Teeside Energy from Waste Plant

Teeside (Waste , Active, Waste Anaerobic Digestion)

 General Information.

Location in the UK : England,    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 4.8 MW
Approx Date of 1st power generation: February 2015

/YES

 Comment

B F BIO GAS LTD Operational

 Address

Forty Foot Road, Teeside

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Teeside )

 DECC Data on this Project: Teeside :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Teesside Green Energy Plant (Waste AD)     4.8 MW
Energy Type: Anaerobic Digestion
County: Cleveland     Country: England     LPA: Middlesbrough Council
Site ID and Reference: 385 / B0596     District:
Applicant: B F BIO GAS     Application : M/FP/0216/11/P (Go to search to find Application)
Site Address: Forty Foot Road, Teeside
 
County: Cleveland Region: North East
OS Coordinates: 448771 / 448771
Development Status: Operational
Application Submitted: 2/28/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 4/25/2013    
Generator Live 2/20/2015 This Record Last Updated: 8/3/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Teeside: Waste :

Project Info
In total, six offshore wind projects with a combined capacity of 5,466MW
The six selected projects are the 1,200MW Doggerbank Creyke Beck A P1, the 1,200MW Doggerbank Creyke Beck B P1, the 1,200MW Doggerbank TEESIDE A P1, the 12MW Forthwind, the 454MW Seagreen Phase 1, and the 1,400MW Sophia Phase 1.

©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School