Beddington Energy from Waste Plant

Beddington (Waste , Agreed/Planning, Waste - EFW)

 General Information.

Location in the UK : England, CR0 4TD    
Type of installation: Waste    on/offshore: on
Turbines :0  Capacity : 26 MW
Approx Date of 1st power generation:

/YES

 Comment

I have combined Beddington EFW , Landfill and AD into a single project as all on one site and all waste related.

 Address

Beddington Farmlands Waste Management Facility, Beddington Lane, Beddington

 Associated Companies.

Relationship Company (For: Beddington )
DeveloperViridor
OwnerViridor
OperatorViridor

 DECC Data on this Project: Beddington :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Beddington EfW     26 MW
Energy Type: EfW Incineration
County: Greater London     Country: England     LPA: London Borough of Sutton
Site ID and Reference: 942 / AA874     District:
Applicant: Viridor     Application : D2012/66220 (Go to search to find Application)
Site Address: Beddington Farmlands Waste Management Facility, Beddington Lane, Beddington
  CR0 4TD
County: Greater London Region: London
OS Coordinates: 529039 / 529039
Development Status: Operational
Application Submitted: 7/25/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/1/2015    
Generator Live 11/1/2019 This Record Last Updated: 4/29/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Beddington EfW     26 MW
Energy Type: EfW Incineration
County: Greater London     Country: England     LPA: London Borough of Sutton
Site ID and Reference: 942 / AA874     District:
Applicant: Viridor     Application : D2012/66220 (Go to search to find Application)
Site Address: Beddington Farmlands Waste Management Facility, Beddington Lane, Beddington
  CR0 4TD
County: Greater London Region: London
OS Coordinates: 529039 / 529039
Development Status: Operational
Application Submitted: 7/25/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date: 12/1/2015    
Generator Live 11/1/2019 This Record Last Updated: 4/29/2020
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

Site Name: Beddington AD Facility (Waste AD)     2 MW
Energy Type: Anaerobic Digestion
County: Greater London     Country: England     LPA: London Borough of Sutton
Site ID and Reference: 310 / A0375     District:
Applicant: Viridor     Application : D2010/62424 (Go to search to find Application)
Site Address: Beddington Lane, Beddington
  CR0 4TH
County: Greater London Region: London
OS Coordinates: 530006 / 530006
Development Status: Planning Application Withdrawn
Application Submitted: 3/2/2010 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 7/28/2017
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 7/7/2017    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Beddington: Waste :

Site Name: Beddington Landfill Power Generation - D
Generator Type: Landfill Gas (REGO code = LG)
Scheme : REGO Generator ID: G00493LGEN
Capacity: 5057.4 Status: Live
Accreditation Date: 3/2/2010    
Commission Date: 11/11/2003    
Applicant: Viridor Waste Disposal Ltd
Applicant Address: Viridor House Youngman Place Priory Bridge Road Taunton TA1 1AP England
Address: Beddington Landfill Power Generation - D Beddington Farmlands Landfill 105 Beddington Lane Croydon CR0 4TD England
 
