Sorry I found no matches, Please try again. 176
vid = 4892pws_id = 3716pws_id = 3716
--------------------------------------------------------
(825) Not Logged on, Max pages: 10( 1 Seen ) ID:1 Ind:0 IP: 3.146.107.144 {832) YESU WSHW: 1/10
Loading
Page views this IP this session = 1 of 10 unsubscribed pages

Hill House Farm Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Hill House Farm Wind Farm (Wind , Active)

 General Information.

Location in the UK : Wales, CF35 5DU    
Type of installation: Wind    on/offshore: on
Turbines :0  Capacity : 0 MW
Approx Date of 1st power generation: July 2014

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

13/0727/03 | Erection of a single wind turbine, with maximum blade to height of 77 metres, along with accompanying access track, crane hardstanding, substation, associated underground cabling and temporary construction compound (Observations requested by neighbouring authority). | HILL HOUSE FARM, ST. MARYS HILL, BRIDGEND.

 Turbine Make and Specs

Model: EWT DW52/54 Start Speed: 2.5
Capacity: 0.9 Optimal Speed: 13
Rotor Diameter: 54 Stop Speed: 25
Hub Height 50   Avg for all turbines:50 Avg. Elevation: 0
Web Page: http://www.ewtdirectwind.com/wind-turbines/ewt-wind-turbines/dw5254-900kw.html
Comment: The DIRECTWIND 52/54-900kW is a pitch controlled variable speed wind turbine that combines continuous market driven innovation with highly advanced direct drive technology.

 Address

Hill House Farm St. Mary Hill , Bridgend CF35 5DU

 Associated Companies.

Relationship Company (For: Hill House Farm )
ContractorAlpha Real Renewables

 DECC Data on this Project: Hill House Farm :

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

 OFGEM Data on this Project: Hill House Farm: Wind :

Site Name: G2 Energy Levant
Generator Type: Wind
Scheme : REGO Generator ID: G01495NWWA
Capacity: 480 Status: Live
Accreditation Date:    
Commission Date: 11/7/2014    
Applicant: WIND ENERGY RENEWABLES LLP
Applicant Address: Time Investments 6th Floor Euston Road LONDON NW1 3BG England
Address: Hill House Farm St Mary Hill Bridgend CF35 5DU Wales
 
Assumptions: Capacity: 480kW 0.48 MW,
Thus over the month Capacity * 720 hours per month = 345.6 MWh
Output Period LECs Issued ROCs Issued REGO Certs Capacity Factor Status
119 24.79% Issued
79 16.46% Issued
185 38.54% Redeemed
178 37.08% Redeemed
01/01/2017 131 27.29% Redeemed
01/12/2016 - 31/12/2016 00 109 22.71% Issued
01/11/2016 - 30/11/2016 00 139 28.96% Issued
01/10/2016 - 31/10/2016 00 138 28.75% Issued
01/09/2016 - 30/09/2016 00 119 24.79% Issued
01/08/2016 - 31/08/2016 00 144 30.00% Issued
Jul-16 00 138 28.75% Issued
Jul-16 00 138 28.75% Issued
Jun-16 00 91 18.96% Issued
Jun-16 00 91 18.96% Issued
May-16 00 101 21.04% Issued
Apr-16 00 137 28.54% Issued
Mar-16 00 156 32.50% Redeemed
Feb-16 00 181 37.71% Redeemed
Jan-16 00 200 41.67% Redeemed
Dec-15 00 268 55.83% Redeemed
Nov-15 00 223 46.46% Redeemed
Oct-15 00 102 21.25% Redeemed
Sep-15 00 111 23.13% Redeemed
Aug-15 00 108 22.50% Redeemed
Jul-15 1540 154 32.08% Redeemed
Jun-15 1400 140 29.17% Redeemed
May-15 1850 185 38.54% Redeemed
Apr-15 1290 129 26.88% Redeemed
Mar-15 1460 146 30.42% Redeemed
Feb-15 1110 111 23.13% Redeemed
Jan-15 1920 192 40.00% Redeemed
Dec-14 1870 187 38.96% Redeemed
Nov-14 310 31 6.46% Redeemed
148 30.83% Issued
169 35.21% Issued
137 28.54% Issued
121 25.21% Issued
177 36.88% Issued
116 24.17% Issued
130 27.08% Issued
220 45.83% Issued
182 37.92% Issued
158 32.92% Issued
132 27.50% Issued

 Calculations


Capacity: 0
Start Speed: 5 m/s (11.185 mph)
Optimum Speed: 15 m/s (33.555 mph)
Stop Speed: 25 m/s (55.925 mph)

Local Weather Station:
Elevation of Weather Station:

Date for Wind forecast: 11/21/2024
Wind Speed at Weather Station: mph
Wind Direction:
Outputratio = 0.00
Output of Wind Farm = 0.0

Alternative Wind Speed: in mph Capacity: 0 start: 5 Optimum: 15/ Stop: 25 / wind: / ratio 3716

Project Info
©2018 Simon Mallett
Latest News Added
Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Monday, September 9, 2024 00:00

How many more wind turbines will the UK build?.
The government says it wants to generate enough wind energy to be able to power every home in the UK by 2030.
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Surging seas are coming for us all, warns UN chief
The World Meteorological Organization’s State of the Climate in the South West Pacific, external report says this region faces a triple whammy of an accelerating rise in the sea level, a warming of the ocean and acidification
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Nine offshore wind farm projects awarded in UK auction
The new offshore projects include what will be Europe's largest and second-largest wind farms, Hornsea 3 and Hornsea 4, which will be built off the Yorkshire coast by Ørsted
Source: bbc, Date and Time of entry: Wednesday, September 4, 2024 00:00

Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School