Sorry I found no matches, Please try again. 176
vid = 4880pws_id = pws_id = Sorry I found no matches, Please try again.

--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 18.119.192.2 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Llys Dymper Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Llys Dymper Wind Farm (Wind , Proposed)

 General Information.

Location in the UK : Wales,    
Type of installation: Wind    on/offshore: on
Turbines :17  Capacity : 49.5 MW
Approx Date of 1st power generation:

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Erection of 17 no. Wind Turbines (126 m Tip Height), Control Building / Substation with Secure Compound, Underground Electrical Cables Connecting Turbines to Substation,
(resubmission) Erection of 10 no. Wind Turbines (5 no. at Maximum 100 m Tip Height and 5 no. at Maximum 110 m Tip Height), Provision of Crane Hardstandings, Control Building, Substation, Underground Electrical Cables, Refused 15-05-2014

 Turbine Make and Specs

Model: Start Speed:
Capacity: Optimal Speed:
Rotor Diameter: Stop Speed:
Hub Height   Avg for all turbines: Avg. Elevation:
Web Page:
Comment:

 Address

on the Hiraethog Moor, to the south of Gwytherin and the west of Llansannan

 Associated Companies.

Sorry I found no matches, Please try again.
Relationship Company (For: Llys Dymper )

 DECC Data on this Project: Llys Dymper :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Llys Dymper Wind Farm     23 MW
Energy Type: Wind Onshore
County: Clwyd     Country: Wales     LPA: Conwy County Borough Council
Site ID and Reference: 3848 / AA706     District:
Applicant: Windpower Wales     Application : 0/38695 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 10 Turbine Capacity: 2.2999999999999998
Height of Turbines: Calculated capacity: 23
Site Address: Land at Llys Dymper, Gwytherin, Llanrwst, Conwy
 
County: Clwyd Region: Wales
OS Coordinates: 288420 / 288420
Development Status: Appeal Withdrawn
Application Submitted: 2/16/2012 Planning Permission Granted
Application Determined: Permission refused: 4/9/2014
Construction Date:    
Generator Live This Record Last Updated: 12/9/2015
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged: 1/23/2015
Called In: Appeal Withdrawn: 3/9/2015
Refusal: Appeal Refused:
Granted: Appeal Granted: 4/9/2014

Site Name: Llys Dymper     49.5 MW
Energy Type: Wind Onshore
County: Clwyd     Country: Wales     LPA: Conwy County Borough Council
Site ID and Reference: 3729 / A0415     District:
Applicant: Windpower Wales     Application : 0/37722 (Go to search to find Application)
For Wind Farms  
Number of Turbines: 17 Turbine Capacity: 2.9399999999999999
Height of Turbines: Calculated capacity: 49.98
Site Address: on the Hiraethog Moor, to the south of Gwytherin and the west of Llansannan
 
County: Clwyd Region: Wales
OS Coordinates: 288420 / 288420
Development Status: Revised
Application Submitted: 3/7/2011 Planning Permission Granted
Application Determined: Permission refused:
Construction Date:    
Generator Live This Record Last Updated: 4/2/2012
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn: 9/29/2011    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused:
Granted: Appeal Granted:

 OFGEM Data on this Project: Llys Dymper: Wind :

 Calculations



Alternative Wind Speed: in mph Capacity: 1 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio

Project Info
LLYS DYMPER Turbines REJECTED!
Windpower Wales’ plans for 10 turbines of 110m (360ft) at its LLYS DYMPER wind farm in the Conwy Valley were given the thumbs down today by members of Conwy Council’s Planning Committee.

©2018 Simon Mallett
Latest News Added
Case Study - Medium Wind
n 2016, Green Cat Renewable Developments Limited (GCRD) purchased the Deuchries Wind Farm project after the previous owner decided the project was no longer viable
Source: greencat, Date and Time of entry: Friday, November 22, 2024 00:00

Little Crow Solar Park
Little Crow Solar Park is in Lincolnshire and is situated 2.5km northwest of the village of Broughton and directly to the east of the British steelworks at Scunthorpe.
Source: inrg, Date and Time of entry: Friday, November 22, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School