Moor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Red Gap Moor Wind Farm (Wind , Active)

 General Information.

Location in the UK : England, TS22 5PA    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 16 MW
Approx Date of 1st power generation: December 2016

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Airvolution Energy Under Construction
British Telecom are owners??

 Turbine Make and Specs

Model: Senvion M104 Start Speed: 4
Capacity: 3.4 Optimal Speed: 11
Rotor Diameter: 104 Stop Speed: 25
Hub Height 74   Avg for all turbines:74 Avg. Elevation: 53
Web Page: http://www.repower.de/fileadmin/download/produkte/RE_PP_3.4M104_uk.pdf
Comment:

 Address

Sunderland Road,Wolviston, Billingham, Cleveland

 Associated Companies.

Relationship Company (For: Red Gap Moor )
DeveloperAirvolution
OperatorAirvolution
OwnerAirvolution
ConsultantSgurr Eenergy

 DECC Data on this Project: Red Gap Moor :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Red Gap Moor Wind Farm     12.5 MW
Energy Type: Wind Onshore
County: Cleveland     Country: England     LPA: Hartlepool Borough Council
Site ID and Reference: 4415 / A0149     District:
Applicant: Capital Dynamics     Application : H/2009/0231 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 12.5
Site Address: Sunderland Road,Wolviston, Billingham, Cleveland
  TS22 5PA
County: Cleveland Region: North East
OS Coordinates: 443942 / 443942
Development Status: Operational
Application Submitted: 5/20/2009 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 5/26/2016    
Generator Live 2/15/2017 This Record Last Updated: 8/31/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Red Gap Moor: Wind :

Site Name: Red Gap Moor
Generator Type: On-shore wind (RO code = RQ)
Scheme : RO Generator ID: R00381RQEN
Capacity: 12400 Status: Live
Accreditation Date: 5/20/2009    
Commission Date: 1/28/2017    
Applicant: Red Gap Wind Farm Limited
Applicant Address: Red Gap Wind Farm Limited 1030 Centre Park Slutchers Lane Warrington WA1 1QL England
Address: Red Gap Farm Wolviston Billingham Stockton-on-Tees TS225PA England

Site Name: Red Gap Moor
Generator Type: Wind
Scheme : REGO Generator ID: G03023NWEN
Capacity: 12400 Status: Live
Accreditation Date: 5/20/2009    
Commission Date: 1/28/2017    
Applicant: Red Gap Wind Farm Limited
Applicant Address: Red Gap Wind Farm Limited 1030 Centre Park Slutchers Lane Warrington WA1 1QL England
Address: Red Gap Farm Wolviston Billingham Stockton-on-Tees TS225PA England
 
Assumptions: Capacity: 12400kW 12.4 MW,
Thus over the month Capacity * 720 hours per month = 8928 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/03/2018 2671 21.54% Issued
01/02/2018 2571 20.73% Issued
01/01/2018 3452 27.84% Issued
01/12/2017 3446 27.79% Issued
01/11/2017 3377 27.23% Issued
01/10/2017 630 5.08% Issued
01/09/2017 475 3.83% Issued
01/09/2017 260 2.10% Issued
01/08/2017 2242 18.08% Issued
01/07/2017 1856 14.97% Issued
01/06/2017 2680 21.61% Issued
01/05/2017 2202 17.76% Issued
01/04/2017 2400 19.35% Issued
01/03/2017 2782 22.44% Issued
01/02/2017 2376 19.16% Issued
01/01/2017 36 0.29% Issued

 Calculations


Capacity: 25
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 1/15/2025
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 25 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 353881

Project Info
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School