Loading
Page views this IP this session = 2 of 5 unsubscribed pagesTeeside Energy from Waste Plant
Teeside (Waste , Active, Waste Anaerobic Digestion) Location in the UK : England, Type of installation: Waste on/offshore: on Turbines :0 Capacity : 4.8 MW Approx Date of 1st power generation: February 2015
/YES
B F BIO GAS LTD Operational Forty Foot Road, Teeside
Relationship |
Company (For:
Teeside
) |
Sorry I found no matches, Please try again.
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Teesside Green Energy Plant (Waste AD) 4.8 MW
|
Energy Type: |
Anaerobic Digestion |
County: |
Cleveland Country: England LPA: Middlesbrough Council
|
Site ID and Reference: |
385 / B0596
District:
|
Applicant: |
B F BIO GAS
Application :
M/FP/0216/11/P
|
(Go to search to find Application) |
Site Address: |
Forty Foot Road, Teeside
|
|
|
County: |
Cleveland Region: North East
|
OS Coordinates: |
448771 / 448771
|
Development Status: |
Operational
|
Application Submitted: |
2/28/2011
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
4/25/2013
|
|
|
Generator Live |
2/20/2015
|
This Record Last Updated: |
8/3/2015
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
In total, six offshore wind projects with a combined capacity of 5,466MW The six selected projects are the 1,200MW Doggerbank Creyke Beck A P1, the 1,200MW Doggerbank Creyke Beck B P1, the 1,200MW Doggerbank TEESIDE A P1, the 12MW Forthwind, the 454MW Seagreen Phase 1, and the 1,400MW Sophia Phase 1.
|
|
©2018
Simon Mallett |
Latest News Added |
Larport Solar Farm The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity. Date and Time of entry: Thursday, January 2, 2025 00:00
Larport Solar Farm Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor Date and Time of entry: Thursday, January 2, 2025 00:00
Bracks Solar Farm Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*. Date and Time of entry: Thursday, January 2, 2025 00:00
Northfield House Farm Solar PV Park, UK Northfield House Farm Solar PV Park is a 26MW solar PV power project. Date and Time of entry: Thursday, January 2, 2025 00:00
Streetfields and Northfield House solar 54,400MWh
renewable energy generated per year Date and Time of entry: Thursday, January 2, 2025 00:00
|
|
©2017
Simon Mallett |
|