Assumptions: Capacity: 5057.4kW 5.0574 MW,
Thus over the month Capacity * 720 hours per month = 3641.328 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
01/04/2017 3066 60.62% Issued
01/03/2017 3082 60.94% Issued
01/02/2017 2611 51.63% Issued
01/01/2017 2627 51.94% Issued
Dec-16 03128 3128 61.85% Issued
Nov-16 03258 3258 64.42% Issued
Oct-16 03110 3109 61.47% Issued
Sep-16 03112 3113 61.55% Issued
Aug-16 03040 3040 60.11% Issued
Jul-16 02918 2913 57.60% Issued
Jun-16 03085 3076 60.82% Issued
May-16 03075 3075 60.80% Issued
Apr-16 02976 2976 58.84% Issued
Feb-16 03440 3440 68.02% Redeemed
Jan-16 03526 3526 69.72% Redeemed
Oct-15 03465 3465 68.51% Redeemed
Sep-15 03283 3284 64.93% Redeemed
Aug-15 03503 3474 68.69% Redeemed
Jul-15 36093609 3596 71.10% Redeemed
Jun-15 31853185 3172 62.72% Redeemed
May-15 33123313 3295 65.15% Redeemed
Apr-15 33853385 3352 66.28% Redeemed
Mar-15 34733472 3424 67.70% Redeemed
Feb-15 32403240 23 0.45% Expired
Jan-15 34003399 3380 66.83% Redeemed
Dec-14 32723273 3245 64.16% Redeemed
Nov-14 30543053 3019 59.69% Redeemed
Oct-14 33283328 3285 64.95% Redeemed
Sep-14 33423343 3314 65.53% Redeemed
Aug-14 31713171 48 0.95% Expired
Jul-14 28172818 56 1.11% Expired
Jun-14 32423242 56 1.11% Redeemed
May-14 32213222 3221 63.69% Redeemed
Apr-14 33153315 3315 65.55% Redeemed
Mar-14 33623362 3362 66.48% Redeemed
Feb-14 29462946 2946 58.25% Redeemed
Jan-14 32263226 3225 63.77% Redeemed
Dec-13 33143314 3314 65.53% Redeemed
Nov-13 32453245 103 2.04% Redeemed
Oct-13 34153415 3415 67.52% Redeemed
Sep-13 28782879 1 0.02% Redeemed
Aug-13 29012901 2901 57.36% Redeemed
Jul-13 29332934 2933 57.99% Redeemed
Jun-13 32083208 3208 63.43% Redeemed
May-13 32593259 3259 64.44% Redeemed
Apr-13 32953294 3295 65.15% Redeemed
Mar-13 35163517 3517 69.54% Retired
Feb-13 27142714 2714 53.66% Retired
Jan-13 32063206 3206 63.39% Retired
Dec-12 33243324 3324 65.73% Retired
Nov-12 30593059 3060 60.51% Retired
Oct-12 31033102 3102 61.34% Redeemed
Sep-12 31603160 3160 62.48% Redeemed
Aug-12 32173218 3217 63.61% Redeemed
Jul-12 31013100 3100 61.30% Redeemed
Jun-12 27532753 2753 54.44% Redeemed
May-12 30403041 3040 60.11% Redeemed
Apr-12 27122712 2712 53.62% Redeemed
Mar-12 28372838 2837 56.10% Redeemed
Feb-12 23702370 2369 46.84% Redeemed
Jan-12 28712871 2871 56.77% Redeemed
Dec-11 30733073 3073 60.76% Redeemed
Nov-11 22922292 2292 45.32% Redeemed
Oct-11 25052504 2504 49.51% Redeemed
Sep-11 26362636 2636 52.12% Redeemed
Aug-11 27962796 2796 55.29% Redeemed
Jul-11 24262427 2426 47.97% Redeemed
Jun-11 17271727 1727 34.15% Redeemed
May-11 20062006 2006 39.66% Redeemed
Apr-11 16861686 1686 33.34% Redeemed
Mar-11 18901890 1890 37.37% Redeemed
Feb-11 20822082 2082 41.17% Redeemed
Jan-11 20022002 2003 39.61% Redeemed
Dec-10 19101910 1909 37.75% Redeemed
Nov-10 24642464 2464 48.72% Redeemed
Oct-10 25022502 2502 49.47% Redeemed

Project Info
Sorry I found no matches, Please try again.
©2018 Simon Mallett
Latest News Added
Larport Solar Farm
The land identified for the solar project is to the south of the Clay Hill Pit Substation at Dormington and has been chosen for its potential to deliver solar powered electricity.
Date and Time of entry: Thursday, January 2, 2025 00:00

Larport Solar Farm
Larport Solar Farm is a 45MW project in Herefordshire, UK. It was the first solar PV project developed by Conrad Energy. Ethical Power was selected as the principal contractor
Date and Time of entry: Thursday, January 2, 2025 00:00

Bracks Solar Farm
Bracks Farm Solar Park Limited is building a 30MWp solar farm in Cambridgeshire. It has the capacity to produce enough electricity to power approximately 8,000 households per year*.
Date and Time of entry: Thursday, January 2, 2025 00:00

Northfield House Farm Solar PV Park, UK
Northfield House Farm Solar PV Park is a 26MW solar PV power project.
Date and Time of entry: Thursday, January 2, 2025 00:00

Streetfields and Northfield House solar
54,400MWh renewable energy generated per year
Date and Time of entry: Thursday, January 2, 2025 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School