Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBin Mountain Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Bin Mountain Wind Farm (Wind , Active) Location in the UK : N.Ireland, BT81 7QY Type of installation: Wind on/offshore: on Turbines :6 Capacity : 9 MW Approx Date of 1st power generation: September 2007
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
The wind farm capacity is 9MW. Bin Mountain will save over 20,000 tonnes of CO2 emissions per year and power more than 5,000 homes.
Model: |
GE 1.5 - 77
|
Start Speed: |
4
|
Capacity: |
1.5
|
Optimal Speed: |
15
|
Rotor Diameter: |
77
|
Stop Speed: |
25
|
Hub Height |
60 Avg for all turbines:50
|
Avg. Elevation: |
0
|
Web Page: |
http://tinyurl.com/mj649ee |
Comment: |
GEs Class I 1.5-77 wind turbine. GE advanced its original Class I wind turbine, the 1.5-70.5, with increased rotor length, and controls technology resulting in a greater annual energy production.
|
Bin Mountain Wind Farm (NI) Ltd - A (5/2/07) Killeen Castlederg BT81 7QY Northern Ireland
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Bin Mountain 9 MW
|
Energy Type: |
Wind Onshore |
County: |
Co. Tyrone Country: Northern Ireland LPA: Northern Ireland Planning Service
|
Site ID and Reference: |
3113 / N00050W
District:
|
Applicant: |
Greencoat UK Wind
Application :
J/2004/0295/F
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
6 |
Turbine Capacity: |
1.5 |
Height of Turbines: |
|
Calculated capacity: |
9 |
Site Address: |
Lough Hill
Castle Craig, Curraghmacall
Drummahon,
|
|
|
County: |
Co. Tyrone Region: Northern Ireland
|
OS Coordinates: |
38520 / 38520
|
Development Status: |
Operational
|
Application Submitted: |
5/4/2001
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
12/1/2006
|
|
|
Generator Live |
2/1/2007
|
This Record Last Updated: |
1/5/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Capacity: 18 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 25 m/s (55.925 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 11/21/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Nine offshore wind farm projects awarded in UK auction The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|