Loading
Page views this IP this session = 1 of 10 unsubscribed pagesBrown Muir Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Brown Muir Wind Farm (Wind , Proposed) Location in the UK : Scotland, Type of installation: Wind on/offshore: on Turbines :19 Capacity : 57 MW Approx Date of 1st power generation:
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Model: |
|
Start Speed: |
|
Capacity: |
|
Optimal Speed: |
|
Rotor Diameter: |
|
Stop Speed: |
|
Hub Height |
Avg for all turbines:
|
Avg. Elevation: |
|
Web Page: |
|
Comment: |
|
within Moray, 5km north-west of Rothes and to the east of the A941
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Brown Muir Wind Farm 57 MW
|
Energy Type: |
Wind Onshore |
County: |
Grampian Country: Scotland LPA: Scottish Government (S36)
|
Site ID and Reference: |
3833 / AA574
District:
|
Applicant: |
Vento Ludens
Application :
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
19 |
Turbine Capacity: |
3 |
Height of Turbines: |
|
Calculated capacity: |
57 |
Site Address: |
within Moray, 5km north-west of Rothes and to the east of the A941
|
|
|
County: |
Grampian Region: Scotland
|
OS Coordinates: |
327075 / 327075
|
Development Status: |
Revised
|
Application Submitted: |
6/20/2012
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
8/19/2013
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
8/15/2013 |
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
|
Project Info |
Windfarm judgement day PLANNING officials are recommending refusal for a proposed wind farm near Rothes.
Renewable company Vento Ludens wants to build a 12-turbine development on land at BROWN MUIR.
|
|
©2018
Simon Mallett |
Latest News Added |
Case Study - Medium Wind n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00
Little Crow Solar Park Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe. Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00
How many more wind turbines will the UK build?. The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030. Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
Surging seas are coming for us all, warns UN chief The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00
|
|
©2017
Simon Mallett |
|