Sorry I found no matches, Please try again. 176
vid = 4875pws_id = 371414pws_id = 371414 Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.224.31.90 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Brown Muir Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Brown Muir Wind Farm (Wind , Proposed)

 General Information.

Location in the UK : Scotland,    
Type of installation: Wind    on/offshore: on
Turbines :19  Capacity : 57 MW
Approx Date of 1st power generation:

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

 Turbine Make and Specs

Model: Start Speed:
Capacity: Optimal Speed:
Rotor Diameter: Stop Speed:
Hub Height   Avg for all turbines: Avg. Elevation:
Web Page:
Comment:

 Address

within Moray, 5km north-west of Rothes and to the east of the A941

 Associated Companies.

Relationship Company (For: Brown Muir )
Developervento ludens Ltd

 DECC Data on this Project: Brown Muir :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Brown Muir Wind Farm     57 MW
Energy Type: Wind Onshore
County: Grampian     Country: Scotland     LPA: Scottish Government (S36)
Site ID and Reference: 3833 / AA574     District:
Applicant: Vento Ludens     Application : (Go to search to find Application)
For Wind Farms  
Number of Turbines: 19 Turbine Capacity: 3
Height of Turbines: Calculated capacity: 57
Site Address: within Moray, 5km north-west of Rothes and to the east of the A941
 
County: Grampian Region: Scotland
OS Coordinates: 327075 / 327075
Development Status: Revised
Application Submitted: 6/20/2012 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 8/19/2013
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 8/15/2013    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Brown Muir: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 371414

Project Info
Windfarm judgement day
PLANNING officials are recommending refusal for a proposed wind farm near Rothes. Renewable company Vento Ludens wants to build a 12-turbine development on land at BROWN MUIR.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School